INPUT DATA

KEGIATAN BOX CULVERT

LEBAR BERSIH 1 M TINGGI BERSIH 1 M

PANJANG GALIAN = 7M
LEBAR GALIAN BOX CULVERT = 1.6 M

DALAM BOX CULVERT DARI TANAH = 1.7 M

PANJANG BOX CULVERT = 7M

LEBAR MELINTANG BOX CULVERT = 1.5 M

LEBAR BOX CULVERT = 5M


TEBAL BOX CULVERT = 0.25 M

TEBAL URUG PASIR = 0.1 M

TEBAL LANTAI KERJA = 0.1 M

PANJANG SAYAP BOX CULVERT = 1M


JUMLAH SAYAP = 4M

DALAM SAYAP = 1.5 M

TEBAL SAYAP = 0.25 M

TEBAL URUG PASIR = 0.1 M

TEBAL LANTAI KERJA = 0.1 M

PANJANG TIMBUNAN BOX CULVERT = 7M

LEBAR TIMBUNAN JLN = 7M

TEBAL TIMBUNAN JLN = 0.25 M


JUMLAH DANA = 51,413,231 100%

JUMLAH UPAH = 12,374,936 24.07%

JUMLAH DANA BAHAN = 38,377,975 74.65%

JUMLAH DANA ALAT = 541,250 1.05%


RENCANA ANGGARAN BIAYA ( R.A.B )

KEGIATAN :###
:###
PEKERJAAN :###
###
LOKASI :###

HARGA SATUAN JUMLAH


NO URAIAN PEKERJAAN VOLUME SAT VOLUME
( Rp ) ( Rp )

1 2 3 4 5 6=3x5 3

I PEKERJAAN PERSIAPAN

1 Pekerjaan Pembersihan Lokasi / Pembentukan Badan Jalan 1050.00 M2 7,123.20 7,479,360.00 1,050.00

2 Pekerjaan Pengukuran/ Pas Bowplank 35.00 M1 40,446.00 1,415,610.00 35.00

3 Papan Nama Kegiatan 1.00 Ls 350,000.00 350,000.00 1.00

9,244,970.00

II PEKERJAAN STRUKTUR
1 Plastik Alas Pengecoran Beton 1,050.00 M2 249,072.00 261,525,600.00 1,050.00

2 Cor Beton Bertulang (Wire Mesh M.8) Camp. 1 : 2 : 3 157.50 M3 1,736,043.60 273,426,867.00 152.21

534,952,467.00

III PEKERJAAN FINISHING

1 Pekerjaan Sosotan Aspal 1,050.00 M2 28,694.34 30,129,060.00 1,050.00


2 Pekerjaan Taburan Pasir 1,050.00 M2 4,024.40 4,225,620.00 1,050.00

3 Pekerjaan Timbunan Tanah Setempat Bahu Jalan 7.98 M3 168,252.00 1,342,650.96 105.00

35,697,330.96

IV PEKERJAAN LAIN - LAIN

1 Pekerjaan Pembersihan Akhir 1.00 Ls 500,000.00 500,000.00 1.00

2 Biaya Pembuatan Laporan & Dokumentasi 1.00 bh 500,000.00 350,000.00 1.00

850,000.00

JUMLAH Rp 580,744,767.96
NGGARAN BIAYA ( R.A.B )

HARGA SATUAN JUMLAH


SAT
( Rp ) ( Rp )

4 5 6=3x5

M2 7,123.20 7,479,360.00

M1 40,446.00 1,415,610.00

Ls 350,000.00 350,000.00

9,244,970.00
M2 249,072.00 261,525,600.00

M3 1,736,043.60 264,243,196.36

525,768,796.36

M2 28,694.34 30,129,060.00
M2 4,024.40 4,225,620.00

M3 168,252.00 17,666,460.00

52,021,140.00

Ls 500,000.00 500,000.00

bh 350,000.00 350,000.00

850,000.00
DAFTAR HARGA UPAH DAN BAHAN

KEGIATAN : PEMBANGUNAN/REHABILITASI
TAHUN : 2018
PEKERJAAN : PEMBANGUNAN BOX CULVERT
LOKASI : TELUK MERBAU

NO URAIAN SATUAN

1 2 3

I. UPAH HARIAN

1 Kepala Tukang Harian


2 Mandor Harian
3 Tukang Kayu Harian
4 Tukang Batu Harian
5 Pekerja Harian

II. BAHAN - BAHAN


1 Pasir Cor M3
2 Semen PC @ 50 Kg Kg
3 Kerikil M3
4 Pasir Pasang M3
5 Pasir Urug M3
6 Paku Kg
7 Kawat Ikat Kg
8 Besi Polos U24 diameter 14 Btg
9 Besi Polos U24 diameter 8 Btg
10 Kayu Papan Kelas III M3
11 Triplek 9 mm Lbr
12 Kayu Cerocok 15 cm Btg
13 Plastik Alas Hitam M2
14 Aspal Drum
15 Kayu bakar M3
16 Tanah Timbun M3
17 Pipa PVC diameter 1/2 " Btg
18 Wiremesh M8 Lbr
19 Wiremesh M6 Lbr
20 Sewa Concrete Mixer Hari
21 Sewa Stamper Hari
HARGA UPAH DAN BAHAN

SATUAN
BIAYA

Rp 127,200.00
Rp 127,200.00
Rp 116,600.00
Rp 116,600.00
Rp 106,000.00

Rp 330,000.00
Rp 1,496.00
Rp 352,000.00
Rp 200,000.00
Rp 180,000.00
Rp 19,800.00
Rp 20,000.00
Rp 160,000.00
Rp 108,000.00
Rp 1,980,000.00
Rp 135,000.00
Rp 15,000.00
Rp 7,700.00
Rp 3,025,000.00
Rp 275,000.00
Rp 110,000.00
Rp 28,000.00
Rp 737,000.00
Rp 650,000.00
Rp 300,000.00
Rp 200,000.00
1.5 M

