Download as pdf
Download as pdf
You are on page 1of 22
a VIBRATING WIRE PIEZOMETER Revision No. 00 EIN OSB - SS— MST = 0004 Date: 08 AUG 2018 ‘CADANGAN PEMBANGUNAN BERCAMPUR YANG MENGANDUNGI PUSAT MEMBELI BELAH, RUANG PEJABAT, PUSAT HIBURAN DAN PANGSAPURI PERKHIDMATAN DI ATAS LOT PTIS3, PTISS, PTISS DAN PTIS6 (DAHULUNYA LOT PT 143), SEKSYENS6 DI JALAN HANG TUAHJALAN PUDU, WILAVAH PERSEKETUAN KUALA LUMPUR, UNTUK: TETUAN BEC DEVELOPMENT SDN.BHD METHOD STATEMENT VIBRATING WIRE PIEZOMETER NAME DESIGNATION SIGNATURE DATE aalac PREPARED | AMIRAH HUSNA 06 AUGUST ENGINEER BY 2019 REVIEWED | MOHAMAD SOFI| PROJECT. 06 AUGUST BY ISMAIL MANAGEF 2019 ‘APPROVED ey CONSULTANT Copyright: Cergas Murni Sdn. Bhd. All right reserved. None of the information contained in this document shall be disclosed outside the recipients own company, and no part of this document may be reproduced or transmitted without the written permission of Cergas Murni Sdn. Bhd. VIBRATING WIRE PIEZOMETER EIN- CMSB - SS MST = 0004 Revision No. 00 Date: 06 AUG 2012 CADANGAN PEMBANGUNAN BERCAMPUR YANG MENGANDUNGI PUSAT MEMBELI BELAH, RUANG PEJABAT, PUSAT HIBURAN DAN FANGSAPURI PERKHIDMATAN DI ATAS LOT PTIS3, PTISS, PTISS DAN 10 2.0 3.0 40 5.0 6.0 7.0 8.0 9.0 PT1S6 (DAHULUNYA LOT PT 143), SEKSYEN 56 DI JALAN HANG TUAH/JALAN PUDU, WILAYAH 'PERSEKETUAN KUALA LUMPUR.UNTUK: TETUAN BBCC DEVELOPMENT SDN.BHD TABLE OF CONTENT OBJECTIVE SCOPE OF WORK REFERENCES RESOURCES, MANPOWER, MACHINERY & MATERIALS WORK METHODOLOGY QUALITY CONTROL PROCEDURE ENVIRONMENTAL, HEALTH AND SAFETY PLAN EMERGENCY RESPONSE PLAN APPENDIX Page 2 of 8 ae VIBRATING WREPIEZOMETER congas Munn Fon Nd a ee 0008 Revision No. 00, Date: 06 AUG 2019 ‘CADANGAN PEMBANGUNAN BERCAMPUR YANG MENGANDUNGI PUSAT MEMBELI BELAH, RUANG PEJABAT, PUSAT HIBURAN DAN PANGSAPURI PERKHIDMATAN DI ATAS LOT PTIS3, PTS, PTIS5 DAN PTIS6 (DAHULUNYA LOT PT 142), SEKSYEN 6 DI JALAN HANG TUAH/JALAN PUDU, WILAVAH ‘PERSEKETUAN KUALA LUMPUR.UNTUK: TETUAN BBCC DEVELOPMENT SDN.BHD OBJECTIVE a) To provide step by step work methodology for installation of vibrating piezometer. b) To ensure the works are carried out in accordance to drawings and specification. ¢) To eliminate / minimize the errors and poor quality of works. 2. SCOPE OF WORK This Method Statement is used to describe the procedure and sequences that will be used in Installation of Vibrating Wire Piezometer. It also provides the details of materials, equipment and relevant document related to the installation of vibrating wire piezometer. REFERENCES The whole procedures and sequences shall comply Contract Drawing and shall be done accordance with the following specification: 4. Project Technical Specification Occupational Safety & Health (OSHA 1994) Factory & Machinery Act 1967 Construction Drawing Project Quality Plan (POP) Traffic Management Plan (TMP) ‘Survey Quality Plan Authority Permits BS 8004: 1986: Code of Practice for Foundations 0. BS 8110: 1997: Structural Use of Concrete the information shown in the BORN AARYN Page 3 0f 8 ea VIBRATING WIRE PIEZOMETER aed EIN- CMSB — SS MST Revision No, 00 ee Date: 06 AUG 2019 CADANGAN PEMBANGUNAN BERCAMPUR YANG MENGANDUNG! PUSAT MEMBELI BELAH, RUANG PEJABAT, PUSAT HIBURAN DAN PANGSAPURI PERKIIDMATAN DI ATAS LOT