Toureen Group: Stage3 - Piling + Underpinning
Toureen Group: Stage3 - Piling + Underpinning
Toureen Group: Stage3 - Piling + Underpinning
U P
LOW LEVEL
PILING MAT
R O
G
INSTALL TRENCH SHEETS TO ALLOW
COMPLETE REMOVAL OF EXISTING
FOUNDATIONS WITHOUT UNDERMINING
785 NEXT DOOR LANDSCAPE
HIGH LEVEL
PILING MAT
779 - 783
777
N
769 - 775
HIGH LEVEL
E E GATE 4
GATE 5
INSTALL PLUNGE COLUMNS
IN PERMANENT PILES FOR
TOP DOWN SLAB
R
PILING MAT
ATE3
G
CREATE TEMPORARY
OPENING AT GROUND FLOOR
FOR PILING RIG
SMALL RIG REQUIRED FOR
AT E2 RESTRICTED HEADROOM
U
PILING
PILES IN THE CORNER G
767
1
GATE INSTALL PROPPING FRAME
FOR PILES IN FRONT OF No.
777
O
PILES INSTALLED FROM T1 FIRST ISSUE BM 03/10/2019
HIGH LEVEL, BEFORE
PROPPING FRAME IS
INSTALL CONTIGUOUS PILES INSTALLED.
PILES DESIGNED TO INFORMATION
T
CANTILEVER ALONG
COMMERCIAL RD.
EXISTING WALL REMOVED TO
ENABLE PILING
INSTALL TEMPORARY LAY-BY Toureen Group
25 Cecil Road
Harrow
Middlesex HA3 5QY
Tel: 020 8424 7999
www.toureenmangan.co.uk
-
-
-
-
-
-
-
-
Sailmakers
767-775 Commercial Road
STAGE 3
1:200 03/10/2019 BM IF
T 101
T6004-TOU-TW-00-DR-Y-0004 T1