Professional Documents
Culture Documents
News Papers Abstract
News Papers Abstract
Áfr]
dk;Zikyd vfHk;ark
Xokfy;j dsUnzh; e.My]
dsUnzh; yksd fuekZ.k foHkkx]
35 flVh lsUVj Xokfy;j A
fo"k;% Construction of Infrastructure /Development at newly upgraded STS BSF Academy Tekanpur . SH- C/o FO’s
/R&D Block SO’s Mess with 10 suites SO’s Mess with 15 suites and MP Hall including internal
water supply sanitary installation drainage providing internal electrical installations Conducting for
LAN telephone cable TV & its wiring power wiring main board and DP’s lightening conductor etc.
Agmt. NO :- 15/EE/GCD/2013-2014
Agency :- eSllZ nsosUnz ds “kekZ ,.M ,lksfl,Vl ubZ fnYyh
estimated cost :- Rs
tendered cost :- Rs
date of start :- 10-9-2013
date of Completion:-
a- stipulated :- 9-12-2014
b- actual :- 24-4-2017
lUnHkZ %& Bsdsnkj dk i=kad fuy fnukad
egksn;
mijksDr dk;Z dks djkj vuqlkj fnukad 10-9-2013 ls vkjEHk
gksdj 9-12-2014 dks iw.kZ fd;k tkuk Fkk tofd dk;Z dks okLrfod :Ik ls 24-
4-2017 dks iw.kZ fd;k x;k A ftlesa dqy 867 fnuksa dh dk;Z esa vMpu jgh
A dk;Z dk izFke ekbY”k LVksu Jheku v/kh{k.k vfHk;ark bUnkSj ds i=
la[;k 23¼233)@b ds i@2015@2322 fnukad 15-9-2015 ds }kjk fnukad 2-
9-2014 rd Lohd`r fd;k x;k ftlesa dk;Z ds vkjEHk o lekfIr dh frFkh 15-9-
2015 rd oBkbZ xbZ gS A ftlesa dk;Z esa 275 fnukas dh vMpu vkbZ Fkh
A i= dh izfr layXu gS A vr% mDr dk;Z dk vfUre le;ko`f} izdj.k oukdj
Bsdsnkj }kjk izLrqr fd;k gS ftl ij bl dk;kZy; dh fVIi.kh fuEukuqlkj gS A
Bsdsnkj }kjk izFke Milestone shifting case tks fd fnukad 02-09-2014 rd
consider fd;k x;k gS ftlesa 275 fnuksa dh vMpu vkbZ Fkh ,ao~ vkxs dk;Z
dks djus esa vkbZ vMpuksa ij bl dk;kZy; dh fVIi.kh fuEuor gS A
1- work held up due to colour scheme of R&D block are not reveived from Senior Arch. Bhopal
:-colour scheme hended over to the Agency on 17-4-2015 vr% 10-2-15 to 17-4-2015 67 days
dks tkss fd vyx&vyx dk;Z LFky gksus ds dkj.k vkj ,.M Hkou esa ;g
vMpu gqbZ vr% bl vof/k dk 10 izfr”kr ls 6 fnukas dh vmpu
Lohdk;Z dh tk ldrh gS A 6 fnu
5- Work could not be started as pattern /Drgs.& bar counter in 15 suites is not decided by the client
department :- due to which counters, flooring , finishing etc. wrons in Dining area are also held
up 25.5.15 to 20.6.2015 = 27 days i.e. @20% = 6.00 days 6 days
6- Finial finishing work held up due to not fixing of electrical fixture like tube light fittings fans etc in
10 & 15 suites from20-6-15 to 15-9-15 total 93 days bl okor~ Bsdsnkj ds i= dzekad
2015-16@13 fnukad 24-6-2015 bl ij fo|qr foax dks fo|qr ds tYn dk;Z
djus ds fy;s vkxzg fd;k x;k A bl en eas bl dk;Z gsrq 88 fnukas dk 40
izfr”kr ls 35 fnukas dh vMpu dks Lohdk;Z fd;k tk ldrk gS A 35
fnu
7- Glazing work in frount area of R&D block held up due to drgs not received from Senior Arch.
