GROSS FLOOR AREA

Project : PENYUSUNAN DED GEDUNG KANTOR BPMPTSP KOTA PADANG


Taker off : Ihsan Rohmatullah
Drawing Date :
Drawing No :

p l t
D1 D2 D3 SubTotal Conversion Tm1 Tm2

21.60 15.60 336.96 1 1


9.33 3.00 27.99 1 1
3.60 3.02 10.87 1 1
14.40 4.78 68.83 1 1
4.60 4.60 21.16 1 1
14.40 7.20 103.68 1 1
7.80 7.20 56.16 1 8
7.20 7.20 51.84 1 1
10.80 3.02 32.62 1 1
4.50 4.79 21.56 1 1
1.51 1.43 1.08 0.5 1
7.85 3.85 15.11 1 1

5.20 4.00 20.80 1 1


2.00 4.00 8.00 1 1
3.60 4.00 14.40 1 1
3.60 4.00 14.40 1 1
3.20 5.20 16.64 1 1
6.80 8.00 54.40 1 1
4.80 5.20 24.96 1 1
2.00 4.80 9.60 1 1
4.40 7.20 31.68 1 1
7.20 6.00 43.20 1 1
1.05 2.00 2.10 1 1
3.50 3.50 12.25 1 1
4.13 1.05 4.34 1 1
2.40 3.60 8.64 1 1
2.40 4.48 10.75 1 4
14.40 14.40 207.36 1 1
7.20 7.20 51.84 1 1
3.60 3.56 6.41 1 1
7.20 6.00 43.20 1 1
4.40 7.20 31.68 1 1
4.00 5.20 20.80 1 1
4.00 5.20 20.80 1 1
3.20 5.20 16.64 1 1
2.00 15.00 30.00 1 1
3.60 3.00 10.80 1 2
7.80 7.80 60.84 1 1
4.80 7.80 37.44 1 1
3.60 2.40 8.64 1 2
1.05 2.40 2.52 1 1
1.05 2.40 2.52 1 1
3.60 3.60 12.96 1 1
2.40 2.40 5.76 1 1
4.95 2.00 9.90 1 1
7.20 4.80 34.56 1 1
6.00 5.20 31.20 1 1
1.50 5.20 7.80 1 1
2.00 12.00 24.00 1 1
5.20 2.50 13.00 1 1
5.20 2.00 10.40 1 1
4.00 5.20 20.80 1 1

7.20 3.20 23.04 1 1


3.60 3.20 11.52 1 2
5.20 4.00 20.80 1 1
4.00 5.20 20.80 1 1
7.80 9.20 71.76 1 1
7.20 4.40 31.68 1 1
4.80 2.15 10.32 1 1
4.80 5.05 24.24 1 1
2.40 1.35 3.24 1 1
2.40 1.05 2.52 1 1
1.20 3.69 4.43 1 1
3.60 3.60 12.96 1 1
2.40 2.15 5.16 1 1
2.40 3.33 7.99 1 1
1.20 1.62 1.94 1 4
7.20 12.41 89.35 1 1
4.08 5.21 21.26 1 1
4.08 5.20 21.22 1 1
4.08 2.00 8.16 1 1
3.00 3.57 10.71 1 2
7.25 7.21 52.27 1 1
7.19 7.33 52.70 1 1
3.15 3.13 9.86 1 2
2.00 4.13 8.26 1 1
5.33 4.00 21.32 1 1
5.20 4.15 21.58 1 1
5.20 3.33 17.32 1 1
2.48 1.35 3.35 1 1
1.20 2.48 2.98 1 1
3.35 2.48 8.31 1 1
2.15 2.53 5.44 1 1
1.40 1.52 2.13 1 4
3.55 3.56 12.64 1 1
3.47 1.05 3.64 1 1
7.28 3.60 26.21 1 1
1.20 4.15 4.98 1 2
1.20 1.51 1.81 1 2
5.20 4.00 20.80 1 1
5.20 4.00 20.80 1 1
5.20 4.00 20.80 1 1
5.20 3.20 16.64 1 1
15.60 2.00 31.20 1 1
10.80 7.80 84.24 1 1
3.00 5.34 16.02 1 1
6.00 8.94 53.64 1 1
3.00 4.00 12.00 1 1
6.00 5.60 33.60 1 1
3.95 2.00 7.90 1 1
2.05 2.00 4.10 1 1
0.88 4.93 4.34 1 12
0.75 2.55 1.91 1 1
0.88 4.93 4.34 1 7
0.75 2.48 1.86 1 1
7.20 7.80 56.16 1 1
7.8 7.2 56.16 1 1
OOR AREA

P KOTA PADANG

m2
Annotation Total

Ground Floor Lantai Dasar


Lantai Dasar E-G, 4-7 336.96
Ruang Pompa 27.99
Ruang Genset 10.87
Lantai Dasar F'-f, 2-4 68.83
Ruang Securiry 21.16
Lantai Dasar D-F, 1-2 103.68
Lantai Dasar A-F, 1-3 449.28
Lantai Dasar E-F, 3-4 51.84
Lantai Dasar F'-G, 2-4 32.62

Lantai Dasar Sekitar Security 22.63

Lantai Dasar diSamping Ruang Pompa 15.11


Ground Floor Lantai 1
Ruang Rapat Kecil 20.80
Ruang Simpan 8.00
R. Keuangan 14.40
Kasubag Perencana dan TEK 14.40
kasubag umum 16.64
sekretariat 54.40
Ruang arsip 24.96
Ruang server 9.60
Ruang disamping server 31.68
Ruang tangga 43.20
Ruang panel PABX 2.10
Ruang diatas r. Panel PABX 12.25
Lorong wc1 4.34
wc 1 8.64
wc 2 43.01
Ruang pendidikan , dll 207.36
Ruang laktasi, dll 51.84
Loby 6.41
Ruang tangga 2 43.20
Ruang kosong 31.68
Ruang kabid 20.80
Ruang rapat kecil 2 20.80
Ruang simpan 37.44
Lorong 17.28
Ruang kasubid 2.52
Ruang bidang perijinan perekonomian 2.52
Cafetaria 12.96
Wc disamping cafetaria & bank 5.76
Pantry 9.90
Janitor 34.56
Ruang kosong samping pantry 31.20
Toilet difabel 7.80
wc dibawah janitor 24.00
bank/ruang pelayanan keuangan 13.00
tempat sholat 10.40
tempat berwudhu 7.80
teras gudang 24.00
ruang gudang 13.00
lorong gudang 10.40
sekretaris 20.80

2st floor
Ruang Simpan 23.04
Kasubbid 23.04
R. Rapat Kecil 20.80
Kabid 20.80
Bidang Perizinan Kesra & Lingkungan 71.76
Ruang Tunggu 31.68
Ruang Server 10.32
Ruang Arsip 24.24
Ruang Panel-PABX 3.24
Janitor 2.52
Ruang A 4.43
Ruang B 12.96
KM 1 5.16
KM 2 7.99
WC 7.78
Ruang Rapat 89.35
Ruang Rapat Kecil 21.26
Kabid 21.22
Ruang Simpan 8.16
Kasubbid Modal & Pengawasan 21.42
Kantor Modal & Pengawasan 52.27
Kantor Perencanaan Data & IT 52.70
Ruang Kasubbid IT 19.72
Ruang Simpan IT 8.26
Ruang Rapat Kecil IT 21.32
Kabid IT 21.58
R. Depan Kabid IT 17.32
Pantry 3.35
Janitor 2.98
KM 1 8.31
KM 2 5.44
WC 8.51
Ruang Samping Pantry 12.64
Ruang Samping KM 2 3.64
Tempat Shalat 26.21
Tempat Wudhu 9.96
Ruang Samping Tempat Wudhu 3.62
Ruang Tunggu Perizinan 20.80
Kabid Perizinan 20.80
R. Rapat Kecil Perizinan 20.80
Ruang Simpan 16.64
Lorong 31.20
Kantor Perizinan 84.24
Ruang Tunggu Kepala Badan 16.02
Ruang Kepala Badan 53.64
Ruang Arsip/Custom 12.00
R. Rapat Kecil 33.60
KM 7.90
Koridor 4.10
Dak AC 1 52.06
Dak AC 2 1.91
Dak 1 30.37
Dak 2 1.86
tangga 1 56.16
tangga 2 56.16

