BHARAT SANCHAR NIGAM LIMITED.
‘iil Broadband” ara dan fer fates 4
(AGoremmen ea Ente) Pantin India
srifert-aennins, Gran fen, AUREEA. Mey, BRT as, arje-s180so
URN
Lt No, GMTD-KNL /PLG II/ Requirement of Battery and PP/2016-17 /Vol IU Dd at KNL the 28.02.2019
To
SDE (Gi), Alur/Pattikonda/A lagadda/Banaganapalli/K ilakuntla/Nandikotkur/Atmakur/Adoni/Kodumur.
SDOT Dhone/Yemmiganur/Kumool,SDOP Nandyal,SDE(O&M) Kurnool,
Kurnool $s,
Sub:-Allotment of Battery sets under CFA & CM Vertcle for FY 2018-19 in Kurnool SSA Reg.
With reference to the above subject the Competent authority approved to allot the following battery sets
under CFA & CM Vertcle as mentioned in Annexure-l. Hence respective SDEs/SDOTSSDOPS are requested to
make arrangements to collect the alloted battery from SSA stores Kummool,with in 15 days from the date of
allotmentotherwise diversion may be given to other needy places in kumool SSA,
You are here by requested to transport and commission the new battery sets at allotted locations,
‘compliance/AT test discharge reports may be submitted with in a week from the date of installation. The old and
Ute expired battery sets may be proposed for scrapping and reports may be sent accordingly. "The battery sets
which are not completed lite and giving low battery backup at below location, test discharge may be conducted
{o the sets for identifying the faulty cell. After rearrangement of faulty cells, diversion of old batery ses 0 the
needy places proposals may be sent to this office for getting approval.
Assistane§eneral Manager (Pig)
O/o GMTD,BSNL
Kurool-518050.
Copy to: | The DE(Mtce.) AdoniiNandyal/Kurnool/Dhone, For information please,
2SDE(MM)JTO(MM) Kurnool for delivering the above stores please,the $.Nos of the delivered
‘equipment may be recorded and submitted.Annexure-1
Allotment of Battery sets under CFA Verticle for FY 2018-19
[S\No_[Name of the Exchange [Battery Capacity | _No of Sets allotted [Remarks
“lYallur 00H 2 [SDE(Gr) Allagadda
Hal 200AH Hl [SDE(Gr),Adoni
3Kolimigundia ‘200AH. 4 [SDE(Gr),Kolakuntla
4lPkotakonda 200AH 4 [SDOT Dhone
5] Rudravaram ‘300AH 2 ISDE(Gr Allagadda
6|Halaharvi 300AH 2 [SDE(Gr) Adoni
7|Joharapuram '3O0AH. 4 [SDE(Gr) Alur
alAspari ‘300AH. 1 ISDE(Gq),Alur
9}Polakal '300AH 2 DE(Gr),Kodumur
“10|Kadumur 300AH | 4 [SDE(Gn, Nandkotkur
“1]Parumanchala ‘300AH 1 [SDE(Gn),Nandikotkur
7a|Maddikera '300AH 2 |SDE(Gr),Pattikonda
13[Devanakonda 300AH 4 DE(Gr) Pattikonda
14{Thugaall '300AH 4 ikonda
115|Lakshmiouram 300AH 1 [SOOT Kurnool
16|Namoor 300AH. 1 [SDOT Kumoo!
17[Nagaladinne ~300AH 2 ISDOT Yermiganur
“18|Bapuram 300AH 1 DE(Gn), Adoni
19) Pulakurth 300AH 2 [SDE(Gr).Kodumur
[Yerraguntla 400AH. 1 [SDE(Gn) Allagadda
211 Owk, 400AH 2 [SDE(Gr),Banganapall
22|Peddahottur 400AH 41 [SDE(Gr) Alur
23|Racherla [4004 2 [SDOT Dhone:
24|Velgode OOAH. 2 [SDE(Gn Atmakur
25|Banaganapall —S00AH 2 [SDE(Gr).Banganapall
25)H GOOAH, 1 [SDE(Gr) Adoni
si oat GOOAH, 1 ngiKoTKu
smbalapadu | a008H 1 [SDOT Dhone
29[Belum “A00AH 1 [SDE(Gr) Kolakuntla
‘Allotment of Battery sets under CM Verticle for FY 2018-19
“]Meerapuram USO BTS 400AH 1 ~ [SDE(GA,Banganapall
2|Netravathi USO BTS -400AH 4 [SDE(Gr),Alur
3]Alur USO BT: “A00AH 1 [SDE(GN Kolakuntia
a] eubetetrennn U5O: 400AH 1 ISDOT Ohone
lOwk Ramapuram BTS “400AH i [SDE(Gr,Banganapali
6|APCPDCL BT: 400AH 4 |SDE(O&M),Kumool
7|Devanagar KNL BTS ‘A00AH. 4 [SDE(O&M) Kumool
I Town KNL BTS. 400AH 4 [SDE(O&M),Kumool
9[Nandavaram YGR BTS “40H 4 [SOOT Yemmiganur
T0]NRangapuram BTS “A00AH 4 [SOOT Dhone
| eget ae Terme 400AH 1 |SDOT Dhone
72|Satanur BT: H i DE(Gn,Adoni
1a/Yellarthy BTS “A00AH. 2 [SDE(Gr) Adoni
44]Kuppagal BTS ~400AH 2 ISDE(Gn Adoni
15|Allagadda NB. -400AH 4 [SDE(Gr) Allagadda
16|Chagalamarni NB. “400AH 4 adda
17|Nallagatia BTS ‘400AH. 1 [SDE(Gr) Allagadda’
“elAyyalurimetta BTS -A00AH 1 [SDOP,Nandyal
119 Uppalapadu USO BTS. “400AH 1 [SDE(Gr),Banganapall
20[Gudekal BTS “400AH 1 DOT Yemmiganur
ag) sare ae
Dio. General Manager, Telecom Li
Saco - KURNOOL - 518 US