Bhopal from 20-6-15 to 30-7-15 total 41 days bl en esa bl Oyksd ds fy;s 20 izfr”kr ls
vMpu Lohdk;Z djus dh flQkfj”k dh tkrh gS vr% 8 fnu dh vMpu dks
Lohdk;Z fd;k tk ldrk gS A 8 fnu
8- External development work like road work etc held up due Electrical cable net work comes
behind library building & front of porch area . from 30-7-15 to 15-8-2015 for 17 days i.e. @ 15%
total hinderence for 3 days for this EOT case. 03 days
9- Work held up due to door & window details in M.P. hall ,yoga & Gymnastic are not received for
SA form 1-9-15 to 6-10-15 =36 days bl vMpu ds fy;s 25 izfr”kr ls 09 fnukasa
15- mDr dk;Z ds v/khu pkj dk;ksZ dks fd;k tkuk Fkk ftuesa
fofHkUu vMpusa mRiUu gqbZ ftldk O;kSjk vyx&vyx dk;kZs dk
oukdj i= ds lkFk lyaXu fd;k tk jgk gS A
16- pukRed uD’ks esa Discrepency gksus ds dkj.k lajpukRed uD’ksa
esa okLrqd uD’ks ds vuqlkj u gksus ij Discrepency gksus ij Layout
Marking, Excavation etc. dk dk;Z vkjEHk u gks ldk A dk;Zikyd vfHk;ark }
kjk bl Discrepency dks i= dzekad 23(627)AE(P)/GCD/15/2453h dated 12-9-2013
ds }kjk Discrepency nwj dh xbZ A vr% fnukad 1-9-2013 ls 12-9-2013
rd 12 fnu ftlesa vMpu dzekad 1 esa 60 izfr’kr cover fd;k x;k ,ao~
40izfr’kr ds fglko ls 5 fnu dh vMpu dks vMpu gsrq Lohdk;Z fd;k tk
ldrk gS A = 5 days
17- Fund /Sufficient fund u gksus ds dkj.k vMpu %& lhek lqj{kk cy }
kjk Fund / sufficient fund tkjh u gksus ds dkj.k dk;Z esa vMpu jgh a
Hkqxrku fuEu vuqlkj gq, A bl okor~ Bsdsnkj }kjk i= dzekad
289@dslhlh@fnukad 18-6-2014]9-03-2015]25-03-2015 ds
i=kpkj fd;s x;s A
A. izFke py ys[kk foy fnukad 3-10-13 dks Net Hkqxrku 120 yk[k
gksuk pkfg, Fkk ijUrq sufficient fund u gksus ds dkj.k 75 yk[k dk CV
No 03 dated 5-10-2013 ds }kjk Hkqxrku fd;k x;k A
B. uoEoj fnlEoj tuojh 2014] Qjojh 2014 ekpZ 2014 vizSy 2014 eas
ch ,l ,Q ls Q.M ugha feyk ftlds dkj.k dk;Z okf/kr jgk A
C. f}rh; py ys[kk foy dks 12-5-14 dks Q.M vkus ds okn fd;k x;k A
D. r`rh; py ys[kk foy dks 26-4-2014 dks ftldk Amount 266-80 yk[k
Fkk e.My dk;kZy; esa izLrqr gksus ij bldk Hkqxrku flQZ 50 yk[k
gh fnukad 27-6-2014 dks C.V. No 79 ds }kjk fd;k x;k okdh dk
Hkqxrku fnukad 04-8-2014 dks C.V. No 19 ds }kjk fd;k x;k A
September 2014 esa iwjk Q.M consumed gks x;k A
E. vkBokW py ys[kk foy 132 yk[k dk fnukad 27-1-2015 dks e.My
dk;kZy; esa izLrqr fd;k x;k ftlesa Sufficient fund u gksus ds dkj.k
flQZ 50 yk[k dk gh Hkqxrku fnukad 29-01-2015 dks fd;k x;k A
F. 28 Qjojh 2015 (x.kuk fnukad rd ) rd Q.M ugha vk;k A
i) vr% fnukad 30-10-2013 ls 19-3-2014 (140 fnu dh vMpu )dh
vMpu iSjk dzekad 1 esa overlapping gks jgh gS vr% bl vof/k
esa 30 izfr’kr ds fglkc ls 42 fnuksa dh vMpu Lohdk;Z dh tk
ldrh gS A = 42 days
esa Q.M u gksus ds dkj.k vf/kd okf/kr jgk ,ao~ Bsdsnkj }kjk dqN
le; ds fy;s dke Hkh oan dj fn;k x;k vr% 21-3-2014 ls 20-6-2014
rd dk;Z oan jgk Fund /Sufficient fund u gksus ds dkj.k Bsdsnkj dks
Hkqxrku dh vfu’fprrk gksus ij le; ij Hkqxrku u gksus ds dkj.k
dk;Z dh izxfr esa vlj iMk o dk;Z /kheh xfr ls pyrk jgk ,ao~
le;^le; ij dk;Z complete cUn jgk A
a) vr% fnukad 21-3--14 ls 20-6--14 rd 90 fnu dk 100 izfr’kr dqy
90 fnu dh vMpu dks Lohdk;Z fd;k tk ldrk gS A
= 90 days
b) fnukad 24-6-2014 ls 30-06-2014 rd dk;Z can jgk A 7 fnu 100
izfr’kr = 7 days
c) 1-7-2014 to 24-7-2014 rd 24 fnu dk 40 izfr’kr =10 days
water logged at site :- rRdkyhu lgk;d vfHk;ark }kjk vMpu jftLVj esa bl en
ds fy;s le; ] le; ij vMpu ntZ dh gS iwoZ esa dk;Z LFky nwljs dsEil
esa Fkk ch ,l ,Q }kjk dk;Z LFky dks STS wing low laying area esa dk;Z LFky
dk p;u fd;k x;k tgkW ij Block cottan soil gksus ij ,ao~ fofHkUu Toiletes
blocks /Dhobighat dk Drainage Hkh dk;ZLFky ij gksus ij ,ao~ layXu okm.M~h
oky ds okgj izkbosV edku dk Drainage/ waste water etc. dk Hkh Drainage bl Low
laying area gksus ls water logging gks tkrh gS ,ao~ Block cottan soil gksus ij
