CLIENT ; ALSTOM QCP N° : SGB003

PLANT LOCATION : Unit 2 Turbine Hall CODE QC RAPPORT n°

CF 0050209 1
PROJECT TITLE ; Construction of Masonry walls REFERENCE DE L’ITPL
Form 006

INSPECTION REPORT OF CONCRETE

TAG/ITEM ENGINEERING DOC N° SUPPLIER DOC N° CODE/SPÉCIFICATION


SANS 1200
KUS/16/M/UMA—B638A/CF/005
SANS 10400-1990-2

IDENTIFICATION OF MONITORING AND MEASUREMENT DEVICES PAGE OF


Check the correct
Check the correct execution of
surface preparation
concrete pouring, including slopes
ITEM LOCATION before concrete casting
PAS
FAIL REMARKS PASS FAIL REMARKS
S

NOTES
RÉF. NOTIFICATION

RFI No.
PREPARED BY : K. CHIGWIDA
ISSUE DATE :
SGB ENGINEERING
ALSTOM
SERVICES
NAME NAME NAME NAME

SIGNATURE SIGNATURE SIGNATURE SIGNATURE

Date Date Date Date


Form reference : form006