Proyek: Rumah 1 Unit Lokasi: Indonesia: Rencana Anggaran Biaya (RAB)
Proyek: Rumah 1 Unit Lokasi: Indonesia: Rencana Anggaran Biaya (RAB)
proyeksipil.blogspot.com
BOBOT
[%]
0.00
Juli 2014
ogspot.com
No. Activity Value [Rp.]
Amount
BOBOT
NO Activity Value
(RP.) (%)
A Preliminaries 100,000,000.00 4.55
B Foundation 500,000,000.00 22.73
C Structure 400,000,000.00 18.18
D Shell 400,000,000.00 18.18
E Electrical 100,000,000.00 4.55
F Sanitery 200,000,000.00 9.09
G Exteriors 100,000,000.00 4.55
H Interiors 200,000,000.00 9.09
I Finishing 200,000,000.00 9.09
JUMLAH = 2,200,000,000.00 100.00
Amount WAKT
BOBOT
NO Activity Value MARET 2017
(RP.) (%) 1 2 3
A Preliminaries 100,000,000.00 4.55 2.27 2.27
7.58 7.58
7.58 12.12 9.85 9.85 11.72 8.99 4.44 4.44 5.50 5.50 3.69 2.39 1.82
19.70 31.82 41.67 51.52 63.23 72.22 76.66 81.10 86.61 92.11 95.80 98.18 100.0
Amount WAKT
BOBOT
NO Activity Value MARET 2017
(RP.) (%) 1 2 3
A Preliminaries 100,000,000.00 4.55 2.27 2.27
7.58 7.58
80
4.55 4.55 4.55 4.55
7.58 12.12 9.85 9.85 11.72 8.99 4.44 4.44 5.50 5.50 3.69 2.39 1.82
19.70 31.82 41.67 51.52 63.23 72.22 76.66 81.10 86.61 92.11 95.80 98.18 100.0