Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

0 5 10 25

SCALE BAR 1:250

TOUREEN GROUP OUTLINE OF


STRUCTURES AT 785
TO BE DEMOLISHED
TEMPORARY WELFARE
DURING DEMOLITION Nos. No. 785
No. 777 779-783

Nos.
769-775

GATE 4 1
3 GAT
GATE
0%
E 5
n route
pedestria

2
GATE ROUTE
TFL RED
GATE
11 LORRIES

0%

UTE
FTA Design Rigid Vehicle (1983) 1 1
D RO
HOARDING TO REMAIN ON
BOUNDARY LINE DURING T FL RE 1 65%
DEMOLITION PHASE

E
D ROUT
TFL RE

0%
(1983)
FTA Design Rigid Vehicle

LORRIES DRIVE IN AND ACCESS FOR BANKSMAN IN STREET SIGN DROP KERB CROWD CONTROL LORRIES REVERSE IN
OUT REFURBISHMENT ATTENDANCE RELOCATED TEMPORARILY ADAPTED BARRIERS THEN DRIVE BACK OUT

AERIAL VIEW OF THE SITE


FOOTPATH TO REMAIN OPEN DURING
DEMOLITION PHASE WITH ACCESS GATES
CONTROLLED BY TRAFFIC/PEDESTRIAN
MARSHAL. CROSSING POINTS CONTROLLED
USING CROWD BARRIERS 01 FIRST ISSUE BM 01/10/2019

INFORMATION

10
Toureen Group
25 Cecil Road
Harrow
Middlesex HA3 5QY
Tel: 020 8424 7999
1.3 6.2
www.toureenmangan.co.uk

FTA Design Rigid Vehicle (1983) -


Overall Length 10.000m -
Overall Width 2.500m -
Overall Body Height 3.632m -
Min Body Ground Clearance 0.427m
Track Width 2.500m
Lock to lock time 4.00s -
Kerb to Kerb Turning Radius 12.000m -
-
-

Sailmakers
VEHICLE PROFILE
WELFARE AND TRAFFIC/DELIVERY 767-775 Commercial Road
WELFARE AND TRAFFIC PLAN
LOGISTICS PLAN DURING DURING DEMOLITION
DEMOLITION PHASE 1:250 01/10/2019 BM IF

T 101
T6004-TOU-TW-00-DR-Y-0000 T1