KPG Synergy SDN BHD: Mpi Preliminary Report

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

KPG SYNERGY SDN BHD

MPI PRELIMINARY REPORT


REPORT NO. : KPG-H106-PLMN-MPI-002 EQUIPMENT : AC YOKE PAGE : 1 OF 4
CLIENT : HILONG 106 SERIAL NUMBER : MP1236
PROJECT : MAINTENANCE BARGE HILONG 106 WHITE CONTRAST: FLUXO 7
DATE : 24-SEPT-2019 BLACK INK: FLUXO 3

NDT STATUS
NO. ITEM(S) REMARK
ACCEPT REJECT
1.0 OFFSHORE CONTAINER 1 1) COMPLETE REPORT WILL
1 JT1 √ SUBMIT LATER.
2 JT2 √ 2) NO DEFECT/INDICATION WAS
3 JT3 √ FOUND DURING INSPECTION
4 JT4 √ TIME.

2.0 OFFSHORE CONTAINER 2


1 JT1 √
2 JT2 √
3 JT3 √
4 JT4 √

3.0 OFFSHORE CONTAINER 3


1 JT1 √
2 JT2 √
3 JT3 √
4 JT4 √

4.0 OFFSHORE CONTAINER 4


1 JT1 √
2 JT2 √
3 JT3 √
4 JT4 √

5.0 OFFSHORE CONTAINER 5


1 JT1 √
2 JT2 √
3 JT3 √
4 JT4 √

PREPARED BY : MOHD HUZAIRI BIN RUSLI REVIEW/ACCEPTED BY:


POSITION : MPI TECHNICIAN POSITION :
QUALIFICATION : CSWIP MPI LEVEL II DATE :
SIGNATURE: SIGNATURE:
KPG SYNERGY SDN BHD
MPI PRELIMINARY REPORT
REPORT NO. : KPG-H106-PLMN-MPI-002 EQUIPMENT : AC YOKE PAGE : 2 OF 4
CLIENT : HILONG 106 SERIAL NUMBER : MP1236
PROJECT : MAINTENANCE BARGE HILONG 106 WHITE CONTRAST: FLUXO 7
DATE : 24-SEPT-2019 BLACK INK: FLUXO 3

NDT STATUS
NO. ITEM(S) REMARK
ACCEPT REJECT
6.0 MAINDECK PAD EYE 1) COMPLETE REPORT WILL
1 JT1 √ SUBMIT LATER.
2 JT2 √ 2) NO DEFECT/INDICATION WAS
3 JT3 √ FOUND DURING INSPECTION
4 JT4 √ TIME.
5 JT5 √

7.0 GAS RACK S/N C500003


1 JT1 √
2 JT2 √
3 JT3 √
4 JT4 √

8.0 GAS RACK S/N C500002


1 JT1 √
2 JT2 √
3 JT3 √
4 JT4 √

9.0 CROSS BRACING BAR


1 JT1 √
2 JT2 √
3 JT3 √
4 JT4 √

10.0 LIFTING BAR


1 JT1 √
2 JT2 √
3 JT3 √
4 JT4 √

PREPARED BY : MOHD HUZAIRI BIN RUSLI REVIEW/ACCEPTED BY:


POSITION : MPI TECHNICIAN POSITION :
QUALIFICATION : CSWIP MPI LEVEL II DATE :
SIGNATURE: SIGNATURE:
KPG SYNERGY SDN BHD
MPI PRELIMINARY REPORT
REPORT NO. : KPG-H106-PLMN-MPI-002 EQUIPMENT : AC YOKE PAGE : 3 OF 4
CLIENT : HILONG 106 SERIAL NUMBER : MP1236
PROJECT : MAINTENANCE BARGE HILONG 106 WHITE CONTRAST: FLUXO 7
DATE : 24-SEPT-2019 BLACK INK: FLUXO 3

NDT STATUS
NO. ITEM(S) REMARK
ACCEPT REJECT
11.0 MATERIAL LIFTING BASKET NO.1 1) COMPLETE REPORT WILL
1 JT1 √ SUBMIT LATER.
2 JT2 √ 2) NO DEFECT/INDICATION WAS
3 JT3 √ FOUND DURING INSPECTION
4 JT4 √ TIME.

12.0 MAIN TOWING GEAR


1 JT1 √
2 JT2 √

13.0 EMERGENCY TOWING GEAR


1 JT1 √
2 JT2 √

14.0 GANGWAY PAD EYE


1 JT1 √
1 JT2 √
1 JT3 √
1 JT4 √

15.0 BILLY PUGH TRANSFER BASKET (LIFTING O RING)


1 R1 √

16.0 ESVAGT TRANSFER BASKET (LIFTING O RING)


1 R1 √

PREPARED BY : MOHD HUZAIRI BIN RUSLI REVIEW/ACCEPTED BY:


POSITION : MPI TECHNICIAN POSITION :
QUALIFICATION : CSWIP MPI LEVEL II DATE :
SIGNATURE: SIGNATURE:
KPG SYNERGY SDN BHD
MPI PRELIMINARY REPORT
REPORT NO. : KPG-H106-PLMN-MPI-002 EQUIPMENT : AC YOKE PAGE : 4 OF 4
CLIENT : HILONG 106 SERIAL NUMBER : MP1236
PROJECT : MAINTENANCE BARGE HILONG 106 WHITE CONTRAST: FLUXO 7
DATE : 24-SEPT-2019 BLACK INK: FLUXO 3

NDT STATUS
NO. ITEM(S) REMARK
ACCEPT REJECT
17.0 WASTE GARBAGE CONTAINERS 1) COMPLETE REPORT WILL
1 JT1 √ SUBMIT LATER.
2 JT2 √ 2) NO DEFECT/INDICATION WAS
3 JT3 √ FOUND DURING INSPECTION
4 JT4 √ TIME.

18.0 WASTE GARBAGE CONTAINERS


1 JT1 √
2 JT2 √
3 JT3 √
4 JT4 √

19.0 WASTE GARBAGE CONTAINERS


1 JT1 √
2 JT2 √
3 JT3 √
4 JT4 √

20.0 WASTE GARBAGE CONTAINERS


1 JT1 √
2 JT2 √
3 JT3 √
4 JT4 √

PREPARED BY : MOHD HUZAIRI BIN RUSLI REVIEW/ACCEPTED BY:


POSITION : MPI TECHNICIAN POSITION :
QUALIFICATION : CSWIP MPI LEVEL II DATE :
SIGNATURE: SIGNATURE: