VENDOR DATA BOOK REQUIREMENT

TRANSTECH FABRICATION
2201 Judith Road McGreagor, Texas 76657

Progression Requirement
Final Data Books
1

Drawing List / Deliverables Register

Manfacturing Schedule and Fabrication


Status Report
3
Weights and Loads
4

Weighing and Lifting Procedures

Shipping and Storage Procedures


6

Outline / General Arrangements

Calculations
8
9 Data Sheets (all applicable)

Fabrication Detail Drawings


10
Nameplate Rubbing
11

Quality Assurance Manual


12

Project Quality Plan

13
Inspection and Test Plan
14
Heat Treatment Procedure
15

Welding Procedure Specification

16

Welder Qualification Record

17
18 NDT Procudures
19 NDT Operator Qualifications
20 Weld and NDT Identification Diagrams
21 RT Inspection Records / Reports
22 MPI Reports
23 UT Inspection Records/ Reports
24 Dye Penetrant Inspection Reports
25 Hardness Report
26 PWHT Furnace Charts
Hydro Test / Pneumatic Charts and Leak-
27 test Results
28 Surface Preparation and Coating Reports
29 Mill Test Certificates
30 Material Location Plan
REQUIREMENT

Description
Manufacturing, Installation, Operation and
Maintenance Data

List every document, drawing, calculation, manual,


etc.. To be submitted to fulllfill the requirements of
this VDRL. Including submission dates, wether for
information or review and the manual reference. To
be updated on a continuious basis.
Complete details of vendors' and subcontractors'
activities. It shall also be suitable for a vendor to
report progress and buyer to assess and monitor
performance

weight and c of g positions for dry and nominal


operating case

detailing location, description of equipment,


calibration, weight measurement method, and c of g
calculation. Procedure to be typed and submitted for
approval before weighing and lifting activity

Provide protection instructions for time between


installation and commissioning and state maximum
validity period , if any.
List all items and show arrangement of components
for each unit. Give overall dimentions. Locate
foundation supports, anchor bolts, and all project
specific termination points including I&E. Show
details of splits and itemsthat have been removed
during shipping

Process simulation, vessesl sizing, ASME code


calculations, equipment sizing calculations,
mechanical and structural design calculations.
Vessel data sheets, mechanical equipment

Show bills of material, vessels, vessel internals,


outline darwings including structural details for
installation.
Detailing equipment name, number, design report/
operating conditions, vendor's name, inspection
authority

Vendors manual detailing general quality policies.


May be substituted by quality system certificate by
an accredited body

Project QA manual and project procedures


identifying selected sections of the quality system
detaling the specific requirements for this purchase
order.
Indicating specific quality control activities,
inspection, testing, witnessing, etc..
Covering the requirements for preheating and post
heat treatment.

Specification (including repairs procedures) in the


format in ASME section ix qw-483 or similar. These
shall be submitted prior to welding operations for
approval.
Qualification records for the nominated welders for
the subject job and to the applicable approved
welding procedure specification

ting Reports