Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 4

2

Notes:
Cost Estimate

Alex
OFO BUDOOR OFO
Surveyed by: Planned By: Approved by: Supervised by:
Notes:
KEY MAP

-Lay 48F cable in


the existing duct
from NAP186/1 to
the building
having TAG ID
ALK(I)186/1-53

-splice 48F cable in


the NAP on the
Ground floor.

-splice 24F cable in


the NAP on the
2ed floor.

OFO BUDOOR Alex OFO


Planned Approved Supervised
Surveyed by:
By: by: by:
Notes:
FDD

OFO BUDOOR Alex OFO


Surveyed Planned Approved Supervised
by: By: by: by:

You might also like