TOTAL 3346.07
ELEMENTAL COST ANALYSIS
Project: PENYUSUNAN DED GEDUNG KANTOR BPMPTSP KOTA PADANG

SUMMARY OF ELEMENT COST


GFA: 3346.07 m2

Cost per m2
Total Cost Of Element
GFA
Rp Rp
1 Substructure
1 Substructure 4,851,039,076.25 1449772.79

Group Element Total 4,851,039,076.25 1449772.79


2 Superstructure
2A Frame 4,178,631,610.33 1248818.31
2B Upper Floors 3,627,448,661.21 1084092.77
2C Roof 892,489,430.78 266727.78
2D Stairs 147,867,672.81 44191.47
2E External Walls 1,398,603,219.05 417984.04
2F External Windows and Doors 742,425,041.04 221879.81
2G Internal Walls and Partitions (included to external walls) 0.00 0.00
2H Internal Doors (included to external windows and door) 0.00 0.00

Group Element Total 10,987,465,635.23 3283694.17


3 Finishes
3A Wall Finishes (include to external walls) 0.00 0.00
3B Floor Finishes 1,005,652,191.69 300547.40
3C Ceiling Finishes 840,301,327.76 251130.94

Group Element Total 1,845,953,519.45 551,678.34

4 Fitting and Furnishings 0.00 0.00


5 Services
5A Sanitary Appliances 56,841,987.35 16987.69
5B Services Equipment - -
5C Disposal Installations - -
5D Water Installations 78,127,000.00 23348.89
5E Heat Source 1,404,353,900.00 419702.67
5F Space Heating and Air Conditioning 1,139,064,400.00 340418.73
5G Ventilating System - -
5H Electrical Installations 4,141,664,464.50 1237770.38
5J Fuel Installation -
5K Fire and Lightning Protection 855,486,950.00 255669.29
5L Communications & Security Installations 475,282,700.00 142042.13
5M Special Installations
5N Builder's Work in Connection
5O Management of the Commissioning - -
of Services (included to each item)

Group Element Total 8,150,821,401.85 2435939.79

Sub-total exc. External Works, 25,835,279,632.78 7721085.10


Preliminaries & Contigencies

6 External Works
6A Site Work 871,390,631.93 260422.23
6B Drainage 0.00 0.00
6C External Services - -
6D Minor BuildingWorks 0.00 0.00
6E Demolition and Work Outside the Site - -

Group Element Total 871,390,631.93 260,422.23


Preliminaries
1,398,953,860.51 418088.83

TOTAL (Less Contigencies) 28,105,624,125.23 8,399,596.16


Tidak sederhana

ST
TENDER DATE: 5-Apr-16

% Cost of Reinforced Reinforce-


Formwork
Element Concrete ment
m3 kg m2

17% 272.65 2,950.92 454.26

17%

15% 372.45 100,686.03 3,567.33


13% 360.20 72,378.82 2,793.23
3%
1% 17.79 3,074.85 177.36
5%
3%
0%
0%

39%

0%
4%
3%

7%

0%

0%
-

0%
5%

15%

20%

92%

3%
0%

0%
3%

5%

100%
Attributes
Location
Function

Gross external floor area


Gross internal floor area
Storeys above ground
Storey below ground
Grade
Hotel grade
Funding
Site topology
Site conditions
Currency
Cost Data
Aia Pacah,Padang
residential | office | commercial | shopping centre | industrial | hotel | car park | warehouse | educational | hospital | airport terminal |
railway station | ferry terminal | mix of the foregoing

3346.07
specific number | 0 - 3 | 4 - 7 | 8 - 20 | 20 - 30 | 30 - 50 | over 50 | house | low rise | medium rise | high rise

ordinary quality | medium quality | high quality


1 star | 2 star | 3 star | 4 star | international + the foregoing | local + the foregoing
private | government
levelled | sloping
soft | rocky | reclaimed (underground rock and cavity)
Rupiah
Dokumen Perencanaan 2016

© ICMS Coalition
Worked examples are reproduced with kind permission of the ICMS Coalition
Rp
Project Quantity