LIONING BOX CULVERT 1.5 x 0.25 M 0.50

0.25

BESI BOX 14
BESI ATAS 14 2.20 M
PANJANG MEMANJANG SAL BOX CULVERT 7 M 1.00 BESI LIONING 14
LEBAR BOX CULVERT TOTAL DINDING L = 1.5 M BESI SAYAP 14
PENULANGAN2 LAPIS
BESI ARAH MEMANJANG
2 LAPIS DIA 14

0.25
0.10
0.10

Box culvert
Penulangan
Lantai, dinding
besi type U
H besi diamtr 14
Lantai Kerja
Pasir Urug
Cerucuk kayu
Dia 10-15cm
DETAIL MELINTANG

7 METER
1M 1M

LIONING

BOX CULVERT

DINDING SAYAP BOX CULVERT


PENULANGAN 2 LAPIS
1.5 M BESI DIAMETER 14 MM

LANTAI KERJA T 0.1 M


PASIR URUG T 0.1 M
RENCANA ANGGARAN BIAYA ( R.A.B )

KEGIATAN : PEMBANGUNAN/REHABILITASI
TAHUN : 2018
PEKERJAAN : PEMBANGUNAN BOX CULVERT
LOKASI : TELUK MERBAU
PANJANG : 7 M
LEBAR : 1.5 M

NO URAIAN PEKERJAAN VOLUME SAT

1 2 3 4

I PEKERJAAN PERSIAPAN

1 Pembuatan Papan Nama Kegiatan 1.00 Ls

2 Pekerjaan Pengukuran/ Pas Bowplank 7.00 M1

II PEKERJAAN STRUKTUR

1 Galian Box Culvert 9.52 M3

2 Pekerjaan Cerucuk dia 15cm p=4m 42.00 Btg


3 Pekerjaan Urugan Pasir t=5cm 1.05 M3
4 Pekerjaan Lantai Kerja t=5 cm 1.05 M3
5 Pekerjaan Pembesian U24 1,141.35 Kg
6 Pekerjaan Cor Beton 1:2:3 Box Culvert 8.75 M3

7 Pekerjaan Timbunan 12.25 M3

II PEKERJAAN LIONING

1 Pekerjaan Pembesian U24 57.97 Kg

2 Pekerjaan Cor Beton 1:2:3 Box Culvert Drainase 0.38 M3

III PEKERJAAN SAYAP BOX CULVERT


1 Galian Box Culvert 1.50 M3

2 Pekerjaan Cerucuk dia 15cm p=4m 12.00 Btg

3 Pekerjaan Urugan Pasir t=5cm 0.10 M3

4 Pekerjaan Lantai Kerja t=5 cm 0.10 M3

5 Pekerjaan Pembesian U24 144.94 Kg


6 Pekerjaan Cor Beton 1:2:3 Box Culvert 1.70 M3
VOLUME PEKERJAAN DIMENSI
p l t
NO URAIAN PEKERJAAN FORMULA
m m m
A PEKERJAAN STRUKTUR
1 Galian box culvert 7.00 1.60 1.70
2 bouwplank 7.00
3 Papan Nama

4 Timbunan Tanah dan Perataan 7.00 7.00 0.25


5 Pemadatan Tanah 7.00 7.00 0.25

6 Pek. Cerocok 4.00

6 Pek. Urug Pasir 7.00 1.50 0.10

7 Pek. Lantai kerja 7.00 1.50 0.10

8 Pek. Pembesian

9 Beton Bertulang Struktur Box culvert 7.00 5.00 0.25

B PEKERJAAN LIONING
1 Pembesian u24
2 Beton Bertulang Lioning 1.50 0.25 0.50

C PEKERJAAN SAYAP
1 Galian sayap 1.00 1.50 0.25
Pek. Cerocok
Pek. Urug Pasir 1.00 0.25 0.10
Pek. Lantai kerja 1.00 0.25 0.10
Pek. Pembesian
11 Beton Bertulang Sayap 4 sisi 1.00 1.70 0.25
DIMENSI
n
Volume
(jumlah)

1.00 9.52
7.00
1.00

1.00 12.25
1.00 12.25

42.00 42.00

1.00 1.05

1.00 1.05

1,141.35

1.00 8.75

57.97
2.00 0.38

4.00 1.50
12.00 12.00
4.00 0.10
4.00 0.10
144.94
4.00 1.70
DAFTAR ANALISA HARGA SATUA
Berdasarkan Permen PUPR NO. 28/PRT/M/201

KEGIATAN : PEMBANGUNAN/REHABILITASI
PEKERJAAN : PEMBANGUNAN BOX CULVERT
LOKASI : TELUK MERBAU

NO URAIAN KOEF SATUAN

1 2 3 4

1 1 M2 MEMBERSIHKAN LAPANGAN DAN


PEMERATAAN
UPAH
Pekerja 0.060 Oh
Mandor 0.006 Oh

2 1 M PENGUKURAN DAN PEMASANGAN


BOUWPLANK
BAHAN
Kayu Kelas III 0.0130 M3
Paku biasa 0.020 Kg
UPAH
Pekerja 0.100 Oh
Tukang 0.010 Oh
Kepala tukang 0.010 Oh
Mandor 0.010 Oh

3 Galian Tanah
UPAH
Pekerja 0.563 Oh
Mandor 0.056 Oh

4 1 M3 URUG PASIR
BAHAN
Pasir urug 1.200 M2
UPAH
Pekerja 0.300 Oh
Mandor 0.010 Oh

5 1 BTG PEMANCANGAN KAYU CERUCUK DIA 10 - 15 CM


BAHAN
Kayu Cerucuk 1.000 Btg
UPAH
Pekerja 0.100 OH
Tukang Kayu 0.025 OH
Kepala tukang 0.013 OH
Mandor 0.006 OH

