CASE STUDY

A cogeneration gas power


plant to produce electricity Banyan
and steam for Singapore Singapore
Alstom has won a contract with Sembcorp to build and maintain a 1 x 400 MW
gas-fired combined-cycle cogeneration power plant on Singapore’s Jurong Island, an
artificial island created as an offshore industrial base. The first unit is currently under
construction, the second unit which is an option under the contract, is in discussion.
With this addition to its fleet, Sembcorp will roughly double its generation capac-
ity in Singapore to over 1,600 MW, strengthening its position in Singapore’s
power market. As well as providing electricity, the new power plant will supply
approximately 200 ton/hr of process steam to the petrochemical and chemical
manufacturing industries located in the Jurong Island area.
Alstom has a strong relationship with Sembcorp, having already built Singapore’s
first cogeneration plant, Pulau Sakra, which began commercial operation in 2001.
The KA26 is among the most efficient and reliable technologies currently avail-
able. With its great flexibility and high part-load efficiency, it is perfectly suited for
Singapore’s competitive electricity market.

Customer: ���������������������������� Sembcorp Industries Ltd


Scope of supply: ������������������ Full turnkey EPC* contract for a 1 x KA26-1 single-shaft
CCPP (with the option to exercise 2nd unit) including:
- Overall plant engineering
- Overall procurement and logistics
- Civil, electrical and mechanical construction
- Comprehensive commissioning of the power plant
An 18-year O&M* contract for the KA26 Power Train
Electrical output: ����������������� 400 MW
Fuel: ������������������������������������� Natural Gas
Cooling System: ������������������� Direct Seawater
Application: �������������������������� Power Generation

Advantages
• Prominent operational and fuel flexibility
• High reliability
• Superior part-load performance
• Low NOx emissions over a wide load range.
With its environmental and economic advantages, this plant is another example
of Alstom’s capability to deliver clean, integrated power solutions.
* EPC = Engineering, Procurement, Construction
* O&M = Operation & Maintenance contract
TPW/LEAF/BNNSGP12/eng/THP/04.12/FR/7597. © ALSTOM 2012. All rights reserved. Information contained in this document is indicative only.
No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend
on the technical and commercial circumstances. It is provided without liability and is subject to change without notice.
Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Our Plant Integrator™ approach offers more value for customers

The Plant Integrator™ concept is Alstom’s unique way of creating more value for customers. We combine outstanding expertise
at a component and plant level, as we are both an equipment designer and manufacturer. In addition, we are an Engineering,
Procurement and Construction (EPC) contractor with proven worldwide references. Through close collaboration, we guarantee
that our customers meet their business objectives and serve their market more effectively. There are six Plant Integrator™
factors that help increase the Net Present Value for our customers.

Plant IntegratorTM Factors Customer Benefits


INVESTMENT Optimised capital investment
LEAD TIME Shorter lead times to produce electricity faster
Higher power plant efficiency for increased power output over a wide range of operational modes
PERFORMANCE Reduced emissions to meet environmental responsibility
Optimised operation & maintenance (O&M) costs
AVAILABILITY & FLEXIBILITY Better reliability, availability and flexibility
LIFE EXTENSION Extended power plant life options

PROJECT FEATURES

The Banyan Project benefits from the superior integration resulting from Alstom’s project management skills, EPC capabilities and
state-of-the-art key components:

• 1 x Alstom GT26 gas turbine equipped with the sequential


dry low NOx combustion system for high efficiency and
environmentally compatible operation
• 1 x Alstom horizontal, triple-pressure reheat,
drum-type heat recovery steam generator
• 1 x compact, state-of-the-art Alstom STF15C steam
turbines with axial exhaust for flexible, highly efficient
operation
• 1 x high efficiency Alstom TOPGAS hydrogen-cooled
turbo-generator
• Direct seawater cooling system Arrangement
• Alstom ‘ALSPA Series 6’ integrated control system.
Alstom contributes to the protection of the environment. This leaflet is printed on environmentally-friendly paper.

An environmentally friendly plant with high all-round efficiency

TPW/LEAF/BNNSGP12/eng/THP/04.12/FR/7597. © ALSTOM 2012. All rights reserved. Information contained in this document is indicative only.
No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend
on the technical and commercial circumstances. It is provided without liability and is subject to change without notice.
Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

You might also like