Professional Documents
Culture Documents
"Leaf" Criteria Objective (Adjective) Attribute (Noun)
"Leaf" Criteria Objective (Adjective) Attribute (Noun)
"Leaf" Criteria Objective (Adjective) Attribute (Noun)
Date 23-Sep-19
Performed by
Length
Experience
Breadth
Maximize
Contribution to Specific to gas
team objectives in deltaics
Network
Team-player
Choose best
candidate
within budget Availability
Salary
Minimize
Cost
Benefits
Weights
Cost/Bene
Normalized
Attribute (Noun) Scale Type VF
Weight
Score
Rank
Max
Min
Capex Lineal PL 1 10 c 1 45.39 45%
Opex Lineal PL 1 10 c 2 26.19 26%
Plazo implementación y construcción Lineal PL 1 10 c 3 14.68 15%
Plazo Obtención de Permisos Lineal PL 1 10 c 4 9.31 9%
Constructibilidad Lineal PL 1 10 c 5 4.43 4%
0 Lineal PL 1 10 5 0%
0 Lineal PL 1 10 5 0%
0.00
0.00
0.00
100
Opex
Piecewise PL
Lineal Description Value Function
x V(x) x V(x)
Min 1 1 0.00 1.00 0.00
Max 10 0.00 0.00
Mono Inc 0.00 0.00
Rho 10 0.00 0.00
Mid-V 1 0.00 0.00
GS 0.5 #VALUE! 0.00 0.00
Ints 1 10 1.00 10.00 1.00
Constructibilidad
Piecewise PL
Exponential Description Value Function
x V(x) x V(x)
Min 1 1 0.00 Tends not to interact with team 1.00 0.00
Max 10 Interacts, but concerned more about self than team 0.00 0.00
Mono Inc Sometimes has conflicts between what is best for team and self 0.00 0.00
Rho 1 Concerned only with team success 0.00 0.00
Mid-V 0.5 0.00 0.00
GS 0.5 #VALUE! 0.00 0.00
Ints 7 10 1.00 10.00 1.00
0
Piecewise PL
Exponential Value Function
x V(x) x V(x)
Min 1 1 0.00 1.00 0.00
Max 10 0.00 0.00
Mono Dec 0.00 0.00
Rho 5 0.00 0.00
Mid-V 10 0.00 0.00
GS 0.5 #VALUE! 0.00 0.00
Ints 7 10 1.00 10.00 1.00
0
Piecewise PL
Exponential Description Value Function
x V(x) x V(x)
Min 1 1 0.00 1.00 0.00
Max 10 0.00 0.00
Mono dec 0.00 0.00
Rho 15.2 0.00 0.00
Mid-V 120 0.00 0.00
GS 0.5 #VALUE! 0.00 0.00
Ints 7 10 1.00 10.00 1.00
0
Piecewise 0
Exponential Description Value Function
x V(x) x V(x)
Min 0 0 0.00 0.00 ###
Max 0 0.00 ###
Mono Dec 0.00 ###
Rho 7.6 0.00 ###
Mid-V 35 0.00 ###
GS 0.5 #VALUE! 0.00 ###
Ints 7 0 1.00 0.00 ###
0
Piecewise 0
Exponential Description Value Function
x V(x) x V(x)
Min 0 0 0.00 0.00 ###
Max 0 0.00 ###
Mono Inc 0.00 ###
Rho 1 0.00 ###
Mid-V 0.5 0.00 ###
GS 0.5 #VALUE! 0.00 ###
Ints 7 0 1.00 0.00 ###
0
Piecewise 0
Exponential Description Value Function
x V(x) x V(x)
Min 0 0 0.00 0.00 ###
Max 0 0.00 ###
Mono Inc 0.00 ###
Rho 1 0.00 ###
Mid-V 0.5 0.00 ###
GS 0.5 #VALUE! 0.00 ###
Ints 7 0 1.00 0.00 ###
Decision Hire new Geologist
Date 23-Sep-19
Performed by
Continuar operando Barahona 2 como tranque de cabecera , Manejo de Aguas: Piscina de Almacenamiento fuera de cubeta,Pozos de
1 1
depresión de Napa,Canal de contorno Desvio de quebradas, Estabilidad Hidráulica:Vertedero, Estabilidad Física: Pozos de Bombeo
Nuevo deposito de almacenamiento de relaves como deposito de cabecera, Manejo de Aguas: Piscina de Almacenamiento fuera de
2 cubeta,Pozos de depresión de Napa,Canal de contorno Desvio de quebradas, Estabilidad Hidráulica:Vertedero, Estabilidad Física: 2