7- Hindrance due to Approch road closed by BSF Authority and materials con not
reached at site , other approach road was water logged so that material could not be
dumbed at site and non availability of fund work hindred stoped dated 25-7-2014 to
28-2-2015 :- mijksDr vMpu ds dkj.k dk;Z okf/kr ,ao~ can jgk A
fnukad 25-7-14 ls 22-7-14 rd mijksDr vMpu dks iSjk dzekad 3
esa lekfgr fd;k x;k gS A fnukad 23-9-14 ls 21-10-2014 = 28 fnu
dk 40 izfr’kr
&11 fnu
,ao~ 22-10-2014 ls 27-10-2014 rd & 6 fnu dk 100 izfr’kr &
= 6 fnu
28.10.2014 ls 6-11-2014 rd & 10 fnu dk 50 izfr’kr &
= 5 fnu
7.11.2014 ls 23-11-2014 rd & 17 fnu dk 100 izfr’kr ls &
=17 fnu
24.11.2014 ls 28-2-2015 rd 96 fnu dh 25 izfr’kr ls = 24 fnu dh
vMpu dqy VksVy vMpu & 63
fnu dh vMpu dks Lohdk;Z fd;k tk ldrk gS A
=63 days
8- work hindred due to non availibility of details of suite toilets ,cup board details ,
details of kitcken hand wash, bar pattern in lounge etc. :- mijksDr fMVsY’k le;
and floor tiles, balcony, mess portion etc. fnukad 31-1-2015 ls 28-2-15 (x.kuk
Hkkjr ljdkj
dsUnzh; yksd fuekZ.k foHkkx
Ø0 1¼ 1½@,- bZ@Vh-lh-,l-Mh-@17@
fnukad -- @07@2017
dk;kZy; vkns”k
ua- 03255283 vkj{kd Jh “kSys’k dqekj jk; ] vdkneh ,e Vh] lhek
lqj{kk oy vkdneh ] Vsduiqj tks fd Jheku~ jln vf/kdkjh ds i= la[;k
3577@izksfo-@vkokl@2017@1036&37 fnukad 10-03&17 tks fd izlk”kfud
vf/kdkjh dh flQkfj”k ds vk]/kkj ij vkokl la[;k 03@Vkbi&1 fuEufyf[kr “krkZs ij
vkoafVr fd;k tkrk gS A
dze vkoafVr O;fDr dk vkoaVu djus dh vkokl fVIi.kh
kad uke o in frFkh dzzekad
1- Jsth-Uak 03255283 ftl fnu DokVj dk vkokl la[;k vkj{kd Jh vkj oh vkj jsMMh }
vkj{kd Jh “kSys’k dCtk ysxsa A 03 Vkbi&1 kjk fjDr fd;k x;k vkokl
dqekj jk;
1- mDr vkokl mudks vLFkkbZ rkSj ij vkoafVr fd;k tkrk gS A Hkfo’; esa
dsUnzh; yksd fuekZ.k foHkkx dks vkokl vko”;drk dh fLFkfr esa ,d ekg ds
ukSfVl ij jn~n dj fn;k tk;sxk A o vkoaVh dks fu/kkZfjr le; lhek esas vkokl
[kkyh djuk gksxk A
3- fuokl LFkku dh leLr Fixtures & Fittings dh lqj{kk o blds j[kj[kko ds fy;s
vkoaVh ftEesnkj gksxk A vU;Fkk mDr lkeku dh oktkj nj ls osru ls dVkSrh
dh tk;sxh A
5- dfFkr vkokl x`g esa fo|qr dk Hkqxrku vkoaVu drkZ dks Loa;~ ogu djuk
gksxk A ,ao~ vkokl NksMrs le; ch ,l ,Q ls fo|qr odk;k ls lEcfU/kr ,u vks lh
ykuk vko’;d gksxk A
6- vkoklx`g fdlh vU; O;fDr dks u rks fdjk;s ls vkSj u gh lk>snkjh esa fn;k tk
ldsxk A bl fLFkfr esa to fd ;g fl} gks tk;sxk fd mlus vkokl x`g
fdjk,@lk>snkjh esa fdlh vU; O;fDr dks fn;k gS A rks mlds uke ij vkoaVu
fujLr dj fn;k tk;sxk rFkk vkoaVudrkZ ls ,l vkj 45 ch ds rgr tqekZuk fdjk;k
oktkj nj ds vUrZxr tks Hkh ml vof/k ds fy, vf/kdre gksxk olwy fd;k tk,xk
A
7 vkoaVh }kjk tks “kiFk i= fn;k x;k gS og bl vkns”kksa ds fy, ,d vge fgLlk
gksxk A ftlesa deZpkjh }kjk vkokl dks [kkyh djkus ds fy;s fn;k x;k gS A
Lkgk;d vfHk;ark
Vsduiqj dsUnzh;
mie.My
dsyksfufo ] Vsduiqj
izfrfyfi%& lwpukFkZ o vko’;d dk;Zokgh gsrq izsf"kr A
1-Jheku~ dk;Zikyd vfHk;ark ] Xokfy;j dsUnzh; e.My dsyksfufo Xokfy;j dks
vkids }kjk uksV”khV ij nh xbZ vuqefr ds lUnHkZ esa lwpukFkZ izsf’kr A
deZpkjh }kjk mDr vkokl dk jsaV o ykbZlsa”k Qhl tks fd vxLr 17 ls 31
tuojh 2017 rd ns; gS dk fMek.M Mk~QV jkf”k :I;s 16194@layXu gS A
2-milekns"Vk ]jln] lhek lqj{kk cy vdkneh Vsduiqj dks lwpukFkZ A
3-lgk;d vfHk;ark fo|qr VhlhbZ,lMh dsyksfufo Vsduiqj A
4-iz/kku fyfid ] th lh Mh Xokfy;j dks lwpukFkZ A
5-la[;k 03255283 vkj{kd Jh “kSys’k dqekj jk; lhek lqj{kk cy vdkneh
Vsduiqj d`I;k og dfu’B vfHk;ark ls
lEidZ dj vkokl vius vf/kxzg.k djus gsrq vko”;d dk;Zokgh djsa A
6-Jh ih ds frokjh dfu- vfHk;ark dsyksfufo Vsduiqj A
lgk;d vfHk;ark
Hkkjr ljdkj
dsUnzh; yksd fuekZ.k foHkkx
Ø0 54¼1½@lv-@Vs-ds-mi-e-@17@ fnukad %&
@07@2017
Áfr]
dk;Zikyd vfHk;ark
Xokfy;j dsUnzh; e.My]
dsUnzh; yksd fuekZ.k foHkkx]Xokfy;j A
Following details /authenticated, copy of documents are to be sent to higher office by 30-7-17 .