0 Total Capital Costs (1 + 2 + 3) 27,579,411,279


1 Capital Construction Costs 27,579,411,279
1.01 Demolition, site preparation and formation 262,054,805
1.02 Substructure 4,676,824,640
1.03 Structure 8,430,561,262
1.04 Architectural works | Non-structural works 7,061,418,779
1.05 Services and equipment 4,845,503,815
1.06 Surface and underground drainage Not included
1.07 External and ancillary works 872,553,304
1.08 Preliminaries | Contractor's site overheads | general requirements 1,430,494,676
1.09 Risk Allowances Not included
1.10 Taxes and Levies Not included
2 Associated Capital Costs 0
2.01 Work and utilities off-site Not included
2.02 Post-completion loose furniture, fittings and equipment 0
2.03 Construction-related consultancies and supervision Not included
2.04 Risk Allowances Not included
3 Site Acquisition and Client's Other Costs 0
3.01 Site acquisition Not included
3.02 Administrative, finance, legal and marketing expenses Not included

* $ is in Rupiah Indonesia
Worked examples are reproduced wi
Rp/m² % of '0'
3,346

IPMS Floor Area (m²)

8,242,333.1 100.0%
8,242,333.1 100.0%
78,317.2 1.0%
1,397,707.4 17.0%
2,519,542.3 30.6%
2,110,362.9 25.6%
1,448,118.5 17.6%

260,769.7 3.2%
427,515.1 5.2%

0.0 0.0%

0.0 0.0%

0.0 0.0%

© ICMS Coalition
Worked examples are reproduced with kind permission of the ICMS Coalition
ELEMENTAL COST ANALYSIS
Project: PENYUSUNAN DED GEDUNG KANTOR BPMPTSP KOTA PADANG

SUMMARY OF ELEMENT COST


GFA: 3346.07 m2

% Cost of
Total Cost Of Element Cost per m2 GFA
Element
Rp Rp
1 Pekerjaan Standar
1A Pondasi 4,456,510,379.13 1331864.66 #REF!
1B Struktur 8,348,476,641.46 2495010.68 #REF!
1C Lantai #REF! #REF! #REF!
1D Dinding #REF! #REF! #REF!
1E Plafond #REF! #REF! #REF!
1F Atap 892,489,430.78 266727.78 #REF!
1G Utilitas 697,386,400.00 208419.64 #REF!
1H Finishing 193,696,636.73 57887.83 #REF!

Group Element Total #REF! #REF! #REF!


2 Pekerjaan Non Standar
2A Tata Udara (AC) 1,139,064,400.00 340418.73 #REF!
2B Elevator/Escalator 0.00 0.00 #REF!
2C Tata Suara 80,514,000.00 24062.27 #REF!
2D Telepon dari PABX 92,576,400.00 27667.22 #REF!
2E Elektrikal (termasuk genset) 5,492,239,314.50 1641400.74 #REF!
2F Instalasi Pencegahan Kebakaran 143,539,900.00 42898.08 #REF!
2G Pencegahan Bahaya Rayap 80,514,000.00 24062.27 #REF!
2H Sewage Treatment Plant (STP) 0.00 0.00 #REF!
2I Interior (termasuk furniture) 0.00 0.00 #REF!
2J Pondasi Dalam 0.00 0.00 #REF!
2K Fasilitas Penyandang Cacat 0.00 0.00 #REF!
2L Penangkal Petir Khusus 44,887,300.00 13414.94 #REF!
2M Sarana/Prasarana Lingkungan 0.00 0.00 #REF!
2N Basement 0.00 0.00 #REF!
2O Peningkatan Mutu 0.00 0.00 #REF!

Group Element Total 7,073,335,314.50 2113924.24 #REF!

Sub-total Konstruksi Fisik #REF! #REF! #REF!

Preliminaries
1,398,953,860.51 418088.83 #REF!

TOTAL (Less Contigencies) #REF! #REF! #REF!


Tidak Sederhana

TENDER DATE: 5-Apr-19

Reinforced Reinforce-
Formwork
Concrete ment
m3 kg m2

1,440.00 0.00
1,052.40 178,802.72 7,196.10
6.43
20.95
ESTIMASI BIAYA PEMBANGUNAN
PEMBANGUNAN GEDUNG KANTOR BPMPTSP
Kab. Agam

Proyek : PENYUSUNAN DED GEDUNG KANTOR BPMPTSP KOTA PADANG NAMA : IHSAN ROHMATULLAH
Lokasi : Kab. Agam NPM : 1710015410085
Peruntukkan : Kab. Agam
Jumlah Lantai : 3 Lt
Luas Lantai Bangunan : 3346.07 M2
BANGUNAN TIDAK SEDERHANA

HSBGN = Rp 5,840,000.00 /M2


Koefisien Jumlah Lantai = 1.120
I. BIAYA KONSTRUKSI BANGUNAN STANDARD

ü Biaya Standard = Luas bangunan X HSBGN X Koefisien jumlah lantai


3,346.07 x 5,840,000.00 X Rp 1.12 = Rp 21,885,964,844.80

I. Total Biaya Bangunan Standar = Rp 21,885,964,844.80

II. BIAYA NON STANDARD

l Generator Set = 300 kVA lengkap dengan alat bantu 7.00% Rp 1,532,017,539.14
l PABX 3.00% Rp 656,578,945.34
l Tata Udara atau AC 10.00% Rp 2,188,596,484.48
l Instalasi Pemadam Kebakaran 7.00% Rp 1,532,017,539.14
l Tata Suara atau soundsystem 3.00% Rp 656,578,945.34
l Instalasi IT atau Informasi dan Teknologi 6.00% Rp 1,313,157,890.69
l Sistem Penangkal Petir Khusus 2.00% Rp 437,719,296.90

Sub Total Non Standar = Rp 8,316,666,641.02

Jumlah Biaya Konstruksi Fisik Total (Standard Dan Non Standard) I + II = Rp 30,202,631,485.82

Biaya Perencanaan Konstruksi 3.34% X BIAYA KONSTRUKSI FISIK

C. Biaya Perencanaan

50,000,000,000 - 25,000,000,000.00 Rp 30,202,631,485.82 - 25,000,000,000.00


=
3.02 - 3.42 X - 3.42
25,000,000,000.00 5,202,631,485.82
=
-0.4 X - 3.42

25,000,000,000.00 X - 85,500,000,000.00 = - 2,081,052,594.33


III. BIAYA IZIN-IZIN & LAIN-LAIN X = 83,418,947,405.67
25,000,000,000.00
X = 3.34 %

Biaya Perencanaan = Persentase X Biaya Konstruksi Fisik


= 3.34% X Rp 30,202,631,485.82

Biaya Perencanaan = Rp. 1,008,767,891.63

C. Biaya Pengawasan

50,000,000,000 - 25,000,000,000.00 Rp 30,202,631,485.82 - 25,000,000,000.00


=
2 - 2.3 X - 2.3
25,000,000,000.00 5202631486
=
-0.3 X - 2.3

25,000,000,000.00 X - 57,500,000,000.00 = - 1,560,789,445.75


X = 55,939,210,554.25
25,000,000,000.00
X = 2.24 %

Biaya Perencanaan = Persentase X Biaya Konstruksi Fisik


= 2.24% X Rp 30,202,631,485.82

Biaya Pengawasan = Rp. 676,538,945.28

C. Biaya Pengelolaan Proyek

50,000,000,000 - 25,000,000,000.00 Rp 30,202,631,485.82 - 25,000,000,000.00


=
0.93 - 1.42 X - 1.42
25,000,000,000.00 5202631485.82401
=
-0.49 X - 1.42

25,000,000,000.00 X - 35,500,000,000.00 = - 2,549,289,428.05


X = 32,950,710,571.95
25,000,000,000.00
X = 1.32 %

Biaya Perencanaan = Persentase X Biaya Konstruksi Fisik


= 1.32% X Rp 30,202,631,485.82

BIAYA PENGOLAHAN PROYEK = Rp. 398,674,735.61

= Rp. 32,286,613,058.35
Total Biaya Proyek

NABILA RIZQA / 1610015410032


HARGA SATUAN BANGUNAN GEDUNG
Provinsi : Sumatra Barat
Kab/Kota : Kabupaten AGAM
Tahun : 2018

Gedung Negara
Tidak Sederhana
Rp 5,840,000 Rp

Rumah Negara
Tipe A Tipe B Tipe C,D,E
Rp 5,230,000 Rp 49,930,000 Rp

Pagar Gedung Negara


Depan Belakang Samping
BT; T. 1,50 M T. 3 M T. 2 M
Rp 2,210,000 Rp 1,900,000 Rp

Pagar Rumah Negara


Depan Belakang Samping
BH; T. 1,50 M T. 2,5 M T. 2 M
Rp 2,020,000 Rp 1,130,000 Rp
NGUNAN GEDUNG NEGARA