PT1S3, PTIS4, PISS DAN ‘PTIS6 (DAHULUNYA LOT PT 143), SEKSYEN 56 DI JALAN HANG TUAHALAN PUDU, WILAVAH 'PERSEKETUAN KUALA LUMPUR.UNTUK: TETUAN BBCC DEVELOPMENT SDN.BHD 4, RESOURCES, MANPOWER, MACHINERY & MATERIALS 4.1 Materials / Machinery © Piezometer instrument set © Drill casings © Wire cables * Colored adhesive tapes © Cement grout * Bentonite pellet © Tremie hose 4.2 Manpower * Project Manager * Construction Manager © Safety & Health Officer © Project Engineer / Supervisors * QAQC Engineer * Surveyor © Skilled Workers © General Workers Page 4 of 8 aa VIBRATING WIRE PIEZONETER Ae EIN - CMSB ~ SS -MST = 0008 Revision No. 00 Date: 06 AUG 2018 ‘CADANGAN PEMBANGUNAN BERCAMPUR YANG MENGANDUNGI PUSAT MEMBELI BELAH, RUANG PEJABAT, PUSAT HIBURAN DAN PANGSAPURI PERKHIDMATAN DI ATAS LOT PT1S3, PTIS4, PTISS DAN 5. 'PTIS6 (DAHULUNYA LOT PT 143), SEKSVEN 56 DI JALAN HANG TUAHJALAN PUDU, WILAVAH PERSEKETUAN KUALA LUMPUR.UNTUK: TETUAN BBCC DEVELOPMENT SDX.BHD WORK METHODOLOGY a) Instructions from the Engineer will be received for the installation depth of piezometer tip (A, B1, B2, B3). b) The relevant documents related to the vibrating wire piezometer such as calibration certificate and specification, etc. shall be submitted to the Engineer for approval. ¢) Upon approval, the vibrating wire piezometer will be installed in the rotary wash borehole with nominal diameter of 100mm, cased to the depth where the strata are sufficiently competent for the hole to remain open. d) Three piezometers will be installed in a single borehole. e) All the drill casings will then be withdrawn, leaving to piezometer leads through the casing as each length is removed to complete the installation. f) Where the piezometer is to be installed down a borehole, the length of the pre- attached lead to the piezometer will be sufficiently long to surface at the ground level but kept to a minimum to facilitate casing removal. 9g) The cable will later be spliced up to the full measured length to reach the Instrument House. h) Working to a master color code, the leads will be indi ually identified with bands of colored adhesive tape at 10m intervals. i) Prior to installation at site, the piezometer tip will be pressure tested in a container of water with pressure up to 500 kPa to check for poor connections and functionality. i) Prior to installation at site, the piezometer assembly will be left in a water filled container to allow the temperatures and pressures within the piezometer to stabilize. A ‘Zero Pressure” reading will then be recorded. k) Prior to installation, the borehole will be flushed until all traces of arising have disappeared. 1) The borehole will then be dipped with weighted tape to ensure that the depth is as specified and the borehole is cleared. m) By using measuring tape, the piezometer leads will be marked with a double band ‘of color adhesive tape that does not conflict with any instrument color code, corresponding to the ground level for the required depth, measured to the center of the porous filter. Page 5 of 8 a VIBRATING WIRE PIEZOMETER eee EIN- CMS8_SS— MST Eoin Date: 06 AUG 2019 Revision No, 00 CADANGAN PEMBANGUNAN BERCAMPUR YANG MENGANDUNGI PUSAT MEMBELI BELAH, RUANG PEJABAT, PUSAT HIBURAN DAN PANGSAPURI PERKHIDMATAN DI ATAS LOT PTISS,PTIS4, PTISS DAN PTIS6 (DAHULUNYA LOT PT 143), SEKSYEN 56 DI JALAN HANG TUAHJALAN PUDU, WILAYAH, 'PERSEKETUAN KUALA LUMPUR.UNTUK: TETUAN BBCC DEVELOPMENT SDN.BHD n) If water is not already in the boreholes, water will be added to at least the intended depth of the sand cell and bentonite plug to compact and saturate the sand cell and to also saturate the bentonite pellets. 