QF-DGN-01

TITLE: DOCUMENT/DRAWING APPROVAL/COMMENT TRANSMITAL

Project : Supply, Installation, Testing & Commissioning of Bakerganj-Barguna 132kV


Transmission Line on Turnkey Basis.
Contract Number : PGCB/132kV/BKG-BGN/TL, Date: 21.01.2018
Document Submittal Ref : HGPT/PGCB/132kV/BBTL/2019/198; Date: 23.04.2019

Subject : COMMENTS ON FOUNDATION DESIGN DRAWING OF TOWER TYPE


"1DT6 (T) +9M” AND PILE SCHEDULE 14.

Copy to
To
Managing Director, PGCB
Project Director
Bakerganj-Barguna Transmission Line Project √ Executive Director (P & D), PGCB
Power Grid Company of Bangladesh Limited (PGCB)
H-6 (Level-3), R-23/A, Gulshan-1 √ Chief Engineer (P & D/Project), PGCB
Dhaka-1212.
√ HG POWER Transmission SDN. BHD.
Kind Attn :

Dear Sir √ Executive Engr. (Civil Design), PGCB


We are pleased to enclose the following documents for the purpose
√ Master File
indicated below:

In case of any modification other than those desired are carried out, the Issued by:
same shall be highlighted clearly in the Drawing/Document with full
justification thereof and resubmitted for approval.
(Engr. Md. Delowar Hossain)
Approval/Comments/Information conveyed herein neither relieves the Superintending Engineer
contractor of his contractual obligation and his responsibilities for Civil Design, P&D.
correctness of dimensions, material of constructions, weight, quantities, Our Ref: 27.21.0000.412.49.001.19.287
design details, assemble fits, performance particulars and conformity of
the supplies with the Statutory Laws of Bangladesh as may be applicable, Date: 29/04/2019
nor does it limit the Employer’s right under the contract.

Item Description of Document Drawing Number Revision Status Enclosed


No Drawing/ Documents Number

Approved (A)
Yes
Approved with
Comment /
Please refer to Annexure -1 Correction (C)

Request for re- No


Submission (RR)

For information
(FI)

Please acknowledge receipt of documents:


Received by Date
Ref No. 27.21.0000.412.49.001.19.287 Date: 29/04/2019

Annexure-1

Tower Foundation Design Drawing:

Sl No. Description Drawing Number Comments

01. Tower Type: 1DT6(T)+9M PGCB/BB/TL/1DT6T/02 Not Approved


Details Drawing of Piling & Pilecap Sheet:1/1, Rev:00
Foundation for Soil Category-2
02. Tower Type: 1DT6(T)+9M PGCB/BB/TL/1DT6T/03 Approved with
Details Drawing of Piling & Pilecap Sheet:1/1, Rev:00 Corrections
Foundation for Soil Category-3

Pile Schedule 14:

Item Description of Drawing/ Tower No. Number Revision Comments


No Documents of Tower

01. Pile Schedule-14 TT-1A & TT-2 02 0 Approved with


Correction