AM

edung Negara
Sederhana
Rp 4,210,000

umah Negara
Tipe C,D,E
Rp 3,550,000

r Gedung Negara
Samping
T. 2 M
Rp 1,800,000

ar Rumah Negara
Samping
T. 2 M
Rp 1,030,000
Muhammad Iqbal Darfi
1610015410003
DAFTAR HARGA UPAH
KABUPATEN AGAM
2018
NO JENIS UPAH
1 Pekerja Hari

2 Pekerja terlatih Hari

3 Mandor Hari

4 Tukang Kayu Kasar Hari

5 Tukang Kayu Halus Hari

6 Kepala Tukang Kayu Hari

7 Tukang Batu Kasar Hari

8 Tukang Batu Halus Hari

9 Kepala Tukang Batu Hari

10 Tukang Cat Biasa Hari

11 Kepala Tukang Cat Hari

12 Tukang Listrik Hari

13 Kepala Tukang Listrik Hari

14 Tukang Besi Konstruksi Hari

15 Tukang Besi Tulangan Hari

16 Kepala Tukang Besi Hari

17 Supervisor Hari

18 Operator Hari

19 Mandor II Hari

20 Mekanik Hari

21 Pekerja Terlatih Hari

20
Muhammad Iqbal Darfi
1610015410003
22 Tukang Bronjong Hari

25 Tukang Waterproofing Hari

26 Tukang Las Hari

27 Kepala Tukang Hari


DAFTAR HARGA BAHAN MATERIAL
KABUPATEN AGAM
2018
NO JENIS BAHAN BANGUNAN SAT
I BATU-BATUAN

Batu kali
- Batu Kali M3
- Batu Pecah 15/20 CM (M3) M3
- Batu Pecah 5/7 M3
Batu Pecah mesin/Split
- Batu Pecah 3/4 M3
- Batu Pecah 2/3 M3
- Batu Pecah 1/2 M3
- Abu Batu M3
Kerikil
- Kerekel Beton kg
- Kerekel Timbun M3
- Kerekel Saring M3
- Koral Sikat Kg
Pasir
- Pasir Pasang M3
- Pasir Beton M3
- Pasir Urug M3
- Tanah Taman M3
- Tanah Urug M3
- Tanah cadas (timbun pilihan) M3
Batu Bata
- Batu bata (5 x 11 x 23) Bh
Bata beton ringan ex Celcon Bh
- Hollow Brick Bh
- Bata Merah Bh
- Paving Block Bh
- Krep Ukuran 40 x 60 Cm Bh
- Batu Pualam / Batu Palimanan M2
- Batako Buah

21
Muhammad Iqbal Darfi
1610015410003
- Cincin Beton (bertulang) dia 80 cm Buah
- Cincin Beton (bertulang) dia 100 cm Buah
- Cincin Beton (bertulang) dia 120 cm Buah

Semen :
- Semen Type I (50 kg) Zak
- Semen Type PCC Zak
- Semen Putih (40 kg) Zak
- Kapur Sirih Kg
- Semen Warna Kg
- Semen Grout Kg
- Screning Kg
- Semen Merah Kg
II BAHAN KAYU
- Kayu Banio (kelas I)
- Papan M2
- Balok M3
- Kayu Marsawa (kelas II)
- Kayu Marsawa (kelas II) Papan M3
- Kayu Marsawa (kelas II) Balok M3
- Kayu Merantih (kelas III)
- Kayu Merantih (kelas III) Papan (M3) M3
- Kayu Merantih (kelas III) Balok (M3) M3
- Kayu Bekisting (kelas IV)
- (kelas IV) Papan (M3) M3
- (kelas IV) Balok (M3) M3
Dolken dia 8 s/d 10 Cm btg
Triplek
- Tebal 3 mm (Kw 1) Lbr
- Tebal 4 mm (Kw 1) Lbr
- Tebal 6 mm (Kw 1) Lbr
- Triplek Tebal 9 mm (Kw 1) Lbr
- Kenari Putih Lbr
- Triplek Jati (teak wood) Lbr
- Triplek Sungkai Lbr
Formika Lbr
Bahan loteng
- Eternit asbes ( 1m x 1m) Lbr
- Gipsun Panel 6 mm (1,2m x 2,4 m) Lbr
- Gipsun Panel 9 mm (1,2m x 2,4 m) Lbr
- Hollow 40.20 (Alumunium) m1
- Rangka plafond Metal furing m2
- Les 1 x 3 x 400 cm Btg
- Les 1 x 5 x 400 cm Btg