0) Atthe appropriate time, piezometer will be removed from the water ad immediately lowered down the borehole until the previously marked double band on the twin tubing is at ground level. ) Coarse, clean filter sand will be poured slowly through the water until the sand cell is of the required length. Depths will be taken using the weighted measuring tape, after sufficient time has been allowed for the sand to settle; the sand will be lightly tamped if necessary, q) Areading with the readout will be taken to ensure that the instrument is sensibly indicating the known head of water within the borehole. r)_ The drill casing will be withdrawn until its base is approximately 0.3m below the top of the sand cell. s) The bentonite pellets will be dropped through the water and tamped as necessary until the seal length is as specified. t) The borehole will be backfilled to ground level with bentonite-cement grout, placed by tremie hose inserted to just above the bentonite plug and withdrawing the hose as grouting proceeds as shown in the Figure 1 Page 6 of VIBRATING WIRE PIEZOMETER EIN - CMSB - SS — MST = 0004 Revision No. 00 Date: 06 AUG 2019 ‘CADANGAN PEMBANGUNAN BERCAMPUR YANG MENGANDUNG! PUSAT MEMBELI BELAH, RUANG PEJADAT, PUSAT HIBURAN DAN PANGSAPURI PERKHIDMATAN DI ATAS LOT PTIS3, PT1S4, PTISS DAN PTIS6 (DAHULUNYA LOT PT 143), SEKSYEN 56 DI JALAN HANG TUAIVJALAN PUDU, WILAYAH, PERSEKETUAN KUALA LUMPUR.UNTUK: TETUAN BBCC DEVELOPMENT SDN.BHD MBRATING WIRE PIEZOMETER (VWP) Nore LENGTH A AND B TODE PRED EV iS ERGREER Figure 1: Vibrating Wire Piezometer Page 7 of & aaa \BRATING WIE PIEZOMETER organ Marni Sn Bnd cron SS = 0004 Revision No. 00 Date: 06 AUG 2019 ‘CADANGAN PEMBANGUNAN BERCAMPUR YANG MENGANDUNGI PUSAT MEMBELI BELAH, RUANG PEJARAT, PUSAT HIBURAN DAN PANGSAPURI PERKHIDMATAN DI ATAS LOT PTS, PISS, FTISS DAN PTIS6 (DAHULUNYA LOT PT 43) SEKSYEN 56 DIJALAN HANG TUAHIALAN PUDU, WILAYAH, VPERSUKETUAN KUALA LUMPURUNTUK: TETUAN BCE DEVELOPMENT SDN/BHD 6. QUALITY CONTROL PROCEDURE Prior to the commencement of the works, a Request for Work Inspection (RFWI) form must be filled up by the contractor. This is to ensure that all the work being carried out with quality control and as per the requirement and satisfaction of the SO. All the works shall be recorded inside the checklist based on work trade and must accordance to Project Technical Specification and construction drawings. 