SUMMARY OF STEEL

GRID ELEVATION BILL OF MATERIALS ASSEMBLY MK'D : B1 ASSY QTY : 33


EL+ 5.911 SR.NO MEMBER SIZE MAT. SPEC. WEIGHT Qty.per
8-9/9-A LENGTH Part Profile Size Length Wt. per Assy Total Total Wt. Matl. Spcn. Remarks
Mark Assembly Qty. in Kgs
8-9/9-A EL+ 5.920 1 ISMB150 450MPa 1240.1 18.6
M8 1 ISMB150 1240 18.59 33 613.58 450MPa
1-2/9-A EL+ 5.920 2 PLT 10 250MPa 215.3 2.6
PLT108 1 PL10*156 215 2.63 33 86.73 250MPa
7-8/9-A EL+ 5.934 TOTAL WEIGHT IN KGS. 21.22
Wt. Per Assy: 21.22 kg's Tot. Wt : 700.31 kg's
2-3/9-A EL+ 5.934
2-3/9-A EL+ 5.943 BOLT LIST FOR ASSEMBLY MKD. B1 33 No.Reqd

7-8/9-A EL+ 5.943 DIAMETER GRADE TYPE LENGTH No. CONNECTED MEMBER

2-3/9-A EL+ 5.952 16 HSFG 8.8 Site 40 2 B14

7-8/9-A EL+ 5.952


2-3/9-A EL+ 5.960
7-8/9-A EL+ 5.961
2-3/9-A
7-8/9-A
EL+ 5.969
EL+ 5.970 M8
3-4/9-A EL+ 5.978
6-7/9-A EL+ 5.979
3-4/9-A EL+ 5.987

4
6-7/9-A EL+ 5.987
3-4/9-A
6-7/9-A
EL+ 5.996
EL+ 5.996 PLT108
3-4/9-A EL+ 6.005 1240
6-7/9-A EL+ 6.005
3-4/9-A EL+ 6.014
6-7/9-A EL+ 6.014
4-5/9-A EL+ 6.019 ISMB150 x 1240
4-5/9-A EL+ 6.019
4-5/9-A EL+ 6.019
4-5/9-A EL+ 6.019 30 60 1150
4-5/9-A EL+ 6.019
5-6/9-A EL+ 6.019
5-6/9-A EL+ 6.019
5-6/9-A EL+ 6.019 M8
5-6/9-A EL+ 6.019
5-6/9-A EL+ 6.019
76

208
2 - 18 ø HOLES

43
PLT108
FOR INFORMATION
1075 41 124 APPROVED

APPROVED WITH COMMENTS

NOT APPROVED (RE-SUBMIT)

REVIEWED

2 - 18 ø HOLES REVIEWED WITH COMMENTS

1240 PLT108 69 RETURN DATE


NOT BE RETURNED

54

65
30 60 1150 PROJECT ORGINATOR

RECEIVED DATE

M8
156
PRIME STEEL ENGG

44

91
76

57
A ISSUED FOR APPROVAL NS NS 01.10.2019
119 41 56 APP. DATE
REV DESCRIPTION DWN CHKD
BY dd/mm/yy
2 - 18 ø HOLES
215 CLIENT
J.KUMAR INFRA PROJECTS PVT LTD
Andheri West, Mumbai, Maharashtra 400053
E-mail: info@jkumar.com, jknc@vsnl.net
WEB: www.jkumar.com

FABRICATOR :- SG HEAVY ENGINEERING PVT. LTD


Admin office: 513, Marathon Max, Mulund Link Road,
Mulund (W), Mumbai-400 080
Tel: 022 67564849 / 50. Mail: design@vggroup.org

PROJECT NAME :
IMPROVEMENT OF CHHEDANAGAR JUNCTION GHATKOPAR (E)
ON EASTERN EXPRESS HIGHWAY. STEEL GIRDER FOR SPAN SP13 TO SP14

DRAWING TITLE: FABRICATION DETAIL DRAWING FOR


BEAM MARK NUMBER B1 SG-CDN1-FAB- B1

BEAM - B1 NOT TO SCALE


DRAWING TYPE
FABRICATION DETAIL DRAWING STD

COR ESP. PENA


PROJ.No. DRAWING NUMBER
1 0,1 7
2
3
0,2
0,3
7
7
CONTRACTOR DRG. NO. JKR DRG. NO. Rev. N0.
Tekla structures

4 0,4 7
5 0,5 7
6
7
9
0,6
0,1
0,1
7
7
9
INFORMATION IN THIS DOCUMENTS IS PROPERTY OF PRIME STEEL, BEING
PROHIBITED OUTSIDE OF THEIR PURPOSE FORM OWNED TO PRIME STEEL 33 BEAM REQUIRED AS DRAWN MARKED- B1() SHEET 01 OF 01 - A
A3
430 mm x 307 mm
B1 QTY= 33 ISMB150