5 1 M3 BETON BERTULANG 1 PC : 3 PS : 5 KR
BAHAN
Semen portland 200.000 Kg
Pasir beton 0.522 M3
Kerikil 0.862 M3
NO URAIAN KOEF SATUAN

1 2 3 4
UPAH
Pekerja 1.320 OH
Tukang batu 0.220 OH
Kepala tukang 0.022 OH
Mandor 0.132 OH

6 1 M3 BETON BERTULANG 1 PC : 2 PS : 3 KR SETARA k-175 kG/CM2


BAHAN
Semen portland 326.000 Kg
Pasir beton 0.540 M3
Kerikil 0.810 M3
UPAH
Pekerja 1.323 OH
Tukang batu 0.189 OH
Kepala tukang 0.019 OH
Mandor 0.132 OH

ALAT
Concrete Mixer 0.1667 Hari
Alat bantu 1.000 Hari

7 1 KG PEKERJAAN PEMBESIAN

BAHAN
Besi Tulangan Polos U24 1.050 Kg
Kawat Ikat 0.021 Kg

UPAH
Pekerja 0.021 OH
Tukang batu 0.015 OH
Kepala tukang 0.001 OH
Mandor 0.002 OH
NO URAIAN KOEF SATUAN

1 2 3 4

8 Bekesting 1 M3 Beton Bertulang


BAHAN
Kayu Kelas III 0.147 M3
Triplek 9mm 1.667 Lbr
Paku biasa 0.300 Kg
UPAH
Pekerja 0.150 Oh
Tukang batu 0.080 Oh
Kepala tukang 0.005 Oh
Mandor 0.005 Oh

9 1 M3 Beton Bertulang Bertulang


BAHAN
Beton Cor 1 : 2 : 3 ( a ) 1.000 Pek
Bekesting 1.000 Pek

10 Sosotan Aspal / M2

BAHAN
Kg Aspal 1.500 Kg
Minyak Tanah (Kerosin) 0.350 Ltr
M3 kayu bakar 0.010 M3

UPAH
Mandor 0.001 Oh
Pekerja 0.010 Oh

11 Taburan Pasir / M2

BAHAN
M3 Pasir Cor 0.005 M3

UPAH
Mandor 0.002 Oh
Pekerja 0.020 Oh

12 Timbunan Tanah didatangkan / M3


Bahan
Tanah Timbun 1.200 M3
UPAH
Pekerja 0.3300 Oh
Mandor 0.0100 Oh

13 Pemadatan Tanah
UPAH
NO URAIAN KOEF SATUAN

1 2 3 4
Pekerja 0.5000 Oh
Mandor 0.0500 Oh

14 Upah Angkut
UPAH
Pekerja 0.2480 Oh
Mandor 0.1240 Oh
R ANALISA HARGA SATUAN
rkan Permen PUPR NO. 28/PRT/M/2016

HARGA SATUAN JUMLAH HARGA TOTAL


( Rp ) ( Rp ) ( Rp )
5 6=3x5 7

106,000.00 6,360.00
127,200.00 763.20
7,123.20

1,980,000.00 25,740.00
19,800.00 396.00

106,000.00 10,600.00
116,600.00 1,166.00
127,200.00 1,272.00
127,200.00 1,272.00
Rp 14,310.00
40,446.00

Rp 106,000.00 59,678.00
Rp 127,200.00 7,161.36
66,839.36

180,000.00 216,000.00

106,000.00 31,800.00
127,200.00 1,272.00
249,072.00

15,000.00 15,000.00

106,000.00 10,600.00
116,600.00 2,915.00
127,200.00 1,653.60
127,200.00 763.20 Rp 30,931.80

1,496.00 299,200.00
330,000.00 172,260.00
352,000.00 303,424.00
HARGA SATUAN JUMLAH HARGA TOTAL
( Rp ) ( Rp ) ( Rp )
5 6=3x5 7

106,000.00 139,920.00
116,600.00 25,652.00
127,200.00 2,798.40
127,200.00 16,790.40 Rp 960,044.80

1,496.00 487,696.00
330,000.00 178,200.00
352,000.00 285,120.00

106,000.00 140,238.00
116,600.00 22,037.40
127,200.00 2,416.80
127,200.00 16,790.40

300,000.00 50,000.00
5,000.00 5,000.00
1,187,498.60

13,333.33 14,000.00
20,000.00 420.00

106,000.00 2,226.00
116,600.00 1,714.02
127,200.00 186.98
127,200.00 267.12 Rp 18,814.12
HARGA SATUAN JUMLAH HARGA TOTAL
( Rp ) ( Rp ) ( Rp )
5 6=3x5 7

1,980,000.00 291,060.00
135,000.00 225,045.00
19,800.00 5,940.00

106,000.00 15,900.00
116,600.00 9,328.00
127,200.00 636.00
127,200.00 636.00

548,545.00

1,187,498.60 1,187,498.60
548,545.00 548,545.00

1,736,043.60

14,404.76 21,607.14
9,000.00 3,150.00
275,000.00 2,750.00

127,200.00 127.20
106,000.00 1,060.00

28,694.34

Rp 330,000.00 1,650.00

Rp 127,200.00 254.40
Rp 106,000.00 2,120.00

4,024.40

Rp 110,000.00 132,000.00

Rp 106,000.00 34,980.00
Rp 127,200.00 1,272.00
168,252.00
HARGA SATUAN JUMLAH HARGA TOTAL
( Rp ) ( Rp ) ( Rp )
5 6=3x5 7
Rp 106,000.00 53,000.00
Rp 127,200.00 6,360.00
59,360.00

