CELADON PARK TOWER 3
Fetutuena St
Prdject Manager
cs Ae ere
= 31" st cor 2" ave,
REQUEST FOR APPROVAL Mate Tooele:
= ee,
a ee
eo HeT000.20" OF aR NETALATEN
rool we
soul Constant
eae Seas oar
mes =
esata 123 oe
. ae Ree
Se es cm
| / ‘date received date required we
a
pep Cada ae os
Structural Consultant
ha roa oh above asin ot Reva & Aproal
‘transmit evelopment Cor; fom
tal Makati Development Corp. a,
ary
Aste 8 minds onaaflnied) a D dy ie & mabe
ae
Soe a a Ta a |
no bones coat
nL
recsveiby: Makati Development Corp.
‘her ronars on above arn =
ies
ua Sono
aeae NAL SI ee INA AS
pS ‘Too0 Soper Binge Cor ous Cunttion se Samer neon
lethodology of Rebar Installation
‘Haul fabricated bars from the fabrication area/ staging ara to the site for installation.
Iwill be assisted by a mobile crane ora tower crane. Hauling small items such as
‘ies and chair bars, an improvised basket should be used.
Install necessary scaffoldings and lifelines prior to installation of rebar especially at
‘columns and perimeter beams and girders, Use necessary personal protective
‘equipments such as safety harnesses and gloves,
In installing reinforcement bars for mat footings, bottoms bars ate tobe installed frst
thon chair bars are to be position in place before the top bars are installed,
For columns tie is ted on the footing as a guide in the installation of start bars
‘Ones the camer vertical bars ae putin place, set of ties are to be tied up to hold the
vertical bars, then the remaining vertical bars are to be installed. Aer that ies will
hhave to be completed. Vertial bars are tobe spliced only a the spicing zone required
by the structural designer. For columns, it should be at the middle H13 ofthe ealurmn
Where HY i the clear height of column. Prior to spicing ties up to the next floor level
should be installed. Then the vertiesl bars are to be lapped, and fabricated concrete
spacers are to be put in place before the forms are installed. Same methodology with
shear walls and retaining walls
For beams and girders, Top and bottom bars shouldbe put in place and tied up together
at he center of span for easier placement of ties. Once the required numbers of stirrups
are put in place, it will be tied up with the main bar with correct spacing based on the
‘approved cutting lst. Rebars are to he spliced only atthe splicing zone required by
the structural designer, For top har, splicing should be within the center but will not
20 beyond L/4 of clear span from the face of column. And for the bottom bars, the
splice length center should be 0.221 from the face ofthe column. Extra top bars should
0 until 1/4 from face of column and whichever length is larger from the adjacent
span will govern, Extra bottom bars are placed 0.1651 of clear span from each column
face. Strrups on splicing will have spacing 10mm or as its tated on the designer's
general notes. Shear bars ofthe same diameter of the main bar is installed i there are
onstruction joins. To have a correct eanerete covering for the bar, a fabricated
cnerete spacers are tied tothe bas.
For slabs, bottom bars are to be placed first. All necessary embeddment for eleceial
-fnechianical, fire protection, ete, are tobe installed by the trades in charge prior tothe
‘stallation of top bars. Then concrete spacers are to be placed between the bottom
bars and the slab forms. Also, a chair bar will be place between the bottom bars and
the top bars,