lUnHkZ %&vkids dk;kZy; dk i=kad 5(1)Conf./GCD/2017/34 dated 11-7-2017
egksn;]
mijksDr fo’k; esa ys[k gS fd lanfHkZr i= esa ekWxh tkudkjh
iSjkokbZt fuEuor gS A
iSjk dzekad 1%& bl iSjk esa bl dk;kZy; ds rhu dk;kZs dh tkudkjh pkgh
gS A tks fd fn;s x;s izksQkekZ esa gS A
SL Agmt. No Status of Status of final Status of EOT Copy of Copy of Copy of site order
work if bill if work sanctioned sanctioned nook hinderance
completed completed EOT along with statement of register and
then actural other wise the processing 10C/10CA cement register,
date of status of last bill note of material at site
completion paid division and register
circle office
1. 14/EE/GCD/13-14 Final bill paid Sanctioned To be attended Yes Enclosed
at Division
office Gwalior
2. 27/EE/GCD/13-14 31.12.16 Final bill is EOT sent to SE Yes Enclosed
under process
3. 03/EE/GCD/15-16 24.4.2017 final bill not EOT not Yes Enclosed
submitted by submitted by
Agency the Agency
Copy of EOT sanctioned vof/k 18-4-15 ls 6-5-15 ,ao~ 25-2-16 ls 31-3-16 A e.My
dk;kZy; }kjk dk;Zokgh dh tkuh gSA
iSjk dzekad 2%& bl iSjk ij ekWxh xbZ tkudkjh bl dk;kZy; ls lEcfU/kr ugha gS A
iSjk dzekad 3%&Detail in respect of chowkidar of engagement in the work of (i) KV boundary wall in
Tekanpur and (ii) C/o BSF Tekanpur executed under NIT NO 29/EE/GCD/15-16 is required in the following format is
required .:- bl dk;kZy; ls lEcf?kr dksbZ dk;Z ugha gS A vr% bl dk;kZy; }kjk
nh tkus okyh tkudkjh “kwU; gS A
iSjk dzekad 4%& Details in the following format is required for the works executed by shri S.C. Gupta &
Shri D.K. Sharma during the period from 05-11-2014 to till date in BSF campus ,Tekanpur and ITBM Karera.
SL Name of work Name of Agency Agreement No Qty. of moorum What is the Whether in principle
executed under source of approval of competent
the agreement as moorum authority was obtained
an extra item used in the for executing this extra
(copy of extra item work and item, if yes than
statement along the provide the copy of the
with copy of distance of same .
analysis of rates source of
may also be Moorum to
enclosed) the site
1 Infrastructure M/s Suresh 46/EE/GCD/13-14
augemnation of training Chand Gupta
facality at STS BSF
Academy Tekanur
SH:- C/o 1 No Trainee
officer mess with 30 suites
and mess accommodation
2 SH:- Senior officer mess M/s Devend K 36/EE/GCD/13-14 Nil NA NA
with 30 suites Sharma &
Associates
3 SH: STS wing Block M/s Devend K 03/EE/GCD/15-16
Sharma &
Associates
4 SH:- C/o FO’s/R&D Block M/s Devend K 15/EE/GCD/13-14
,SO’s 10 suites, SO’s mess Sharma &
with 15 suites and M.P. Associates
Hall
5- Details of works awarded on work order by EE,GCD to shri Alock Bansal, shri Anand Kumar, Shri Banti
Chourasia , M/s Krishna Constructions and Shri SC Gupta from 05-11-14 to till date and details of work order issued
by AE shri S.K.Agrawal in financial year 2014-2015 and 2015-2016 in following format along with copy of work
order and copy of last bill is required.
Sl Name of Name of Estimated Amount of Work Recorded Status of Status of Whether the
N work agency cost work order order No reason of work final bill if quotation
awrding whether work /tender were
work on complete completed called online or
work d or not offline
order
1 Nil
2 Nil
bl dk;kZy; ls lEcf?kr dksbZ dk;Z ugha gS A vr% bl dk;kZy; }kjk nh tkus
okyh tkudkjh “kwU; gS A
6- Following documents/details in respect of work executed under agreement No- 27 /EE/GCD/13-14 is required :-
a) copy of Agreement :- e.My dk;kZy; ls nh tkuh gS A
b) copy of cement register , site order book and hindrances register %& dk;Z lacf/kr jftLVjkas dh
Nk;kizfr;kW layXu gS A
c) bl iSjk dh tkudkjh bl dk;kZy; ls lEcfU/kr ugha gS A
d) copy of 1st,2nd,&4th RA bill along with copy of measurements book, enclosures and copy of processing
notes of division office in respect of agreement No 27/EE/GCD/2013-2014 :- bl dk;Z dk fjdkMZ
e.My dk;kZy; ls fn;k tkuk gS A
e) bl dk;kZy; ls lEcfU/kr ugha gS A
7]o 8 %& bu iSjkvksa ij ekWxs x;s dk;ksZ dk fooj.k bl dk;kZy; ls lEcfU/kr ugha gS A
9- copy of extra item/substitute item statement along with the copy of analysis of rate submitted by the AE to EE
and copy of sanctioned statement along with the analysis of rate carried out in division office for the works
executed under the agreement No -03/EE/GCD/2015-16 , 27/EE/GCD/2013-14 & 15/EE/GCD/2013-14 is required .