Rp 106,000.00 26,288.00
Rp 127,200.00 15,772.80
42,060.80
PERHITUNGAN B
HARGA
NO NAMA PEKERJAAN KOEF VOLUME SATUAN
SATUAN
(Rp)
A. PEKERJAAN STRUKTUR
A. PERSIAPAN
1. PLANK NAMA

B. PEKERJAAN Box Culvert


1. GALIAN Box Culvert 9.52 M3
A. UPAH
MANDOR 0.056 0.535976 127,200
PEKERJA 0.563 5.360 106,000

2. PEKERJAAN CEROCOK DIA 15 P=3M 42 PTG


A. UPAH
MANDOR 0.006 0.252 127,200
K.TUKANG 0.013 0.546 127,200
TUKANG 0.025 1.050 116,600
PEKERJA 0.100 4.200 106,000
B. BAHAN
CEROCOK 15CM P=3M 1.000 42
3. PEK. URUG PASIR 1.05 M3
A. UPAH
MANDOR 0.010 0.011 127,200
K.TUKANG - - 127,200
TUKANG - - 116,600
PEKERJA 0.300 0.315 106,000
B. BAHAN
PASIR URUG 1.200
4. PEK. LANTAI KERJA 1.050 M3
A. UPAH
MANDOR 0.132 0.139 127,200
K.TUKANG 0.022 0.023 127,200
TUKANG 0.220 0.231 116,600
PEKERJA 1.320 1.386 106,000
B. BAHAN
SEMEN 200.000
KERIKIL 0.862
PASIR 0.522
4. PEK. PEMBESIAN 1141.35 Kg
A. UPAH
MANDOR 0.002 2.397 127,200
K.TUKANG 0.001 1.678 127,200
TUKANG 0.015 16.778 116,600
PEKERJA 0.021 23.968 106,000
B. BAHAN
BESI DIAMETER 14 1.050
BESI DIAMETER 8 -
KAWAT IKAT 0.021
5. PEK.MAL/ BEKISTING 8.75 M3
A. UPAH
MANDOR 0.005 0.044 127,200
K.TUKANG 0.005 0.044 127,200
TUKANG 0.080 0.700 116,600
PEKERJA 0.150 1.313 106,000
B. BAHAN
KAYU 0.147
TRPLK 9MM 1.667
PAKU 0.300
6. PEK. COR BETON 8.75 M3
A. UPAH
MANDOR 0.132 1.155 127,200
K.TUKANG 0.019 0.166 127,200
TUKANG 0.189 1.654 116,600
PEKERJA 1.323 11.576 106,000
B. BAHAN
SEMEN 326.000
PASIR COR 0.540
KERIKIL 0.810
C. PERALATAN
CONCRETE MIXER/MOLEN 0.167 1.458
ALAT KERJA 1.000 8.750
7. PEK. TIMBUNAN 12.25 M3
A. UPAH
MANDOR 0.010 0.123 127,200
K.TUKANG 127,200
TUKANG 116,600
PEKERJA 0.330 4.043 106,000
B. BAHAN
TANAH TIMBUN 1.200
C. PERALATAN
STAMPER 0.270 3.308
ALAT KERJA 1.000 12.250
B. PEKERJAAN LIONING
4. PEK. PEMBESIAN 60.87 Kg
A. UPAH
MANDOR 0.002 0.128 127,200
K.TUKANG 0.001 0.089 127,200
TUKANG 0.015 0.895 116,600
PEKERJA 0.021 1.278 106,000
B. BAHAN
BESI DIAMETER 14 1.050 57.97
BESI DIAMETER 8 -
KAWAT IKAT 0.021
5. PEK.MAL/ BEKISTING 0.375 M3
A. UPAH
MANDOR 0.005 0.002 127,200
K.TUKANG 0.005 0.002 127,200
TUKANG 0.080 0.030 116,600
PEKERJA 0.150 0.056 106,000
B. BAHAN
KAYU 0.147
TRPLK 9MM 1.667
PAKU 0.300
6. PEK. COR BETON 0.375 M3
A. UPAH
MANDOR 0.132 0.050 127,200
K.TUKANG 0.019 0.007 127,200
TUKANG 0.189 0.071 116,600
PEKERJA 1.323 0.496 106,000
B. BAHAN
SEMEN 326.000
PASIR COR 0.540
KERIKIL 0.810
C. PERALATAN
CONCRETE MIXER/MOLEN 0.167 0.063
ALAT KERJA 1.000 0.375
PERHITUNGAN BAHAN UPAH DAN ALAT
JUMLAH JUMLAH SEWA ALAT
UPAH BAHAN ALAT KERJA
(Rp) (HARI) (LS)

68,176
568,135

32,054 32,054
69,451 69,451
122,430 122,430
445,200 445,200

42.00 630,000
1,299,136

1,336
-
-
33,390

1.26

17,630
2,938
26,935
146,916

210.00
0.91
0.55

304,877
213,414
1,956,297
2,540,645

1,198.42
-
23.97
5,565
5,565
81,620
139,125

1.29
14.59
2.63

146,916
21,147
192,827
1,227,083

2,852.50
4.73
7.09

437,500.00
43,750.00

15,582
-
-
428,505

14.70

119,070.00
61,250.00

16,260.44
11,382.31
104,337.83
135,503.68

60.87
-
1.22

239
239
3,498
5,963
0.06
0.63
0.11

6,296
906
8,264
52,589

122.25
0.20
0.30

18,750.00
1,875.00
PERHITUNGAN B
HARGA
NO NAMA PEKERJAAN KOEF VOLUME SATUAN
SATUAN
(Rp)
C. PEKERJAAN SAYAP BOX CULVERT
1. GALIAN SAYAP 1.5 M3
A. UPAH
MANDOR 0.056 0.084 127,200
PEKERJA 0.563 0.8445 106,000

