Professional Documents
Culture Documents
BLDG Base Specifications
BLDG Base Specifications
14. Painting – if the building is not painted deduct 5% of the basic rate
15. Second hand materials – if the building has used second hand materials deduct 5-10%
SCHEDULE OF TANKS