Objective Scope: Method Statement of Wet Mix Macadam
Objective Scope: Method Statement of Wet Mix Macadam
MACADAM
CA NO: CE(AF)/G/JAM/39 OF 2018-2019
NAME OF CONTRACTOR: KCC BUILDCON PVT LTD
Objective
To provide and supervise the construction of wet mix macadam layer.
Scope
Scope covers preparation of mix, transportation, laying and compaction to
required grade, line and level over granular sub-base.
References
Specification & Procedures stipulated in the Contract Agreement.
Approved Drawings supplied by the Engineer.
Equipment
WMM Plant 01
Tippers 02
Mechanical Paver 01
Tandem Vibratory Roller 01
String line/ Wire
Manpower
Engineer -1
Supervisor -1
Paver Operators -1
Helpers 02
Labour as per Requirement.
Trail Bay
A trail bay of 30mx10.6m to be constructed at location as approved by
PMG in presence of GE.
The material Sampling and testing will be done as per CA mention at site
lab.
In case density achieved after final compaction is less than 98% of MDD
the layer is re compacted to achieve the required density.