2. PEKERJAAN CEROCOK DIA 15 P=3M 12 PTG


A. UPAH
MANDOR 0.006 0.072 127,200
K.TUKANG 0.013 0.156 127,200
TUKANG 0.025 0.300 116,600
PEKERJA 0.100 1.200 106,000
B. BAHAN
CEROCOK 15CM P=3M 1.000
3. PEK. URUG PASIR 0.1 M3
A. UPAH
MANDOR 0.010 0.001 127,200
K.TUKANG - - 127,200
TUKANG - - 116,600
PEKERJA 0.300 0.030 106,000
B. BAHAN
PASIR URUG 1.200
4. PEK. LANTAI KERJA 0.100 M3
A. UPAH
MANDOR 0.132 0.013 127,200
K.TUKANG 0.022 0.002 127,200
TUKANG 0.220 0.022 116,600
PEKERJA 1.320 0.132 106,000
B. BAHAN
SEMEN 200.000
KERIKIL 0.862
PASIR 0.522
4. PEK. PEMBESIAN 152.183 Kg
A. UPAH
MANDOR 0.002 0.320 127,200
K.TUKANG 0.001 0.224 127,200
TUKANG 0.015 2.237 116,600
PEKERJA 0.021 3.196 106,000
B. BAHAN
BESI DIAMETER 14 1.050 144.93612
BESI DIAMETER 8 1.050
KAWAT IKAT 0.021
5. PEK.MAL/ BEKISTING 1.7 M3
A. UPAH
MANDOR 0.005 0.009 127,200
K.TUKANG 0.005 0.009 127,200
TUKANG 0.080 0.136 116,600
PEKERJA 0.150 0.255 106,000
B. BAHAN
KAYU 0.147
TRPLK 9MM 1.667
PAKU 0.300
6. PEK. COR BETON 1.7 M3
A. UPAH
MANDOR 0.132 0.224 127,200
K.TUKANG 0.019 0.032 127,200
TUKANG 0.189 0.321 116,600
PEKERJA 1.323 2.249 106,000
B. BAHAN
SEMEN 326.000
PASIR COR 0.540
KERIKIL 0.810
C. PERALATAN
CONCRETE MIXER/MOLEN 0.167 0.283
ALAT KERJA 1.000 1.700
7. PEK. TIMBUNAN 0 M3
A. UPAH
MANDOR 0.010 - 127,200
K.TUKANG - - 127,200
TUKANG - - 116,600
PEKERJA 0.330 - 106,000
B. BAHAN
TANAH TIMBUN 1.200
C. PERALATAN
STAMPER 0.270 -
ALAT KERJA 1.000 -
PERHITUNGAN BAHAN UPAH DAN ALAT
JUMLAH JUMLAH SEWA ALAT
UPAH BAHAN ALAT KERJA
(Rp) (HARI) (LS)

10,742
89,517

9,158
19,843
34,980
127,200

12.00

127
-
-
3,180

0.12

1,679
280
2,565
13,992

20.00
0.09
0.05

40,651
28,456
260,845
338,759

159.79
-
3.20

1,081
1,081
15,858
27,030

0.25
2.83
0.51

28,544
4,109
37,464
238,405

554.20
0.92
1.38

85,000.00
8,500.00

-
-
-
-

-
-
NO BAHAN VOLUME
NAMA BAHAN SATUAN BOX LINONG SAYAP
1 Pasir Cor M3 5.27 0.20 0.05
2 Semen PC @ 50 Kg ZAK 3,062.50 122.25 20.00
3 Kerikil M3 7.99 0.30 0.09
4 Pasir Pasang M3 - - -
5 Pasir Urug M3 1.26 - 12.00
6 Paku Kg 2.63 0.11 0.51
7 Kawat Ikat Kg 23.97 1.22 3.20
8 Besi Polos U24 diameter 14 Kg 1,198.42 60.87 159.79
9 Besi Polos U24 diameter 8 Kg - - -
10 Kayu Papan Kelas III M3 1.29 0.06 0.25
11 Triplek 9 mm Lbr 14.59 0.63 2.83
12 Kayu Cerocok 15 cm Btg 42.00 - 12.00
13 Plastik Alas Hitam M2 - - -
14 Aspal Drum - - -
15 Kayu bakar M3 - - -
16 Tanah Timbun M3 14.70 - -
17 Pipa PVC diameter 1/2 " Btg - - -
18 Wiremesh M8 Lbr - - -
19 Wiremesh M6 Lbr - - -

NO REKAP UPAH VOLUME


PEKERJAAN SATUAN BOX LINONG SAYAP
1 MANDOR HOK 592,136 22,795.34 91,983
2 K.TUKANG HOK 312,516 12,527.11 53,769
3 TUKANG HOK 2,496,208.43 116,099.86 351,711
4 PEKERJA HOK 5,723,053.59 194,055.43 838,083

NO REKAP ALAT VOLUME


SATUAN BOX LINONG SAYAP
1 CONCRETE VIBRATOR HOK 437,500 18,750.00 85,000
2 STAMPER HOK 119,070 - -
3 ALAT KERJA HOK 105,000.00 1,875.00 8,500
JUMLAH DIBULATKAN
5.53 6.00
64.10 64.00
8.38 8.00
- -
13.26 13.00
3.25 3.00
28.38 28.00
1,419.08 118.00
- -
1.59 2.00
18.05 18.00
54.00 54.00
- -
- -
- -
14.70 15.00
- -
- -
- -

JUMLAH DIBULATKAN
706,914.48 706,914.00
378,811.39 378,811.00
2,964,019.25 2,964,019.00
6,755,191.81 6,755,192.00

JUMLAH DIBULATKAN
541,250.00 541,250.00
119,070.00 119,070.00
115,375.00 115,375.00
KEBUTUHAN MATERIAL PER METER KUBIK
1 M3 BETON BOX CULVERT UKURAN 1 x 1
V TOTAL 8.75 M3 BETON
V 1 M3 BETON
L 5M
T 0.25 M
P 0.8 M