Pozos de Bombeo
Continuar operando Barahona 2 como tranque de cabecera , Manejo de Aguas: Conducción hacia torre evacuadora actual,Pozos de
3 3
depresión de Napa,Canal de contorno Desvio de quebradas, Estabilidad Hidráulica:Vertedero, Estabilidad Física: Pozos de Bombeo
Nuevo deposito de almacenamiento de relaves como deposito de cabecera, Manejo de Aguas: Conducción hacia torre evacuadora
4 actual,Pozos de depresión de Napa,Canal de contorno Desvio de quebradas, Estabilidad Hidráulica:Vertedero, Estabilidad Física: 4
Pozos de Bombeo
Continuar operando Barahona 2 como tranque de cabecera , Manejo de Aguas: Piscina de Almacenamiento fuera de cubeta,Pozos de
5 depresión de Napa,Manejo de quebrada mediante desvio independiente, Estabilidad Hidráulica:Vertedero, Estabilidad Física: Pozos de 5
Bombeo
Nuevo deposito de almacenamiento de relaves como deposito de cabecera, Manejo de Aguas: Piscina de Almacenamiento fuera de
6 cubeta,Pozos de depresión de Napa,Manejo de quebrada mediante desvio independiente, Estabilidad Hidráulica:Vertedero, Estabilidad 6
Física: Pozos de Bombeo
Continuar operando Barahona 2 como tranque de cabecera , Manejo de Aguas: Conducción hacia torre evacuadora actual,Pozos de
7 depresión de Napa,Manejo de quebrada mediante desvio independiente, Estabilidad Hidráulica:Vertedero, Estabilidad Física: Pozos de 7
Bombeo
Nuevo deposito de almacenamiento de relaves como deposito de cabecera, Manejo de Aguas: Conducción hacia torre evacuadora
8 actual,Pozos de depresión de Napa,Manejo de quebrada mediante desvio independiente, Estabilidad Hidráulica:Vertedero, Estabilidad 8
Física: Pozos de Bombeo
Continuar operando Barahona 2 como tranque de cabecera , Manejo de Aguas: Piscina de Almacenamiento fuera de cubeta,Pozos de
9 depresión de Napa,Canal de contorno Desvio de quebradas, Estabilidad Hidráulica:Vertedero, Estabilidad Física: Refuerzo Al pie muro 9
Barahona 2
Nuevo deposito de almacenamiento de relaves como deposito de cabecera, Manejo de Aguas: Piscina de Almacenamiento fuera de
10 cubeta,Pozos de depresión de Napa,Canal de contorno Desvio de quebradas, Estabilidad Hidráulica:Vertedero, Estabilidad Física: 10
Refuerzo Al pie muro Barahona 2
Continuar operando Barahona 2 como tranque de cabecera , Manejo de Aguas: Conducción hacia torre evacuadora actual,Pozos de
11 depresión de Napa,Canal de contorno Desvio de quebradas, Estabilidad Hidráulica:Vertedero, Estabilidad Física: Refuerzo Al pie muro 11
Barahona 2
Nuevo deposito de almacenamiento de relaves como deposito de cabecera, Manejo de Aguas: Conducción hacia torre evacuadora
12 actual,Pozos de depresión de Napa,Canal de contorno Desvio de quebradas, Estabilidad Hidráulica:Vertedero, Estabilidad Física: 12
Refuerzo Al pie muro Barahona 2
Continuar operando Barahona 2 como tranque de cabecera , Manejo de Aguas: Piscina de Almacenamiento fuera de cubeta,Pozos de
13 depresión de Napa,Manejo de quebrada mediante desvio independiente, Estabilidad Hidráulica:Vertedero, Estabilidad Física: Refuerzo 13
Al pie muro Barahona 2
Nuevo deposito de almacenamiento de relaves como deposito de cabecera, Manejo de Aguas: Piscina de Almacenamiento fuera de
14 cubeta,Pozos de depresión de Napa,Manejo de quebrada mediante desvio independiente, Estabilidad Hidráulica:Vertedero, Estabilidad 14
Física: Refuerzo Al pie muro Barahona 2
Continuar operando Barahona 2 como tranque de cabecera , Manejo de Aguas: Conducción hacia torre evacuadora actual,Pozos de
15 depresión de Napa,Manejo de quebrada mediante desvio independiente, Estabilidad Hidráulica:Vertedero, Estabilidad Física: Refuerzo 15
Al pie muro Barahona 2
Nuevo deposito de almacenamiento de relaves como deposito de cabecera, Manejo de Aguas: Conducción hacia torre evacuadora
16 actual,Pozos de depresión de Napa,Manejo de quebrada mediante desvio independiente, Estabilidad Hidráulica:Vertedero, Estabilidad 16
Física: Refuerzo Al pie muro Barahona 2
17
18
19
20
21
22
Decision Hire new Geologist
Date 23-Sep-19
Performed by ###
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
Attributes Alternative Scores Alternative Values Weighted Alternative Values
Scale Type
Weight
Score
Rank
Base
Name
10
12
13
14
15
16
10
12
13
14
15
16
10
12
13
14
15
16
11
11
11
1
0
1 Capex PL 1 45 0.45 8.53 5.97 8.71 6.16 9.82 7.27 10.00 7.45 2.55 0.00 2.73 0.18 3.84 1.29 4.03 1.47 ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### #REF! #REF! #REF! #REF! #REF! ###
2 Opex PL 2 26 0.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### #REF! #REF! #REF! #REF! #REF! ###
3 Plazo implementación y constPL 3 15 0.15 10.00 5.00 10.00 5.00 10.00 5.00 10.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### #REF! #REF! #REF! #REF! #REF! ###
4 Plazo Obtención de PermisosPL 4 9.3 0.09 10.00 0.77 0.77 0.77 10.00 0.77 8.46 0.77 0.77 0.00 0.77 0.77 0.77 0.77 0.77 0.77 ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### #REF! #REF! #REF! #REF! #REF! ###
5 Constructibilidad PL 5 4.4 0.04 6.67 3.33 10.00 3.33 10.00 3.33 10.00 3.33 3.33 0.00 3.33 0.00 3.33 0.00 3.33 0.00 ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### #REF! #REF! #REF! #REF! #REF! ###
6
7
8
9
10
Total 100 ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### 0.00 Total ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
Rank ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### Rank ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
16 16
Alternatives
15 15
Alternatives
14 14
Constructibilidad
13 13 Constructibilidad
12 12
11 11
Plazo Obtención de Permisos Plazo Obtención de
10 10 Permisos
9 9 Un-Weighted Attribute Values
8 8
Weighted BENEFITS Values Plazo implementación y construcción Plazo implementación
7 7 y construcción
6 6
5 Opex 5 Opex
4
4
3
3 Capex
Capex 2
2
1
1
0.00 2.00 4.00 6.00 8.00 10.00 12.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00
Decision Hire new Geologist
Date 23-Sep-19