22
Muhammad Iqbal Darfi
1610015410003
- Les Profil Gypsum 5cm Btg
- Les Profil 4 x 4,5 x 400 cm Btg
- Lamber Siring Btg
- Kayu lapis 4 mm ukuran 8" x 4" Lbr
- Kayu lapis 12 mm ukuran 8" x 4" Lbr
- Papan GRC tebal 4 mm (Lbr) Lbr
- Papan GRC tebal 6 mm (Lbr) Lbr
- List Profil m1
- Plafond PVC m1
III BAHAN BESI & KAWAT
- Kawat berduri Rol
- Kawat beton Kg
- Kawat nyamuk M2
- Kawat ayak M2
- Kawat ayam M2
- Kawat Beronjong (galvani) 4 mm Rol
- Beronjong Pabrikasi M3
- Geo Textil M2
Kawat las Kg
BAHAN BESI
- Besi Beton U-24 Kg
- Besi Beton U-39 Kg
- Besi Beton Ø 4 mm panjang 12 Btg
- Besi Beton Ø 5 mm panjang 12 Btg
- Besi Beton Ø 6 mm panjang 12 Btg
- Besi Beton Ø 7 mm panjang 12 Btg
- Besi Beton Ø 8 mm panjang 12 Btg
- Besi Beton Ø 9 mm panjang 12 Btg
- Besi Beton Ø 10 mm panjang 12 Btg
- Besi Beton Ø 12 mm panjang 12 Btg
- Besi Beton Ø 16 mm panjang 12 Btg
- Besi Beton Ø 19 mm panjang 12 Btg
- Besi Beton Ø 22 mm panjang 12 Btg
- Besi Beton Ø 25 mm panjang 12 Btg
- Besi U 32 (ulir) Kg
- Rangka Atap Baja Ringan M2
- Besi Siku Kg
- Besi Plat Rata Kg
- Besi Tempa M2
BAHAN PAKU
- Besi Paku 1 s/d 3 cm (KG) Kg
- Besi Paku 5 s/d 10 cm (KG) Kg
- Besi Paku 8 s/d 12 cm (KG) Kg
- Paku seng (1/2 - 1)" RRC (KG) kg
- Paku Halus Kg
- Paku Sekrup bh

23
Muhammad Iqbal Darfi
1610015410003
Dinabolt dia 12 cm (10 s.d 15) cm bh
Paku Pancing 6x23 kg
( 2 - 5 )" kg
IV BAHAN PIPA
Pipa Besi Standart
Medim/SNI panjang 6 m
- Merk Spindo Galvanis Ø 1/2 " Btg
- Merk Spindo Galvanis Ø 3/4 " Btg
- Merk Spindo Galvanis Ø 1" Btg
- Merk Spindo Galvanis Ø 1 3/4 " Btg
- Merk Spindo Galvanis Ø 1 1/2 " Btg
- Merk Spindo Galvanis Ø 2" Btg
- Merk Spindo Galvanis Ø 2 1/2 " Btg
- Merk Spindo Galvanis Ø 3 " /63 mm Btg
- Merk Spindo Galvanis Ø 4" / 100 mm Btg
Merk Spindo Galvanis Ø 125 mm m
Merk Spindo Galvanis Ø 150 mm m
Merk Spindo Galvanis Ø 200 mm m
Merk Spindo Galvanis Ø 250 mm m
Pipa Besi GI - 6 m
- Merk BSA SPINDO Galvanis Ø 1/2'' Btg
- Merk BSA SPINDO Galvanis Ø 3/4'' Btg
- Merk BSA SPINDO Galvanis Ø 1'' Btg
- Merk BSA SPINDO Galvanis Ø 1 3/4'' Btg
- Merk BSA SPINDO Galvanis Ø 1 1/2'' Btg
- Merk BSA SPINDO Galvanis Ø 2'' Btg
- Merk BSA SPINDO Galvanis Ø 2 1/2'' Btg
- Merk BSA SPINDO Galvanis Ø 3'' Btg
- Merk BSA SPINDO Galvanis Ø 4'' Btg
Pipa PVC - 6 m
- PVC Ø 1/2" m'
- PVC Ø 3/4" m'
- PVC Ø 1" m'
- PVC Ø 1 3/4" m'
- PVC Ø 1 1/2" m'
- PVC Ø 2" m'
- PVC Ø 2 1/2" m'
- PVC Ø 3" m'
- PVC Ø 50 mm m'
PVC Ø 100mm m'
PVC Ø 150 mm m'
PVC Ø 200 mm m'
PVC Ø 250 mm m'
PVC Ø 300 mm m'
PVC Ø 400 mm m'
Pipa PE/HDPE
- PE Ø 1/2" m'

