CV.

GIA SENTOSA
Mengerjakan : Struktur,Finishing,Pengelasan,Mecanical,Electrikal,Dll
D/A Perum Keroncong EP. 18/06 Jati Uwung Tangerang-Banten
Telp.(021) 5930 0015 Hp. 0813 1420 0148

Kepada Yth. Tanggal 14 April 2019


PT.TOTAL BANGUN PERSADA.Tbk
Proyek : CHITALAND TOWER
Up : Bapak Ir.Andi Widiahanto RM.MM.MT.
: Bapak Donny K,ST.
Dengan Hormat.
Bersama ini kami ajukan perincian pekerjaan TIE IN TC 2 & CINCIN KOLOM berikut penambahan bahan
sesuai keperluan lapangan dan gambar terlampir.

TC 2 LT 22 (TEMPORARY) UPAH HARGA/UNITE


NO URAIAN PEKERJAAN SAT VOL HARGA SAT JUMLAH
1 Hbeam 250x250x9x14 = 18,5 m1 (Cincin) kg 1.332,00 3.500,00 4.662.000,00
2 Hbeam 300x300x10x15 = 28,48 m1 (Tie in) kg 2.677,12 3.500,00 9.369.920,00
3 Plat T 20x350x350 = 9 pcs (Join) kg 173,00 3.500,00 605.500,00
4 Plat Mall/kupingan = T 30x250x300 = 18 pcs kg 317,93 3.500,00 1.112.737,50
5 Plat T 20x250x250 = 16 pcs (Kopel Cincin+Tutup) kg 157,00 17.000,00 2.669.000,00
6 Plat T 16x300x250 = 8 pcs (Dudukan Cincin) kg 75,36 17.000,00 1.281.120,00
7 Plat T 16x250x250 = 19 pcs (Dudukan Cincin+Stifner) kg 149,15 3.500,00 522.025,00
8 Plat T 16x300x150 = 62 pcs (Stifner Tie in) kg 350,40 3.500,00 1.226.400,00
9 Plat T 16x150x150 = 27 pcs (Stifner plat join) kg 76,30 3.500,00 267.050,00
10 UNP 100x50x5 = 11,2 m1 (Sudutan Cincin) kg 104,90 17.000,00 1.783.286,40
11 Cat Biru Total kg - 650,00 -
12 Baut M 22 A325 + Ring Plat & Ring Per Pcs - 37.500,00 -
13 Pen + Spi D 60x350 Pcs - 500.000,00 -
14 Block Out kolom buat Chemichal anchoor unt 8,00 35.000,00 280.000,00

JUMLAH = 23.779.038,90
PPH 4% = 951.161,56
TOTAL = 24.730.200,46

Demikian perincian kerja ini kami ajukan atas perhatian dan kerja samanya bapak/ibu kami
ucapkan banyak-banyak terimakasih.

HORMAT KAMI
YUDI
(CV.GIA SENTOSA)