Performed by 30-Dec-99
10
12
13
14
15
16
11
1
0
Summed ACTUAL Costs 35.2 15.1 29.5 15.3 39.8 16.4 38.5 16.5 16.7 10 16.8 11 17.9 12.1 18.1 12.2 ### ### ### ### ### ###
Summed WEIGHTED Benefits 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Weighted benfits
1
0.9
0.8 16 15 14 13
0.7
0.6 12 11 10 9
0.5
0.4 8 7 6 5
0.3
0.2 4 3 2 1
0.1
0
5 10 15 Summed20 25
Actual Costs 30 35 40 45
Decision Hire new Geologist
Date 23-Sep-19
Performed by 30-Dec-99
Alternatives
Original Weight 7
0
Test Weight for Bar Chart Plot 0.5000
6 0
5 0
Sensitivity Analysis Weighted Attribute Scores Constructibilidad
1.00 4
Alternative Score
Plazo Obtención de
Permisos
3
1 Plazo implementación y
construcción
2
0.80 2 Opex
1
Capex
3
0.00 2.00 4.00 6.00 8.00 10.00 12.00
0.60 4
Sensitivity Data Table
5
D11 ### ### ### ### #REF! ### ### ### ### 0
0.40 6
1 0 ### ### ### ### #REF! ### ### ### ### 0.00
2 0.1 ### ### ### ### #REF! ### ### ### ### 0.00
7 0.2 ### ### ### ### #REF! ### ### ### ### 0.00
0.3 ### ### ### ### #REF! ### ### ### ### 0.00
0.20 Current 0.4 ### ### ### ### #REF! ### ### ### ### 0.00
0.5 ### ### ### ### #REF! ### ### ### ### 0.00
Test 0.6 ### ### ### ### #REF! ### ### ### ### 0.00
0.7 ### ### ### ### #REF! ### ### ### ### 0.00
0.00 0.8 ### ### ### ### #REF! ### ### ### ### 0.00
0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 0.9 ### ### ### ### #REF! ### ### ### ### 0.00
Attribute Weight
1 ### ### ### ### #REF! ### ### ### ### 0.00
=TAB
LE(,D
11)
Decision Hire new Geologist
Date 23-Sep-19
Performed by 30-Dec-99
Capex
Sensitivity Analysis
Alternatives
Attribute Number for Sensitivity 1 Total Value = #VALUE!
16
Capex 15
14 Constructibilidad
Original Weight 45.4% 13 Plazo Obtención de
Test Weight for Bar Chart Plot 70.0% 12 Permisos
11
10 Weighted Attribute Scores Plazo implementación y
9 construcción
Sensitivity Analysis 8
1.00 7 Opex
Alternative Score
6
1 5 Capex
2
4
3
3 2
0.80 4 1
5 0.00 2.00 4.00 6.00 8.00 10.00 12.00
6
7
0.60
8
9 Sensitivity Data Table
10 D11 ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### #REF! #REF!
0.40
11 0 ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### #REF! #REF!
12 0.1 ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### #REF! #REF!
13 0.2 ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### #REF! #REF!
14 0.3 ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### #REF! #REF!
0.20 15 0.4 ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### #REF! #REF!
16 0.5 ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### #REF! #REF!
Cu 0.6 ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### #REF! #REF!
rre
nt 0.7 ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### #REF! #REF!
0.00 Tes 0.8 ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### #REF! #REF!
0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 t 0.9 ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### #REF! #REF!
Attribute Weight
1 ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### #REF! #REF!
