Cost Estimate: Surveyed By: Planned By: Approved By: Supervised by
Cost Estimate: Surveyed By: Planned By: Approved By: Supervised by
ALEX
OFO BUDOOR OFO
Surveyed by: Planned By: Approved by: Supervised by:
KEY MAP
Notes:
RDD
-Splice 3F (367-369)
from BJ/9/9 to the
MDU building
ALK(I)177/25-
32/1-50
-Install 5 wall
mounted NAPs
inside the building
in the mentioned
floors (G,1,3,5,7).