A. PERHITUNGAN MAL/ BEKSITING PER 1 M3 BETON


DIKETAHUI
P 0.8 PANJANG SALURAN BETON 1 M3
L 5 LEBAR SALURAN BETON 1M3
MAKA KEBUTUHAN :
A. PAPAN MAL MULTIPLEK 9MM = 2.88 M2
P = 0.8
H1 = 1 M TINGGI DALAM
H2 = 1 M TINGGI DALAM
H3 = 1 M LEBAR ATAS DALAM
H4 = 1.5 M TINGGI LUAR
H5 = 1.5 M TINGGI LUAR
H = 6
N = 1
V = 4.8 M2 = 1.667 LBR

B. KAYU SKOR TEGAK


KAYU DIGUNAKAN : 0.05 X 0.07 M
JARAK SKOR 0.25 M'
PANJANG SKOR 1 M' BAGIAN DALAM
PANJANG SKOR 1.5 M' BAGIAN LUAR
P = 0.8 M'
N = 10 POTONG
PK = 2.5 M PANJANG KAYU POTONGAN SKOR
V = PK x 0,05 x 0,07 x N = 0.088 M3
VOLUME = 0.088 M3

C. KAYU SKOR DATAR


KAYU DIGUNAKAN : 0.05 X 0.07 M
JUMLAH SKOR 3 BARIS
PANJANG ATAS 0.8 M' BAGIAN DALAM
PANJANG TENGAH 0.45 M' BAGIAN DALAM
PANJANG BAWAH 0.8 M' BAGIAN DALAM
PANJANG ATAS 0.8 M' BAGIAN LUAR
PANJANG TENGAH 0.45 M' BAGIAN LUAR
PANJANG BAWAH 0.8 M' BAGIAN LUAR
PANJANG TOTAL 4.1 M'

P = 4.1 M'
V = P x 0,05 x 0,07 = 0.014 M3
VOLUME = 0.014 M3
D. KAYU SKOR PERKUATAN
KAYU DIGUNAKAN : 0.05 X 0.1 M
JUMLAH SKOR 3 BARIS
PANJANG ATAS 1 M' BAGIAN DALAM
PANJANG TENGAH 1 M' BAGIAN DALAM
PANJANG BAWAH 1 M' BAGIAN DALAM
PANJANG TOTAL 3 M'

P = 3 M'
V = P x 0,05 x 0,1 x N = 0.045 M3
VOLUME = 0.045 M3
JIKA VOLUME BEKISTING DIGUNAKAN SEBANYAK 3X MAKA
VOLUME TOTAL
V = 0.147 M3 1x PAKAI MENJADI 0.147 M3

PERHITUNGAN BESI BOX CULVERT PER 1 M3 BETON


DIKETAHUI
P 0.8 PANJANG BETON 1 M3
L 3.9 LEBAR BETON 1M3
MAKA KEBUTUHAN :
A. BESI TULANGAN U24POLOS DIAMETER 14 (BESI UTAMA)
BESI U
DIA = 14 mm
A BESI = 0.0001539 m2
W = 1.207801 Kg/M'
KEBUTUHAN BESI DINDING DAN LANTAI BAWAH
PJG 1 = 4.2 BESI U MELINTANG BAGIAN LUAR
PJG 2 = 3.6 BESI U MELINTANG BAGIAN DALAM
JUMLAH = 5 POTONG jarak besi tul 0.2
39 M
PJG 3 = 0.8 BESI KE ARAH PANJANG 10 M'
JUMLAH = 41 POTONG
PJG 3 = 32.8 M
TOTAL = 71.8 M
BTG BESI = 6 BTG
JUMLAH = 6 BTG = 86.961672 Kg/M3

PERHITUNGAN BESI BOX CULVERT PER 1 M3 BETON


DIKETAHUI
P 0.8 PANJANG BETON 1 M3
L 3.9 LEBAR BETON 1M3
MAKA KEBUTUHAN :
A. BESI TULANGAN U24POLOS DIAMETER 14 (BESI UTAMA)
BESI U
DIA = 14 mm
A BESI = 0.0001539 m2
W = 1.207801 Kg/M'
KEBUTUHAN BESI MELINTANG LANTAI ATAS
PJG 1 = 1.6 ATAS
PJG 2 = 1.6 BAWAH
JUMLAH = 5 POTONG jarak besi tul 0.2
16 M
KEBUTUHAN BESI MEMANJANG LANTAI ATAS
PJG 1 = 0.8 ATAS
PJG 2 = 0.8 BAWAH
JUMLAH = 9 POTONG jarak besi tul 0.2
14.4 M
BTG BESI = 3 BTG
JUMLAH = 3 BTG = 43.480836 Kg/M3
TOTAL = 9 BTG = 130.44 Kg/M3

PERHITUNGAN BESI LIONING PER 1 M3 BETON


DIKETAHUI
VOLUME 0.375 M3
P 1.5 PANJANG BETON 1 M3
LEBAR 0.25 M3
TINGGI 0.5 M3
MAKA KEBUTUHAN :
A. BESI TULANGAN U24POLOS DIAMETER 14 (BESI UTAMA)
BESI U
DIA = 14 mm
A BESI = 0.0001539 m2
W = 1.207801 Kg/M'
KEBUTUHAN BESI TEGAK
PJG 1 = 1.05 M
JUMLAH = 16 POTONG
16.8 M
BTG BESI = 2 BTG
KEBUTUHAN BESI MEMANJANG
JUMLAH = 12 POTONG
PJG 2 = 1.5 M
JUMLAH = 18 M
BTG BESI = 2 BTG
JUMLAH = 4 BTG = 57.974448 Kg/M3

PERHITUNGAN BESI SAYAP PER 1 M3 BETON


DIKETAHUI
VOLUME 0.375 M3
P 1 PANJANG BETON 1 M3
LEBAR 0.25 M3
TINGGI 1.5 M3
MAKA KEBUTUHAN :
A. BESI TULANGAN U24POLOS DIAMETER 14
BESI U
DIA = 14 mm
A BESI = 0.0001539 m2
W = 1.207801 Kg/M'
KEBUTUHAN BESI TEGAK UNTUK 1 SAYAP
PJG 1 = 1.95 M BESI U
JUMLAH = 6 POTONG
11.7 M
BTG BESI = 1 BTG
KEBUTUHAN BESI MEMANJANG
JUMLAH = 17 POTONG
PJG 2 = 1 M
JUMLAH = 17 M
BTG BESI = 1.5 BTG
JUMLAH = 10 BTG = 144.93612 Kg/M3
SKETSA PENAMPANG DRAINASE
RENCANA ANGGARAN BIAYA ( R.A.B )

BIDANG :
KEGIATAN : PEMBANGUNAN/REHABILITASI
TAHUN : 2018
PEKERJAAN : PEMBANGUNAN BOX CULVERT
LOKASI : TELUK MERBAU
WAKTU PELAKSANAAN :

NO URAIAN PEKERJAAN VOLUME SATUAN

1 2 3

I PEKERJAAN PENDAHULUAN
1 Papan Nama Kegiatan 1.00 Bh

II BAHAN - BAHAN

1 Pasir Cor 6.00 M3


2 Semen PC 50 Kg 64.00 Sak

3 Kerikil 8.00 M3

4 Paku 3.00 Kg
5 Kawat Ikat 28.00 Kg

6 Besi Polos U24 diameter 14 118.00 Btg

7 Kayu Kelas III 2.00 M3

8 Triplek 9mm 18.00 Lbr

9 Kayu Cerucuk dia 10-15 cm 54.00 Btg


10 Tanah Timbun 15.00 M3

11 Alat Bantu 1.00 Ls

III UPAH TENAGA KERJA

1 Mandor 1.00 5.56 HARI

2 Kepala Tukang 1.00 2.98 HARI


3 Tukang 2.00 12.71 HARI

4 Pekerja 13.00 4.90 HARI


5 Honor Tenaga Teknis Kegiatan 1.00 Org Ls

6 Honor Tim TPK 1.00 Org Ls

IV SEWA PERALATAN
1 Concrete Mixer 1.00 1.80 HARI

2 Stamper 1.00 0.60 Ls

TERBILANG :
N BIAYA ( R.A.B )

HARGA SATUAN
+ JUMLAH
PPN ( Rp )
( Rp )
4 5=2x4

Rp 330,000.00 Rp 330,000.00

Rp 330,000.00 Rp 1,980,000.00
Rp 74,800.00 Rp 4,787,200.00

Rp 352,000.00 Rp 2,816,000.00

Rp 19,800.00 Rp 59,400.00
Rp 20,000.00 Rp 560,000.00

Rp 160,000.00 Rp 18,880,000.00

Rp 1,980,000.00 Rp 3,960,000.00

Rp 135,000.00 Rp 2,430,000.00

Rp 15,000.00 Rp 810,000.00
Rp 110,000.00 Rp 1,650,000.00

Rp 115,375.00 Rp 115,375.00

Rp 38,047,975.00

Rp 127,200.00 Rp 706,914.00

Rp 127,200.00 Rp 378,811.00
Rp 116,600.00 Rp 2,964,019.00

Rp 106,000.00 Rp 6,755,192.00
Rp 1,000,000.00 Rp 1,000,000.00

Rp 570,000.00 Rp 570,000.00

Rp 12,374,936.00

Rp 300,000.00 Rp 541,250.00

Rp 200,000.00 Rp 119,070.00

JUMLAH Rp 51,413,231.00
JADWAL PELAKSANAAN PEKERJAAN

KEGIATAN : PEMBANGUNAN/REHABILITASI
TAHUN : 2018
PEKERJAAN : PEMBANGUNAN BOX CULVERT
LOKASI : TELUK MERBAU
PANJANG : 7 M
LEBAR : 1.5 M

JADWAL PELAKSANAAN PE
NO URAIAN PEKERJAAN VOL SAT HARGA SATUAN BOBOT MIN
( Rp ) (%) 1 2 3 4
1 2 3 4 5 1-6 7-13 14-20 21-27

I PEKERJAAN PERSIAPAN

1 Pembuatan Papan Nama Kegiatan 1.00 Ls 330,000.00 0.65 0.65


PROGRESS
2 Pekerjaan Pengukuran/ Pas Bowplank 7.00 M1 40,446.00 0.56 0.56 RENCANA
1.21
II PEKERJAAN STRUKTUR
1 Galian Box Culvert 9.52 M3 66,839.36 1.26 1.26
2 Pekerjaan Cerucuk dia 15cm p=4m 42.00 Btg 30,931.80 2.57 2.57
3 Pekerjaan Urugan Pasir t=5cm 1.05 M3 249,072.00 0.52 0.52
4 Pekerjaan Lantai Kerja t=5 cm 1.05 M3 960,044.80 1.99 1.99
5 Pekerjaan Pembesian U24 1,141.35 Kg 18,814.12 42.48 14.16 14.16 14.16
6 Pekerjaan Cor Beton 1:2:3 Box Culvert 8.75 M3 1,736,043.60 30.05 10.02 10.02
7 Pekerjaan Timbunan 12.25 M3 168,252.00 4.08
82.94
II PEKERJAAN LIONING
1 Pekerjaan Pembesian U24 57.97 Kg 18,814.12 2.16
2 Pekerjaan Cor Beton 1:2:3 Box Culvert Dr 0.38 M3 1,736,043.60 1.29
3.45
III PEKERJAAN SAYAP BOX CULVERT
1 Galian Box Culvert 1.50 M3 66,839.36 0.20
2 Pekerjaan Cerucuk dia 15cm p=4m 12.00 Btg 30,931.80 0.73
3 Pekerjaan Urugan Pasir t=5cm 0.10 M3 249,072.00 0.05
4 Pekerjaan Lantai Kerja t=5 cm 0.10 M3 960,044.80 0.19
5 Pekerjaan Pembesian U24 144.94 Kg 18,814.12 5.39
6 Pekerjaan Cor Beton 1:2:3 Box Culvert 1.70 M3 1,736,043.60 5.84
12.40
TOTAL DANA JUMLAH 100.00
PROGRESS RENCANAN MINGGUAN - 5.04 16.67 24.17 24.17
PROGRESS KUMULATIF RENCANA MINGGUAN - 5.04 21.71 45.88 70.06
PROGRES AKTUAL MINGGUAN - - - -
PROGRESS KUMULATIF AKTUAL MINGGUAN - - - - -
DEVIASI (+-)
JADWAL PELAKSANAAN PEKERJAAN 60 HARI KALENDER
MINGGUAN
5 6 7 8 9
28 - 04 05 - 11 12 - 18 19 - 25 26 - 30