Manejo de
Estabilidad Aguas
Número Opex Capex
Estabilidad Fisica Capex Hidráulica Superficial
alternativa (año) Vertedero
Vertedero es
Afluentes
Canal de
contorno
1 Pozos de Bombeo 1,800,000 6,096,843 Vertedero 12,500,000
Desvio de
quebradas
Canal de
contorno
2 Pozos de Bombeo 1,800,000 6,096,843 Vertedero 12,500,000
Desvio de
quebradas
Canal de
contorno
3 Pozos de Bombeo 1,800,000 6,096,843 Vertedero 12,500,000
Desvio de
quebradas
Canal de
contorno
4 Pozos de Bombeo 1,800,000 6,096,843 Vertedero 12,500,000
Desvio de
quebradas
Manejo de
quebrada
mediante
5 Pozos de Bombeo 1,800,000 6,096,843 Vertedero 12,500,000
desvio
independient
e
Manejo de
quebrada
mediante
6 Pozos de Bombeo 1,800,000 6,096,843 Vertedero 12,500,000
desvio
independient
e
Manejo de
quebrada
mediante
7 Pozos de Bombeo 1,800,000 6,096,843 Vertedero 12,500,000
desvio
independient
e
Manejo de
quebrada
mediante
8 Pozos de Bombeo 1,800,000 6,096,843 Vertedero 12,500,000
desvio
independient
e
Canal de
Refuerzo Al pie muro contorno
9 28,125,000 Vertedero 12,500,000
Barahona 2 Desvio de
quebradas
Canal de
Refuerzo Al pie muro contorno
10 28,125,000 Vertedero 12,500,000
Barahona 2 Desvio de
quebradas
Canal de
Refuerzo Al pie muro contorno
11 28,125,000 Vertedero 12,500,000
Barahona 2 Desvio de
quebradas
Canal de
Refuerzo Al pie muro contorno
12 28,125,000 Vertedero 12,500,000
Barahona 2 Desvio de
quebradas
Manejo de
quebrada
Refuerzo Al pie muro mediante
13 28,125,000 Vertedero 12,500,000
Barahona 2 desvio
independient
e
Manejo de
quebrada
Refuerzo Al pie muro mediante
14 28,125,000 Vertedero 12,500,000
Barahona 2 desvio
independient
e
Manejo de
quebrada
Refuerzo Al pie muro mediante
15 28,125,000 Vertedero 12,500,000
Barahona 2 desvio
independient
e
Manejo de
quebrada
Refuerzo Al pie muro mediante
16 28,125,000 Vertedero 12,500,000
Barahona 2 desvio
independient
e
Capex
Obras opex
Manejo de Capex Obras
Estabilidad nuevas bombeo
Capex obras Aguas de de Manejo de
Química control estabilidad
Proceso Agua
estabilidad uimica
química
Piscina de
Pozos de
Almacenamie
7,875,000 depresión de 3,375,000 1,524,211 1,660,000
nto fuera de
Napa
cubeta
Piscina de
Pozos de
Almacenamie
7,875,000 depresión de 3,375,000 1,524,211 1,660,000
nto fuera de
Napa
cubeta
Conducción
Pozos de
hacia torre
7,875,000 depresión de 3,375,000 1,524,211 862,500
evacuadora
Napa
actual
Conducción
Pozos de
hacia torre
7,875,000 depresión de 3,375,000 1,524,211 862,500
evacuadora
Napa
actual
Piscina de
Pozos de
Almacenamie
2,187,500 depresión de 3,375,000 1,524,211 1,660,000
nto fuera de
Napa
cubeta
Piscina de
Pozos de
Almacenamie
2,187,500 depresión de 3,375,000 1,524,211 1,660,000
nto fuera de
Napa
cubeta
Conducción
Pozos de
hacia torre
2,187,500 depresión de 3,375,000 1,524,211 862,500
evacuadora
Napa
actual
Conducción
Pozos de
hacia torre
2,187,500 depresión de 3,375,000 1,524,211 862,500
evacuadora
Napa
actual
Piscina de
Pozos de
Almacenamie
7,875,000 depresión de 3,375,000 1,524,211 1,660,000
nto fuera de
Napa
cubeta
Piscina de
Pozos de
Almacenamie
7,875,000 depresión de 3,375,000 1,524,211 1,660,000
nto fuera de
Napa
cubeta
Conducción
Pozos de
hacia torre
7,875,000 depresión de 3,375,000 1,524,211 862,500
evacuadora
Napa
actual
Conducción
Pozos de
hacia torre
7,875,000 depresión de 3,375,000 1,524,211 862,500
evacuadora
Napa
actual
Piscina de
Pozos de
Almacenamie
2,187,500 depresión de 3,375,000 1,524,211 1,660,000
nto fuera de
Napa
cubeta
Piscina de
Pozos de
Almacenamie
2,187,500 depresión de 3,375,000 1,524,211 1,660,000
nto fuera de
Napa
cubeta
Conducción
Pozos de
hacia torre
2,187,500 depresión de 3,375,000 1,524,211 862,500
evacuadora
Napa
actual
Conducción
Pozos de
hacia torre
2,187,500 depresión de 3,375,000 1,524,211 862,500
evacuadora
Napa
actual
Capex Obras Plazo de
Continuidad nuevas de Capex de implement
Opex
Operacional continuidad Obras ación
operacional (meses)
Continuar
operando
Barahona 2 9 0 10
como tranque de
cabecera
Nuevo deposito
de
almacenamiento
de relaves como
11,250,000 6 0 5
deposito de
cabecera
Continuar
operando
Barahona 2 9 0 10
como tranque de
cabecera
Nuevo deposito
de
almacenamiento
de relaves como
11,250,000.00 6 0 5
deposito de
cabecera
Continuar
operando
Barahona 2 10 0 10
como tranque de
cabecera
Nuevo deposito
de
almacenamiento
de relaves como
11,250,000.00 7 0 5
deposito de
cabecera
Continuar
operando
Barahona 2 10 0 10
como tranque de
cabecera
Nuevo deposito
de
almacenamiento
de relaves como
11,250,000.00 7 0 5
deposito de
cabecera
Continuar
operando
Barahona 2 3 10 0
como tranque de
cabecera
Nuevo deposito
de
almacenamiento
de relaves como
11,250,000.00 0 10 0
deposito de
cabecera
Continuar
operando
Barahona 2 3 10 0
como tranque de
cabecera
Nuevo deposito
de
almacenamiento
de relaves como
11,250,000.00 0 10 0
deposito de
cabecera
Continuar
operando
Barahona 2 4 10 0
como tranque de
cabecera
Nuevo deposito
de
almacenamiento
de relaves como
11,250,000.00 1 10 0
deposito de
cabecera
Continuar
operando
Barahona 2 4 10 0
como tranque de
cabecera
Nuevo deposito
de
almacenamiento
de relaves como
11,250,000.00 1 10 0
deposito de
cabecera
Plazo Constructibilid
Obtencion ad
de 5 bajo riesgo CAPEX
permisos 1 alto riesgo
10 7 27,210,000 8.53
1 3 38,460,000 5.97
1 10 26,412,500 8.71
1 3 37,662,500 6.16
10 10 21,522,500 9.82
1 3 32,772,500 7.27
8 10 20,725,000 10.00
1 3 31,975,000 7.45
1 3 53,535,000 2.55
0 0 64,785,000 -
1 3 52,737,500 2.73
1 0 63,987,500 0.18
1 3 47,847,500 3.84
1 0 59,097,500 1.29
1 3 47,050,000 4.03
1 0 58,300,000 1.47
20,725,000
64,785,000
4,406,000
OPEX
7,621,054 -
7,621,054 -
7,621,054 -
7,621,054 -
7,621,054 -
7,621,054 -
7,621,054 -
7,621,054 -
1,524,211 10.00
1,524,211 10.00
1,524,211 10.00
1,524,211 10.00
1,524,211 10.00
1,524,211 10.00
1,524,211 10.00
1,524,211 10.00
1,524,211
7,621,054
609,684
1 2 3 4 5
Capex de Obras 9 6 9 6 10
Opex 0 0 0 0 0
Plazo de implementación
(meses) 10 5 10 5 10
Constructibilidad
5 bajo riesgo 7 3 10 3 10
1 alto riesgo
7 10 7 3 0 3 0 4
0 0 0 10 10 10 10 10
5 10 5 0 0 0 0 0
1 8 1 1 0 1 1 1
3 10 3 3 0 3 0 3
Weight
1 4 1 45%
10 10 10 26%
0 0 0 15%
1 1 1 9%
0 3 0 4%