bl ij e.My dk;kZy; ls dk;Zokgh dh tkuh gS A
10- Following documents/report are required :-
i) copy of completion certificate recorded by the competent authority for the work executed under Agmt.
No -14/EE/GCD/2013-14 :- e.My dk;kZy; ls dk;Zokgh dh tkuh gS A
ii) bl iSjk ij e.My dk;kZy; }kjk vko”;d dk;Zokgh dh tkuh gS A
iii) bl iSjk dh tkudkjh Xokfy;j dssUnzh; mie.My dzekad ,d ls nh tkuh gS A
iv) djkj la[;k 08@bZbZ@thlhMh@2015&16 bl dk;kZy; ls lEcfU/kr ugha gS aA
v) djkj la[;k12@bZbZ@thlhMh@2012&13 ds dk;Z ls lEcfU/kr fjdkMZ bl dk;kZy; ls
lEcfU/kr ugha gS A
vi) copy of 15th RA bill along with all enclosures including Extra item /Sustituted item for Agreement No
-27/EE/GCD/2013-14 %& ;g tkudkjh e.My dk;kZy; ls lEcfU/kr gS vr% e.My dk;kZy; ls
dk;Zokgh dh tkuh gS A
vii) djkj la[;k 05@bZbZ@thlhMh 2014&15 ds ekWxs x;s fjdkMZ bl dk;kZy; ls
lEcfU/kr ugha gS A
viii) The details of work executed whthin the campus of BSF, Tekapur and ITBP Karera in which recovery @ 1%
for the water charges not made. Reasons along with supported document for non-recovery may also be
given :- Vsduiqj dsEil esa fd;s tk jgs fuekZ.k dk;ksZ ij Bsdsnkjkas }kjk ikuh dh
O;oLFkk Loa; ds [kpsZ ij dh xbZ gS A
ix) Following details of work executed in BSF Campus Tekanpur and ITBP campus Karera during 05-11-2014 to
August 2016 in which clause 36 of agreement is applicable.
a) Agreement No . along with copy of agreement :- enclosed
b) Number of technical representative was to be enganed as per the provision of agreement :- yes
c) Copy of letter vides which the contractor sought the approval of the Engineer in charge regarding
enganging the technical representative in respect of each agreement :- yes
d) Copy of the letter vide which the Engineer in charge accorded the approval of technical representative
in respect of each agreement. yes
ekWxs x;s fjdkMZ esa djkj la[;k 27@bZbZ@thlhMh @2013&14 ds jftLVjkas
dh Nk;k izfr;kW layXu gS A
layXu %& mijksDrkuqlkj
lgk;d vfHk;Urk
Vsduiqj dsUnzh; mieaMy
dsUnzh; yksd fuekZ.k foHkkx
VsduiqjA
iathd`r@esy
Hkkjr ljdkj
dsUnzh; yksd fuekZ.k foHkkx
Áfr]
The Krishan Construction Co.,
Govt. Contractor,
B-158 North ,Ex. Mall, Sector -9
Rohini Delhi -110085
fo"k;% Construction of Infrastructure /Development at newly upgraded STS BSF Academy Tekanpur . SH-
C/o SO’s
Mess with 60 suites No including internal water supply sanitary installation drainage providing
internal electrical installations Conducting for LAN telephone cable TV & its wiring power wiring
main board and DP’s lightening conductor etc.
Agmt. NO :- 27/EE/GCD/2013-2014
.
