This Kaizen report proposes replacing 20 fluorescent lights with LED lights in a production area. It is expected to save Watts of power consumption. The budget for the Kaizen is Rs.__________. The timeline is from March 2019 to April 2019. Benefits are expected in energy savings and the environment through reduced energy and material usage.
This Kaizen report proposes replacing 20 fluorescent lights with LED lights in a production area. It is expected to save Watts of power consumption. The budget for the Kaizen is Rs.__________. The timeline is from March 2019 to April 2019. Benefits are expected in energy savings and the environment through reduced energy and material usage.
This Kaizen report proposes replacing 20 fluorescent lights with LED lights in a production area. It is expected to save Watts of power consumption. The budget for the Kaizen is Rs.__________. The timeline is from March 2019 to April 2019. Benefits are expected in energy savings and the environment through reduced energy and material usage.
This Kaizen report proposes replacing 20 fluorescent lights with LED lights in a production area. It is expected to save Watts of power consumption. The budget for the Kaizen is Rs.__________. The timeline is from March 2019 to April 2019. Benefits are expected in energy savings and the environment through reduced energy and material usage.
Topic of Kaizen: Replacement of fluorescent lighting by LED
Kaizen Ref No: Background of kaizen: Analysis: Conventional lighting used resulting in Currently 20 conventional lighting being used in consumption of –Watts; LED lighting proposed will area of production consume –watts Expected saving of --watts
Budget/Resources for kaizen: Timeline for kaizen:
Expected budget for Kaizen is Rs___________ Start time :March 2019 End time: April 2019
Before : (Mention status in text or graphics/image) After: (Mention status in text or graphics/image)
Result( Details of benefits achieved) Result area: (Tick As applicable)
Productivity/Speed of work/Cycle time reduction Quality: Cost: Delivery: Health: Safety/Security: Environment(energy, air, water, noise): Morale/Motivation: Cleanliness/ Housekeeping Information technology related: Supplier development : Customer /Business development: Design development (tool/jig/fixture/product) Supplier development : Space / location: Documentation Others: