NONCONFORMITY REPORT for Gonstruction (NCR)
SADARA MFC Project
NCR NO. NCR-SEN-EL-OOz DATE 22.NOV.2013
ITWAS OBSERVED THAT THE SUB-CONTRACTOR SENDAN, HAD ALREADY STARTED THE WORK OF CABLE
PUILII.IO FOR FIREALARM SYSTEM AT SUBSTATION G-1121( DCS ROOM), W]TTOUT.IHE INSPECTION OF
lrE loWrn ponrtoru or rHE coNDUtr INSTALLATIoN (DRoP-our coNDUlr). THls ls A vloLATloN oF
'v SCHED. Q SEC.1.6,SCHED. Q- ATT.IV,SEC.1.1.3 & SMITP-P-10+06.