19th &Final bill
egksn;
mijksDr fo’k;kafdr ys[k gS fd mDr dk;Z vkids }kjk Xokfy;j dsUnzh;
e.My dsyksfufo Xokfy;j ds ek/;e ls 19 okW o vfUre foy dk Abstract izLrqr fd;k x;k
gS ,ao~ bl dk;kZy; esa M.B. izLrqr dh gS ftlds fy;s bl dk;kZy; dk i= le la[;k 155
fg fnukad 6-07-2017 ds }kjk o nwjHkk’k ij tkudkjh nh xbZ Fkh ftlesa vkids }
kjk vkt fnukad rd dksbZ bathfu;j @izfrfuf/k bl dk;kZy; esa ugha Hkstk ,ao~ bl
dk;kZy; }kjk foy ds Measurements tkWp fd;s x;s ftlesa dbZ correction gq, A ,ao~
vkids }kjk tks Qk;uy foy dk Abstract izLrqr fd;k gS mlesa Hkh vkids }kjk iwoZ
foyksa dh HkkWfr u djrs gq, Deviated Qty. @fopyu bqbZ ek=kvksa dks ,d lkFk
tksMk x;k tofd py ys[kk foyksa esa fopyu lhek ls vf/kd ek=kvksa dks Extra for
Devaited item esa fy;k tkrk jgk gS A vr% vkils iqu% vuqjks/k fd;k tkrk gS fd vki
vius bathfu;j@ izfrfuf/k dks Measurements & Abstract dks Bhd djkdj izLrqr djsa ftlls
fd Qkbuy foy dks e.My dk;kZy; esa izsf’kr fd;k tk lds A
lgk;d vfHk;Urk
Vsduiqj dsUnzh; mieaMy]
dsUnzh; yksd fuekZ.k foHkkx VsduiqjA
izfrfyfi %&
1- dk;Zikyd vfHk;ark ]Xokfy;j dsUnzh; e.My] dsUnzh; yksd fuekZ.k
foHkkx] 35 flVh lsUVj Xokfy;j dkas bl dk;kZy; ds i= le la[;k 156 fg
fnukad 6-7-2017 ds lUnHkZ esa lwpukFkZ o vko”;d dk;Zokgh gsrq
izsf’kr A
2- Jh ,l ds feJk] lgk;d vfHk;ark Xokfy;j ifj;kstuk e.My] fdyksfufo Xokfy;j
dks bl dk;kZy; ds i= le la[;k 156 fg fnukad 6-7-2017 ds lUnHkZ
eas d`I;k mijksDRk dk;Z ds Qk;uy foy dks Complete tkWp dj izLrqr
djsa A
lgk;d
vfHk;ark
Hkkjr ljdkj
dsUnzh; yksd fuekZ.k foHkkx
dk;kZy;% lgk;d vfHk;Urk ] Vsduiqj dsUnzh; mieaMy]
Qksu ua-&07524&275353
E-Mail ID-aetcsd11@gmail.com
Áfr]
dk;Zikyd vfHk;ark
Xokfy;j dsUnzh; e.My
Dsyksfufo Xokfy;j A
egksn;
.
lgk;d vfHk;Urk
Vsduiqj dsUnzh; mieaMy]
dsUnzh; yksd fuekZ.k foHkkx VsduiqjA
ABSTRACT OF MEDICAL BILLS
Bill No. Date:
TOTAL: 28094.00
Executive Engineer
Gwalior Central Division
C.P.W.D., Gwalior.
ABSTRACT OF COST
Name of Work: C/o Boundary Wall around the ammunition and explosive depot with
Tactical guard room and over fhead sentry Post i/c. Pdg. IEI Service connection, fans and
fitting compound lighting and street lighting at SPT Bn ITBP, Karera (M.P.).
-
Sl.No Name of Newspaper Bill No. RO No. Amount
.
01 Bennet Coleman & Co BCM17RV- 2013 dated 23548
Ltd. 0000868 17/7/17
02 -do- BCMP17RV- 2006 DATED 31084
000833 14/7/17
03 -do- BCMP17RV- 2006 dated 14483
0000831 14/7/17
Total: 69115
Total: 32492
Name of Work: C/O. Additional Class Room to convert into “A” type school bldg. i/c. IEI
fans compound and street lighting and service connection for K.V. at ITBP, Karera.
-
Sl.No Name of Newspaper Bill No. RO No. Amount
.
01 Bennet Coleman & Co BCM17RV- 2006 dated 1348
Ltd. 0000835 14/7/17
02 -do- BCMP17RV- 2006 DATED 15542
000830 14/7/17
Total: 16890
Name of Work: C/o. STC at BSF Academy, Teekanpur. SH: C/o. Residential Qrts. 10 Nos.
type- 6 Nos. type-III 4 Nos. Type-IV 2 Nos. Type-V BSF Qrts. At STSm, BSF Tekanpur.
Name of Work: A/R & M/O to CPWD Office –cum-Residential Bldg. at 35-City Center,
Gwalior dg. 2017-18 and A/R & M/O to AGMP Colony, Shastri Nagar, Walior.
Name of Work: A/R & M/O to Non-Resdl. Bldgs. At DRTS. I.B. M.V. Palace, Shivpuri.
SH: Misc. Work such as water proofing flooring finishing alum. Etc.
Total 8321
02 Pradesh Today Gwl- 2043 dated 2160
D170700034 19/7/17
Total 2160
ABSTRACT OF COST
Name of Work:- C/o. Toilet and Ramp for Physically challenged student at JNV
Khiriyadevat, Ashok Nagar (MP).
Total 8900
Total 1625
Executivee Engineer
Gwalior Central Division
C.P.W.D., Gwalior.
ABSTRACT OF COST
Name of Work:- Post C/o Anti-termite Treatment to Auditorium and furnishing with
wooden work in Auditorium at IGFRI Jhansi. SH: Post Construction
Anti-termite treatment of various in the Campus.
Name of Work:- Recarpeting of Internal Road from R.P. Gate to Vikash Hostel and
Misc. Works in Senior Officer hostel Mess Bldg. & Trainee officer
Mess bldg. at BSF Acaemy, Tekanpur.
Name of Work:- A/R & M/O to AGMP Resdl. Accommodation and Non-Resdl. Bldgs
at Gwalior.
TOTAL 33675.00
ABSTRACT OF COST
Total 14566.00
ABSTRACT OF COST
Name of Work:- A/R & M/O to CPWD Office-cum-Resdl. Bldg at 35 City Centre,
Gwalior.
Total: 8009.00
ABSTRACT OF COST
Name of Work:- Pdg & Fixing carpet and Chair in 250 persons capacity Auditorium at
BSF Academy, Tekanpur SH: Pdg & Fix flooring carpet and wooden
flooring.
TOTAL: 37961.00
ABSTRACT OF COST
TOTAL: 55335.00
ABSTRACT OF COST
Executive Engineer
Gwalior Central Division
C.P.W.D., Gwalior.
ABSTRACT OF COST
TOTAL: 13435.00
ABSTRACT OF COST
Name of Work:- C/o. Training B lock for signal training school at ITBP, Shivpuri i/c.
Pdg.IEI & fans fittings Air-conditioners, lightning conductor, S/C.
com pound light, DG Set.
32531.00
TOTAL
Executive Engineer
Gwalior Central Division
C.P.W.D., Gwalior.
ABSTRACT OF COST
10542.00
TOTAL
Executive Engineer
Gwalior Central Division
C.P.W.D., Gwalior.
ABSTRACT OF COST
Name of Work: C/o. 250 Persons Auditorium at BSF Academy, Tekanpur.
SH:- Pdg.& Fixing of Auditorium Chairs.
TOTAL 77552.00
G. Total 96259.00
ABSTRACT OF COST
TOTAL: 5784.00
Executive Engineer
Gwalior Central Division
C.P.W.D., Gwalior.
ABSTRACT OF COST
TOTAL: 5784.00
Executive Engineer
Gwalior Central Division
C.P.W.D., Gwalior.
ABSTRACT OF COST
G. Total 12929.00
Executive Engineer
Gwalior Central Division
C.P.W.D., Gwalior.
ABSTRACT OF COST
Name of Work : AR & MO to DRTC, IB at MV Palace, Shivpuri. SH: Retroffing work for
buildings occupied and fully operational to make them barrier free for differently abled persons
at DRTC, IB, MV Palace, Shivpuri.
-
Sl.No Name of Newspaper Bill No. RO No. Amount
.
01 Nai Dunia. NG1803000081 536 dated 5253
dated 11/3/18 9/3/18
02 Raj Express GWL/03- 536 dated 3438
18/01099 dated 9/3/18
10/3/18
03 Dainik Bhaskar AD1799001636 536 dated 2407
dated 10/3/18 9/3/18
Total: 11098
Executive Engineer
Gwalior Central Division
C.P.W.D., Gwalior.
ABSTRACT OF COST
Name of Work : C/O. Accessible India Campaign (Retrofitting works) various central
government buildings at Gwalior..
-
Sl.No Name of Newspaper Bill No. RO No. Amount
.
01 Dainik Bhaskar AD1799001636 655 dated 6573
dated 10/3/18 24/3/18
Total: 6573
ABSTRACT OF COST
Name of Work : Up gradation ofr Conference hall and Parking at Income Tax Gwalior.
TOTAL 17139
Executive Engineer
Gwalior Central Division
C.P.W.D., Gwalior.
ABSTRACT OF COST
Name of Work: C/o Accessible India Campaign (Retrofitting Works) various Central
Government Building at Gwalior.
TOTAL: 11826
ABSTRACT OF COST
Name of Work : AR & MO to DRTC, IB at MV Palace, Shivpuri. SH: Retroffing work for
buildings occupied and fully operational to make them barrier free for differently abled persons
at DRTC, IB, MV Palace, Shivpuri.
-
Sl.No Name of Newspaper Bill No. RO No. Amount
.
01 Nai Dunia. NG1803000081 536 dated 5253
dated 11/3/18 9/3/18
02 Raj Express GWL/03- 536 dated 3438
18/01099 dated 9/3/18
10/3/18
03 Dainik Bhaskar AD1799001636 536 dated 2407
dated 10/3/18 9/3/18
Total: 11098
Executive Engineer
Gwalior Central Division
C.P.W.D., Gwalior.
ABSTRACT OF COST
Name of Work : Accessible India Campaign (Retrofitting works) various Central Governent
Building at Gwalior..
Executive Engineer
Gwalior Central Division
C.P.W.D., Gwalior
ABSTRACT OF COST
Executive Engineer
Gwalior Central Division
C.P.W.D., Gwalior
ABSTRACT OF COST
Name of Work : A/R & M/O to AGMP Colony, Shastri Nagar, Gwalior. SH:
Distempering/painting & Misc. work related to newly allotted qrts. .
-
Sl.No Name of Newspaper Bill No. RO No. Amount
.
01 Nai Dunia NG1807000197 1794 6004
dated 27/07/18
02 Raj Express Gwl/07- 1794 dated 3929
18/00365 26/07/18
Total: 9933.00
Executive Engineer
Gwalior Central Division
C.P.W.D., Gwalior.
ABSTRACT OF COST
Name of Work : Renovation of 6 Nos. toilets at 1st floor at K.V. No.1 Rana Pratap Marg,
Jhansi.
-
Sl.No Name of Newspaper Bill No. RO No. Amount
.
01 Rajasthan Patrika Pvt. Ltd. 23GWO/18/798 1076 dt. 18/5/18 1841.00
dated 19/05/2018
Total 1841.00
Executive Engineer
Gwalior Central Division
C.P.W.D., Gwalior
ABSTRACT OF COST
Name of Work : C/o Annimal Breading Ceentre i/c providing elecdtrical installation fans fire
alarm and fire fighting system air conditioning system class room system and substation
equipment at Regional Ayurvedic Research Institute (RARI) at Gwalior.
-
Sl.No Name of Newspaper Bill No. RO No. Amount
.
1 Bennet, Coleman & Co. Ltd. (1) BCMP18RV- 1234 13321
0001955 dated
5/6/18.
