3l'UllH N a t i o n a l H i g h w a y s Authority of I n d i a
Ministry of Road Transport & Highways
N A G E N D R A NATH S I N H A , 1 A s .
NHAI, G·5&6, Sector-10, Dwarka, New Dethi-110075
CHAIRMAN
Tcl:+91-11-25076503, Fax:+91-11·25093605, E:chairman@nhai.org

DO No. N H A I / B M / D e l h i - V a d o d a r a / 2 0 1 8 / i3 7 3 s o

J u l y 2nd, 2 0 1 9

� .IM · Y�,

As you may be kindly aware, NHAI had taken up development of Delhi­

Vadodara Expressway; Amritsar-Jamnagar Economic Corridor & Ambala-Kotputli

National Corridor on Greenfield Alignment of about 1350km, 760km & 230km

respectively. The process of acquisition of land for these Greenfield Corridors is in

final stages and Civil Work Contracts have been either awarded or under process in

phase-wise manner. The construction on these Greenfield Corridors is expected to

commence in August/ Sept., 2 0 1 9 .

2. The alignments of these Greenfield Corridors pass through the States of

Haryana, Rajasthan and Gujarat. While fixing the alignment, efforts had been

made to minimize the impact on existing habitations and physical infrastructure.

However, these could not be avoided at all locations and the alignments of these

Greenfield Corridors cross the existing Railway lines at 21 locations where Road

Over Bridges (ROBs) had been proposed. NHAl's Field Units/ Consultants are in

touch with concerned Division/Zonal Office of Railways for necessary approval of

GADs for the proposed RoBs. The list of 21 Railway crossings and the status of

approval of GADs for the proposed RoBs is enclosed with this letter.

3. In order to start the civil works under this flagship programme of the

Government (Bharatmala Programme) in August/Sept., 2019, approval of GADs of

21 RoBs need to be expedited by the Railways.

4. You would appreciate that approval of GADs of the RoBs normally takes 4 to

6 months, as these are being routinely done. However, considering that these

Greenfield Corridors being the projects of national importance, I request you to put

in place a mechanism for monitoring the approval of 21 GADs of RoBs by Sept.,

2019. Instructions may kindly be issued to your field formations directing them to

take up these works on top priority.

5. Your co-operation in expediting the approval of 21 GADs would go a long way

in construction of India's longest Greenfield Expressway Corridors and we solicit

the same.

w , \-+, �'Tl r�-


Yours sincerely,

Encl.: List of 21 Railway Crossings where ROBs proposed.

(Nagendra Nath S i n h a )

S h . Vinod Kumar Yadav

Chairman, Railway Board

Room No. 234, Rail Bhavan,

Raisina Road,

New D e l h i - 1 1 0 0 0 1

E m a i l : crb@rb.railnet.gov.in
Details of railway crossing GADs pending with Railways Divisions and Zones

1. Delhi-Vadodara

• GAD reviewed in Zone and • Agra Division approva


Govindgarh-Jadoli Agra I
Rajasthan 94+305 forwarded to Division on 16-May • Allahabad CBE
Rly Km. 1484 Allahabad
• Division verification of GAD on oin

• GAD reviewed in Zone and • Agra Division approva


Bandikui-Biwai Agra I
2 Rajasthan 149+942 forwarded to Division on 16-May • Allahabad CBE
Rly Km. 139.4 Allahabad
• Division verification of GAD on oin a roval

• GAD upload by Dausa


• Discussed with Railways on 28-May
Dausa-Gangapur Division
Dausa I • Link for GAD upload not opening due
3 Rajasthan City 212+343 • Dausa Division
Jaipur to MoU issue over greenfield
Rly Km. 1 3 7 . 1 approval
corridors
• Jaipur CBE ap roval

Devpura- • Discussed with Railways on 28-May • Jaipur Division


Jaipur I
4 Rajasthan SawaiMadhopur 284+248 • GAD to be resubmitted to Division approval
Jaipur
Rly Km. 10.2 after observations from Zone • Jai ur CBE a proval

• Kata Division approval


Kota-Mathura Kata I • GAD submitted to Division on 1-May
5 Rajasthan 314+023 • Jabalpur CBE
Rly Km. 997.5 Jabalpur • Division verification of GAD ongoing
a roval

Kota-Ruthiyai • GAD submitted to Division on 25- • Kata Division approval


Kata I
6 Rajasthan Section 383+016 May • Jabalpur CBE
Jabalpur
Rly Km. 23.096 • Division verification of GAD on oin a roval