7. ENVIRONMENTAL, HEALTH AND SAFETY PLAN Cautious and awareness sign shall be established at location of works. The hazards in a particular activity and the control measures implemented shall be briefed to the workers during safety tool box meeting All workers employed in the project site must have valid CIDB and need to attend the CMSB Safety Induction Course before commencing works at site and attendances shall be recorded in an induction checklist and mandatory to display the induction passport all the time at site. All workers are required to wear Personnel Protective Equipment (PPE) i.e. safety helmets, safety boots and safety vest when working at site. Appropriate lighting should be provided for night work. 8, EMERGENCY RESPONSE PLAN The work shall be carried out in accordance with the Emergency Response Plan when the health and safety of workers are threatened. The plan will be used to manage emergency incidents to protect life, the environment, property and to restore the condition to normal condition in the shortest possible time. Page 8 of 8 ATTACHMENT A tqLIANOISES «= z Te eno woy wirxew=y | a mapa qwrt =1a- wae ouuny yeny Sue} uejer 405 rajanat wou WE KEY = ¥ Fpuuny qweys yex8ueyp ATTACHMENT B DATASHEET ccm VW Piezometers, VWP-3000 Series Pore pressure measurement in soils and rocks & fluid pressures in hydro-fracture and pump tests using the well-proven method of converting fluid pressures ona sensitive diaphragm into a frequency signal VWP-3000 Series Overview Geosense* VWP-3000 Series of Vibrating Wire piezometers use ‘the well-proven method of converting fluid pressures on a sensitive diaphragm into a frequency signal. Frequency signals are particularly suitable for the demanding environment of Civil Engineering applications, since the signals are capable of long transmission distances without degradation, tolerant of wet wiring conditions and resistant to external electrical noise. www.geosense.co.uk APPLICATIONS Pore pressure measurementin sols and rocks Fluid pressures in hydroacture and pump tests FEATURES “Reliable fong-term performance Rugged, sultablefor demanding environments Insensitive to long cablelengths FILTER OPTIONS LAE (Low resistance to air entry) SOusintered stainles steel, Won HAE (High resistance to alr entry) Alumo scate ceramic=1 23 bar CABLE TYPE ‘Type 900 WW Sensor with Fol Screen & Drain Wire ‘Type 920Vented with Drain Wire Type 710Heavy Duty ce @ VWP-3000 Series Models \VWP-3000 (STANDARD) ‘Standard construction with high &elow air entry filters to measure ‘groundwater elevations and pore pressures. \VWP-3310 (STANDARD VENTED) Standard construction but vented to compensate for barometric pressure changes. Available with high & low air entry filters. vywe-3000/3810 \VwP-3100 (HEAVY DUTY) Heavy duty body for direct burial in fills ‘and dam embankments. Available with high & low air entry ltrs, standard and heavy duty cable. ywe-3100 \VWP-3200 (LOW PRESSURE) Low pressure version to measure groundwater elevations and pore pressures. Available with high & low air entry filters, \VWP-3300 (LOW PRESSURE VENTED) Low pressure vented version to compensate for barometric pressure changes. Available with high & low air entry filters. YWP-3400 (DRIVE-IN) Drivesin version available for use with CPT rods \we-3401 (DRIVE-IN) Drive-in version available for use with 1" BSPM rods A range of drive-in adaptors, including R32, are available. vwe-s4co/2401 www.geosense.co.uk VWP-3000 Series Specifications Tree escnrmon PSUR | mance mesowTon |ccunAcy yf, ene TERM. OUNETE war voraieo Sig nase as ensues sci casnes | 8% QOH x aaeg vinson Sites EE ag oe [ete ams 2 BH ey voraso fangs, Tooiase 1s omawrs arms

You might also like