Download as pdf
Download as pdf
You are on page 1of 3
CELADON PARK TOWER 3 Fetutuena St Prdject Manager cs Ae ere = 31" st cor 2" ave, REQUEST FOR APPROVAL Mate Tooele: = ee, a ee eo HeT000.20" OF aR NETALATEN rool we soul Constant eae Seas oar mes = esata 123 oe . ae Ree Se es cm | / ‘date received date required we a pep Cada ae os Structural Consultant ha roa oh above asin ot Reva & Aproal ‘transmit evelopment Cor; fom tal Makati Development Corp. a, ary Aste 8 minds onaaflnied) a D dy ie & mabe ae Soe a a Ta a | no bones coat nL recsveiby: Makati Development Corp. ‘her ronars on above arn = ies ua Sono a eae NAL SI ee INA AS pS ‘Too0 Soper Binge Cor ous Cunttion se Samer neon lethodology of Rebar Installation ‘Haul fabricated bars from the fabrication area/ staging ara to the site for installation. Iwill be assisted by a mobile crane ora tower crane. Hauling small items such as ‘ies and chair bars, an improvised basket should be used. Install necessary scaffoldings and lifelines prior to installation of rebar especially at ‘columns and perimeter beams and girders, Use necessary personal protective ‘equipments such as safety harnesses and gloves, In installing reinforcement bars for mat footings, bottoms bars ate tobe installed frst thon chair bars are to be position in place before the top bars are installed, For columns tie is ted on the footing as a guide in the installation of start bars ‘Ones the camer vertical bars ae putin place, set of ties are to be tied up to hold the vertical bars, then the remaining vertical bars are to be installed. Aer that ies will hhave to be completed. Vertial bars are tobe spliced only a the spicing zone required by the structural designer. For columns, it should be at the middle H13 ofthe ealurmn Where HY i the clear height of column. Prior to spicing ties up to the next floor level should be installed. Then the vertiesl bars are to be lapped, and fabricated concrete spacers are to be put in place before the forms are installed. Same methodology with shear walls and retaining walls For beams and girders, Top and bottom bars shouldbe put in place and tied up together at he center of span for easier placement of ties. Once the required numbers of stirrups are put in place, it will be tied up with the main bar with correct spacing based on the ‘approved cutting lst. Rebars are to he spliced only atthe splicing zone required by the structural designer, For top har, splicing should be within the center but will not 20 beyond L/4 of clear span from the face of column. And for the bottom bars, the splice length center should be 0.221 from the face ofthe column. Extra top bars should 0 until 1/4 from face of column and whichever length is larger from the adjacent span will govern, Extra bottom bars are placed 0.1651 of clear span from each column face. Strrups on splicing will have spacing 10mm or as its tated on the designer's general notes. Shear bars ofthe same diameter of the main bar is installed i there are onstruction joins. To have a correct eanerete covering for the bar, a fabricated cnerete spacers are tied tothe bas. For slabs, bottom bars are to be placed first. All necessary embeddment for eleceial -fnechianical, fire protection, ete, are tobe installed by the trades in charge prior tothe ‘stallation of top bars. Then concrete spacers are to be placed between the bottom bars and the slab forms. Also, a chair bar will be place between the bottom bars and the top bars,

You might also like