100 100

PROGRESS
RENCANA
90
90

80 80

70 70

10.02 4.08 60
60

50 50

2.16
40
1.29 40
40
40

30
30
0.20
0.73 20
20
0.05
0.19
10 10
2.70 2.70
2.92 2.92
0
0

13.46 1.17 5.62 5.62 4.08


83.52 84.69 90.31 95.92 100.00
- - - - -
- - - - -
KEGIATAN : PROGRAM KEGIATAN PADAT KARYA
TAHUN : 2018
PEKERJAAN : PEMBANGUNAN BOX CULVERT
LOKASI : TELUK MERBAU
PANJANG : 7
LEBAR : 1.5

NO URAIAN PEKERJAAN VOLUME SAT ( Rp ) HARGA SATUAN BOBOT


(Rp) (%)
1 2 3 4 5 6=3x5 7

I PEKERJAAN PENDAHULUAN
1 Papan Nama Kegiatan 1.00 Ls 330,000.00 330,000.00 0.64

330,000.00 0.64
II BAHAN BAHAN

1 Pasir Cor 6.00 M3 330,000.00 1,980,000.00 3.85

2 Semen PC 50 Kg 64.00 Sak 74,800.00 4,787,200.00 9.31

3 Kerikil 8.00 M3 352,000.00 2,816,000.00 5.48


4 Paku 3.00 Kg 19,800.00 59,400.00 0.12
5 Kawat Ikat 28.00 Kg 20,000.00 560,000.00 1.09

6 Besi Polos U24 diameter 14 118.00 Btg 160,000.00 18,880,000.00 36.72


7 Kayu Kelas III 2.00 M3 1,980,000.00 3,960,000.00 7.70

8 Triplek 9mm 18.00 Lbr 135,000.00 2,430,000.00 4.73


9 Kayu Cerucuk dia 10-15 cm 54.00 Btg 15,000.00 810,000.00 1.58

10 Tanah Timbun 15.00 M3 110,000.00 1,650,000.00 3.21

11 Alat Bantu 1.00 Ls 115,375.00 115,375.00 0.22

38,047,975.00 74.00

III UPAH
1 Mandor 1.00 orang 127,200.00 706,914.00 1.37

2 Kepala Tukang 1.00 orang 127,200.00 378,811.00 0.74

3 Tukang 2.00 orang 116,600.00 2,964,019.00 5.77

4 Pekerja 13.00 orang 106,000.00 6,755,192.00 13.14

5 Honor Tenaga Teknis Kegiatan 1.00 Org 1,000,000.00 1,000,000.00 1.95


6 Honor Tim TPK 1.00 oRG 570,000.00 570,000.00 1.11

12,374,936.00 24.07

II SEWA PERALATAN

1 ###
Conrete Mixer 1.00 Bh 300,000.00 541,250.00 1.05

2 Stamper 1.00 Bh 200,000.00 119,070.00 0.23

PROGRESS RENCANA MINGGUAN JUMLAH Rp 51,413,231.00 100.00

PROGRESS KUMULATIF RENCANA MINGGUAN -


PROGRESS AKTUAL MINGGUAN -
PROGRESS KUMULATIF AKTUAL MINGGUAN - -
DEVIASI PROGRESS MINGGUAN -
JADWAL PELAKSANAAN KEGIATAN

JADWAL PELAKSANAAN PEKERJAAN 60 HARI KALENDER


MINGGU
1 2 3 4 5 6 7
1-6 7-13 14-20 21-27 28 - 04 05 - 11 12 - 18

0.64
PROGRESS RENCANA

1.28 1.28 1.28

3.10 3.10 3.10

1.83 1.83 1.83


0.06 0.06
0.54 0.54

18.36 18.36
3.85 3.85

2.36 2.36
1.58

0.07 0.07 0.07

0.15 0.15 0.15 0.15 0.15 0.15 0.15

0.08 0.08 0.08 0.08 0.08 0.08 0.08

0.64 0.64 0.64 0.64 0.64 0.64 0.64

1.46 1.46 1.46 1.46 1.46 1.46 1.46

1.95

0.35 0.35

6.50 33.73 33.80 8.97 2.76 2.34 2.34

6.50 40.22 74.02 83.00 85.76 88.09 90.43


ERJAAN 60 HARI KALENDER
GGU
8 9
19 - 25 26 - 30

100
100

90 90

80 80

70 70

60
70

60 60

3.21
50 50

40 40

0.15 0.15

0.08 0.08
30
30

0.64 0.64

1.46 1.46
20 20

1.11

10 10

0.35

0.23
0 0

2.69 6.88

93.12 100.00