Toureen Group: Stage3 - Piling + Underpinning

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

STAGE3 - PILING + GENERAL NOTES:

1. ALL DIMENSIONS ARE IN MILLIMETERS

UNDERPINNING INSTALL TRENCH SHEETS TO ALLOW


(mm) UNLESS NOTED OTHERWISE. ALL
DIMENSIONS MUST BE CHECKED ON SITE AND
COMPLETE REMOVAL OF EXISTING ANY DISCREPANCY BROUGHT TO THE
FOUNDATIONS WITHOUT UNDERMINING ATTENTION OF THE DESIGNER
TOW PATH
2. THIS DRAWING IS TO BE READ IN
CONJUNCTION WITH RELEVANT ARCHITECT &
STRUCTURAL ENGINEERS DRAWINGS AND
SPECIFICATIONS.

UNDERPIN EXISTING WALLS AS


PER SE DRAWINGS

U P
LOW LEVEL
PILING MAT

R O
G
INSTALL TRENCH SHEETS TO ALLOW
COMPLETE REMOVAL OF EXISTING
FOUNDATIONS WITHOUT UNDERMINING
785 NEXT DOOR LANDSCAPE
HIGH LEVEL
PILING MAT

779 - 783
777

N
769 - 775

INSTALL TEMPORARY PILES


INSTALL PILING MAT TO PICK UP WALL UNTIL NEW
FOUNDATIONS ARE BUILT

HIGH LEVEL

E E GATE 4
GATE 5
INSTALL PLUNGE COLUMNS
IN PERMANENT PILES FOR
TOP DOWN SLAB

R
PILING MAT
ATE3
G
CREATE TEMPORARY
OPENING AT GROUND FLOOR
FOR PILING RIG
SMALL RIG REQUIRED FOR
AT E2 RESTRICTED HEADROOM

U
PILING
PILES IN THE CORNER G
767

1
GATE INSTALL PROPPING FRAME
FOR PILES IN FRONT OF No.
777

O
PILES INSTALLED FROM T1 FIRST ISSUE BM 03/10/2019
HIGH LEVEL, BEFORE
PROPPING FRAME IS
INSTALL CONTIGUOUS PILES INSTALLED.
PILES DESIGNED TO INFORMATION

T
CANTILEVER ALONG
COMMERCIAL RD.
EXISTING WALL REMOVED TO
ENABLE PILING
INSTALL TEMPORARY LAY-BY Toureen Group
25 Cecil Road
Harrow
Middlesex HA3 5QY
Tel: 020 8424 7999
www.toureenmangan.co.uk

-
-
-
-

-
-
-
-

Sailmakers
767-775 Commercial Road
STAGE 3

1:200 03/10/2019 BM IF

T 101
T6004-TOU-TW-00-DR-Y-0004 T1