(2) BCMP18RV-
1234 14286
0001956 dated
05/6/18
27607
Executive Engineer
Gwalior Central Division
C.P.W.D., Gwalior.
ABSTRACT OF COST
Name of Work : Providing services of Computer Operaters -3 Nod. Snf vlrtk 01 No. snf 02
Nos. MTS in the office the Executive Engineer/GCD/CPWD/Gwl..
Executive Engineer
Gwalior Central Division
C.P.W.D., Gwalior.
ABSTRACT OF COST
Name of Work : Rain water Harvesting at AGMP Office Bldg., Gwalior. SH: Rin water
harvesting in record room caretaker and staff qrrts. And misc. works for caretaker qrt. At AGMP
Colony Gwalior.
Executive Engineer
Gwalior Central Division
C.P.W.D., Gwalior.
ABSTRACT OF COST
NG1810000156 dtd
2670 dtd 3250
291018 27/10/18
03 Rajasthan Patrika Pvt.Ltd. 23GWO/18/3504 2730 dtd 14169
dtd 01/11/18 31/10/18
23GWO/18/3447
dtd28/10/18 26710 dtd
26/10/18
23GWO/18/3446
dtd28/10/18 2670
Total: 21348
Executive Engineer
Gwalior Central Division
C.P.W.D., Gwalior.
TOTAL 4064
Executive Engineer
Gwalior Central Division
C.P.W.D., Gwalior.
ABSTRACT OF COST
TOTAL 4146/-
Executive Engineer
Gwalior Central Division
C.P.W.D., Gwalior.
ABSTRACT OF COST
Name of Work : Repair & Maintenance of Narcotics Colony, 19, Mall Road, Gwalior.
Sl.No Name of Newspaper Bill No. RO No. Amount
.
01 Nai Dunia NG181000157 2670-A 1625
dated 29/10/18
Total: 6100
Executive Engineer
Gwalior Central Division
C.P.W.D., Gwalior.
ABSTRACT OF COST
Total: 9148
Executive Engineer
Gwalior Central Division
C.P.W.D., Gwalior.
ABSTRACT OF COST
Executive Engineer
Gwalior Central Division
C.P.W.D., Gwalior.
ABSTRACT OF COST
Name of Work : c/o 05 no. rampe and 04 no. toilet for physicaly challenged boys and girls of
school at JNV Tikamgarh.
ABSTRACT
Cha. To:
8245.00
Executive Engineer
Gwalior Central Division
C.P.W.D., Gwalior.
ABSTRACT
Cha. To:
TOTAL: 7314.00
Executive Engineer
Gwalior Central Division
C.P.W.D., Gwalior.
ABSTRACT
Cha. To:
ABSTRACT
Cha. To:
ABSTRACT
Cha. To:
Executive Engineer
Gwalior Central Division
C.P.W.D., Gwalior
ABSTRACT
Cha. To:
Executive Engineer
Gwalior Central Division
C.P.W.D., Gwalior
ABSTRACT
Cha. To:
Executive Engineer
Gwalior Central Division
C.P.W.D., Gwalior
ABSTRACT OF COST
ABSTRACT OF COST
Name of Work
ABSTRACT OF COST
ABSTRACT OF COST
Name of Work Auction for Coal Road Roller at Shastri Nagar, Gwalior.
ABSTRACT
Executive Engineer
Gwalior Central Division
C.P.W.D., Gwalior
ABSTRACT
1,04,864.00
Executive Engineer
Gwalior Central Division
C.P.W.D., Gwalior
ABSTRACT
Executive Engineer
Gwalior Central Division
C.P.W.D., Gwalior.
ABSTRACT OF COST
Name of Work Auction for Coal Road Roller at Shastri Nagar, Gwalior.
TOTAL 7227.00
Passed for Rs.7,227.00 (Rupees Seven thousand two hundred twenty seven only) for payment.
Executive Engineer
Gwalior Central Division
C.P.W.D., Gwalior.
ABSTRACT
Executive Engineer
Gwalior Central Division
C.P.W.D., Gwalior.
ABSTRACT
Ch. to: Deposit –II
(Rupees Two lakhs seventy seven thousand six hundred sixty six only)
Executive Engineer
Gwalior Central Division
C.P.W.D., Gwalior.
ABSTRACT OF COST
Name of Work : A/R &MO to Residential Colony, at Shastri Nagar, Gwalior. SH:
Replacement of damage waterline, sewerline in Qrts.
TOTAL 4268.00
Passed for Rs.4268/- (Rupees four thousand two hundred six eight only) for payment.
Executive Engineer
Gwalior Central Division
C.P.W.D., Gwalior.
ABSTRACT
4151.00
Executive Engineer
Gwalior Central Division
C.P.W.D., Gwalior
ABSTRACT OF COST
Executive Engineer
Gwalior Central Division
C.P.W.D., Gwalior.
ABSTRACT
Executive Engineer
Gwalior Central Division
C.P.W.D., Gwalior
ABSTRACT
Executive Engineer
Gwalior Central Division
C.P.W.D., Gwalior
ABSTRACT
Executive Engineer
Gwalior Central Division
C.P.W.D., Gwalior.
ABSTRACT
Executive Engineer
Gwalior Central Division
C.P.W.D., Gwalior.
ABSTRACT
Executive Engineer
Gwalior Central Division
C.P.W.D., Gwalior.
ABSTRACT
Cha. To:
Gwalior Central Division
Executive Engineer
Gwalior Central Division
C.P.W.D., Gwalior.