Nagda-Kota • GAD submitted to Division in Jan- • Kata Division approval


Kata I
7 Rajasthan Section 415+648 2019 • Jabalpur CBE
Jabalpur
Rly Km. 884. 209 • Division verification of GAD ongoing approval

Berach Jn. Cabin- • Ratlam Division


Madhya Ratlam I • GAD submitted to Division on 3-May
8 Ratlam 595+828 approval
Pradesh Mumbai • Division verification of GAD ongoing
Rly Km. 351/4-8 • Mumbai CBE a proval

Shivagarh-
• GAD submitted to Division on 22-Apr
Madhya Banswara Ratlam I
9 626+058 • GAD approved by Division • Jaipur CBE approval
Pradesh Rly Km. 175/200- Jaipur
• GAD sent to Zone for approval
400

• GAD submitted to Division on 17 - • Vadodara Division


Timba-Godhra Vadodara
10 Gujarat 782+387 May approval
Rly Km. 74.865 I Mumbai
• Division verification of GAD ongoing • Mumbai CBE approval

SMLA-TBA
• GAD submitted to Division on 29- • Vadodara Division
Narrow Gauge Vadodara
11 Gujarat 826+984 May approval
Section I Mumbai
• Division verification of GAD ongoing • Mumbai CBE approval
RI Km. 49/6-7
2. Amritsar-Jamnagar

• GAD uploaded on 10-May • GAD forward from CBE


Hanumangarh-
• CBE scrutiny of GAD post to Division
Suratpura Bikaner I
Rajasthan 26+640 upload ongoing • Bikaner Division
Rly Ch. 8km I Jaipur
• GAD forward from CBE to approval
933m
Division end in • Jai ur CBE a proval

• GAD uploaded on 10-May • GAD forward from CBE


Ratangarh-
• CBE scrutiny of GAD post to Division
Bikaner Bikaner I
2 Rajasthan 222+487 upload ongoing • Bikaner Division
Rly Ch. 439km/ Jaipur
• GAD forward from CBE to approval
700m
Division endin • Jai ur CBE approval

• GAD uploaded on 10-May • GAD forward from CBE


Bikaner-Merta
• CBE scrutiny of GAD post to Division
Road Jodhpur I
3 Rajas than 250+261 upload ongoing • Bikaner Division
Rly Ch. 497km I Jaipur
• GAD forward from CBE to approval
731m
Division end in • Jai ur CBE approval
3. Ambala-Kotputli

• GAD reviewed in Zone and


Rohtak-Jind
Delhi I sent to Division on 29-Dec • Delhi Division approval
Haryana Rly Ch. 97km 110+868
Delhi • Division verification of GAD • Delhi CBE approval
/ 233m
on oin

Kurukshetra- • GAD reviewed in Zone and

Narwana Delhi I sent to Division on 29-Dec • Delhi Division approval


2 Haryana 18+236
Rly Ch. 63km Delhi • Division verification of GAD • Delhi CBE approval

/806m on oin

• GAD reviewed in Zone and


Jind-Panipat
Delhi I sent to Division on 29-Dec • Delhi Division approval
3 Haryana Rly Ch. 20km 80+941
Delhi • Division verification of GAD • Delhi CBE approval
/ 500m
on oin

• GAD reviewed in Zone and


Jind-Panipat
Delhi I sent to Division on 29-Dec • Delhi Division approval
4 Haryana Rly Ch. 20km 89+540
Delhi • Division verification of GAD • Delhi CBE approval
/200m
on oin

Bhiwani- • GAD reviewed in Zone and


• Bikaner Division
Rohtak Bikaner I sent to Division on 1 1 - F e b
5 Haryana 140+351 approval
Rly Ch. 24km Jaipur • Division verification of GAD
• Jaipur CBE approval
/ 100m on oin

Rewari-
• GAD reviewed in Zone and
Sadulpur • Bikaner Division
Bikaner I sent to Division in Mar-2019
6 Haryana Rly Ch. 201+480 approval
Jaipur • Division verification of GAD
124km I • Jaipur CBE approval
ongoing
950m

Rewari- • GAD reviewed in Zone and


• Bikaner Division
Bhiwani Bikaner I sent to Division on 1 1 - F e b
7 Haryana 168+830 approval
Rly Ch. 53km Jaipur • Division verification of GAD
• Jaipur CBE approval
/ 700m on oin