Professional Documents
Culture Documents
Letter From Chairman To Railway Board Chairman
Letter From Chairman To Railway Board Chairman
} ll x 1 u1 • - t1 • i �
� -;,!� � . � � 11'1 -.r
-s11i � 3ft, � �
3l'UllH N a t i o n a l H i g h w a y s Authority of I n d i a
Ministry of Road Transport & Highways
N A G E N D R A NATH S I N H A , 1 A s .
NHAI, G·5&6, Sector-10, Dwarka, New Dethi-110075
CHAIRMAN
Tcl:+91-11-25076503, Fax:+91-11·25093605, E:chairman@nhai.org
DO No. N H A I / B M / D e l h i - V a d o d a r a / 2 0 1 8 / i3 7 3 s o
J u l y 2nd, 2 0 1 9
� .IM · Y�,
final stages and Civil Work Contracts have been either awarded or under process in
Haryana, Rajasthan and Gujarat. While fixing the alignment, efforts had been
However, these could not be avoided at all locations and the alignments of these
Greenfield Corridors cross the existing Railway lines at 21 locations where Road
Over Bridges (ROBs) had been proposed. NHAl's Field Units/ Consultants are in
GADs for the proposed RoBs. The list of 21 Railway crossings and the status of
approval of GADs for the proposed RoBs is enclosed with this letter.
3. In order to start the civil works under this flagship programme of the
4. You would appreciate that approval of GADs of the RoBs normally takes 4 to
6 months, as these are being routinely done. However, considering that these
Greenfield Corridors being the projects of national importance, I request you to put
2019. Instructions may kindly be issued to your field formations directing them to
the same.
(Nagendra Nath S i n h a )
Raisina Road,
New D e l h i - 1 1 0 0 0 1
E m a i l : crb@rb.railnet.gov.in
Details of railway crossing GADs pending with Railways Divisions and Zones
1. Delhi-Vadodara
Shivagarh-
• GAD submitted to Division on 22-Apr
Madhya Banswara Ratlam I
9 626+058 • GAD approved by Division • Jaipur CBE approval
Pradesh Rly Km. 175/200- Jaipur
• GAD sent to Zone for approval
400
SMLA-TBA
• GAD submitted to Division on 29- • Vadodara Division
Narrow Gauge Vadodara
11 Gujarat 826+984 May approval
Section I Mumbai
• Division verification of GAD ongoing • Mumbai CBE approval
RI Km. 49/6-7
2. Amritsar-Jamnagar
/806m on oin
Rewari-
• GAD reviewed in Zone and
Sadulpur • Bikaner Division
Bikaner I sent to Division in Mar-2019
6 Haryana Rly Ch. 201+480 approval
Jaipur • Division verification of GAD
124km I • Jaipur CBE approval
ongoing
950m