d.) Brick tiles veneer ……………………… P100.00/sq.

e.) Mactan stone ………………………. P 130.00/sq.m

f .) Adobe rubble ………………………. P 150.00/sq.m

g.) Synthetic adobe ………………………. P 100.00/sq.m

h.) Anay design plaster finish ………………. P 40.00/sq.m

i.) Pebble wash-out:


1. Black ………………………… P 100.00/sq.m
2. White ………………………… P 140.00/sq.m
3. Boracay ………………………… P 160.00/sq.m

j.) Narra for double walling ………………… P 310.00/sq.m

k.) Yakal for double walling ………………… P 240.00/sq.m

l.) Plywood for double walling:


1. Ordinary ¼” thick ………………… p 80.00/sq.m
2. Marine ¼” thick ……………………. P 100.00/sq.m
3. Danarra ………………………… P 100.00/sq.m

m.) Imported papers for walling ……………… P 270.00/sq.m

NOTE: Other wall finishes - refer to flooring values

11. Special Panel:

a.) Glass with wooden frame ………………… P 480.00/sq.m


b.) Glass with aluminum frame ……………… P 600.00/sq.m

12. Ceiling: below concrete floor:

a.) Ordinary plywood ………………… P 100.00/sq.m


b.) Luminous ceiling ………………… P 300.00/sq.m
c.) Acoustic board ………………… P 260.00/sq.m
d.) Special finish (fiberglass, etc) ……………. P 450.00/sq.m

13. Foundation: more than 3-storey buildings

a.) Type I …………………. Foundation area x P 100.00 x # of excess floors

b.) Type II …………………. Foundation area x P 80.00 x # of excess floors

c.) Piles …………………. P 300.00 per lineal meter of pile driven

14. Painting – if the building is not painted deduct 5% of the basic rate

15. Second hand materials – if the building has used second hand materials deduct 5-10%

16. Extra Toilet & Bath:


For One-family dwelling only …………………………. P15,000.00

17. Bath Tub:


For One-family dwelling only ………………………….. P 6,500.00

18. Tegula or Ondula roofing:


When instead of:
a.) reinforced concrete …………………………… Add P 120.00/sq.m
b.) color steel roofing …………………………… Add P 240.00/sq.m
c.) corrugated GI sheets …………………………… Add P 340.00/sq.m

1) (6”) thk. CHB without plaster:


1. One face plastered …………………… 480.00/sq.m
2. Two face plastered ……………………. 530.00/sq.m
k.) (6”) thk. CHB sandblast finish ……………………. 580.00/sq.m
l.) (6”) thk. Mactan stone finish ……………………. 620.00/sq.m
m.) (6”) thk. Fire bricks finish ……………………. 690.00/sq.m

n.) (6”) thk.peeble washout finish ……………. 550.00/sq.m


o.) Cyclone wire w/ GI pipe frame ……………. 300.00/sq.m
p.) Wire mesh (chicken, hog wires, etc.):
1. Attached to GI pipe post ……………………. 100.00/sq.m
2. Attached to wooden post ……………………. 80.00/sq.m
q.) Welded wire attached to wooden post ……………. 90.00/sq.m
r.) Wrought iron bars (round, flat., etc.) ……………. 450.00/sq.m
s.) GI sheets attached to wooden post ……………. 230.00/sq.m
t.) Flatten sheets attacfhed to wooden post ……………. 200.00/sq.m
u.) Wood slate ……………………………………. 160.00/sq.m
v.) Coco lumber (including bark) …………………….. 110.00/sq.m
w.) Bamboo slate …………………………………….. 110.00/sq.m

SCHEDULE OF VALUES FOR GATES

1. Wrought iron bars ( round, flat, twisted etc.) ……... 450.00/sq.m

2. Steel plate ……………………………………... 550.00/sq.m

3. Cyclone wire attached to GI pipes ……………… 390.00/sq.m

4. Wire mesh (chicken, hog, screen) ……………… 120.00/sq.m.

5. Welded wire ……………………………………… 110.00/sq.m

6. Wood slate ……………………………………… 190.00/sq.m

7. Bamboo slate ……………………………………… 130.00/sq.m

SCHEDULE OF TANKS

A.) Fiberglass reinforced plastic (eg. ANACO, etc.)

500 liters …………….. P 5, 160.00


750 liters …………….. 6, 480.00
1,000 liters ……………. 8, 160.00
2,000 liters ……………. 12, 960.00
3,000 liters ……………. 18, 600.00
5,000 liters …………….. 32, 800.00
10,000 liters …………….. 64, 800.00

B.) Reinforced concrete:

6.0 cu.m. or more …………….. P 2,000/cu.m


50.0 cu.m. or less …………….. 2,000/cu.m
plus P 350.00 in excess of 5.0 cu.m.

50.0 cu.m. or more 18,000/c.u.m.


plus P 400.00 per c.u.m. in excess of 50.0 cu.m.

C.) Steel plate (cylindrical large tanks, as oil storage)

Cost ……………….. P 450.00 sq.m./m.height


Or ……………….. 450.00/cu.m.
Or ……………….. 5,300.00/m.dis./m.height

NOTE: 1 cubic meter = 1, 000 liters


Riprap = 450