24
Muhammad Iqbal Darfi
1610015410003
- PE Ø 3/4" m'
- PE Ø 1" m'
- PE Ø 1 3/4" m'
- PE Ø 1 1/2" m'
- PE Ø 2" m'
- PE Ø 2 1/2" m'
- PE Ø 3"/ 63 mm m'
- PE Ø 4"/100 mm m'
TS TEE/PE pralon SNI
- Rendncer Soched PVC Ø 2 1/2" Bh
- Water Moor GI Ø 3" Bh
- Water Moor GI Ø 4" Bh
Valve
- Valve Ø 150 mm buah
- Valve Ø 200 mm buah
- Valve Ø 250 mm buah
- Valve Ø 300 mm buah
- Valve Ø 400 mm buah
- Valve Ø 450 mm buah
Tee
- TEE 2" buah
- Tee Ø 150 mm buah
- Tee Ø 200 mm buah
- Tee Ø 250 mm buah
- Tee Ø 300 mm buah

Knee
- KNEE 2" buah
V BAHAN ATAP
- Seng BJLS 0,2 x 3' x 6' bd 11 (Lbr) Lbr
- Seng BJLS 0,3 x 3' x 6' bd 11 Lbr
- Seng Datar BJLS 0,2 x 3' x 6' Lbr
- Seng Datar BJLS 0,3 x 3' x 6' Lbr
- Genteng Metal Lbr
- Genteng Keramik bh
- Genteng Keramik Glazur bh
- Nok Genteng Keramik bh
- Nok Genteng Keramik Glazur bh
- Nok Genteng Metal bh
- Sisik Ikan Almunium M1
- Mahkota Gonjong bh
- Sealant Tb
Atap plastik
- Warna Putih Arclic Lbr
- Fibre Glass Lbr

25
Muhammad Iqbal Darfi
1610015410003
Atap Seng Warna
- Tebal 0,2 bd 11 merk Swan Brand Lbr
- Tebal 0,2 bd 11 merk Gold Fish Lbr
- Genteng Metal (Polycolor) Lbr
- Atap Asbes Gelombang Lbr
- Atap Zinkcalum M2
- Perabung Zinkcalum M1
- Bola-bola atap Zinkcalum M1
- Alumunium Composite Panel PVDV Hl
- Kligot Zinkcalum M1
- Listplak Zinkcalum M1
- Genteng Sirap Lbr
- Listplak GRC t=12mm M1
VI BAHAN LANTAI/DINDING
Keramik Lantai
- Uk. (20 x 20) cm doos
- Uk. (30 x 30) cm doss
- Plint Keramik 10/30 cm Bh
Granit
- Granit surface matt laterite Uk. (40 x 40) cmM2
- Granite uk 60x60 Glossy Bh
- Granite uk 60x60 Antislip Bh
- Granite uk 30x60 Matt Bh
- Alat Bantu Ls
- Keramik centro uk 20x40/m2 M2
Untuk dinding
- Uk. (10 x 20) cm M2
Uk (10x30) cm
- Uk. (20 x 20) cm M2
- Uk. (20 x 25) cm M2

Bahan Tarasso
- Karawang Super Bh
- Karawang Beton Bh
- Karawang Kaca Bh
Bulnos M1
VII BAHAN KACA
Kaca Polos :
- Tebal 3 mm M2
- Tebal 5 mm M2
- Kaca Polos Tebal 10 mm M2
Kaca Buram tebal 12 mm M2
- Glass Block Bh

26
Muhammad Iqbal Darfi
1610015410003
Raiben :
- Raiben Tebal 3 mm M2
- Raiben Tebal 5 mm M2
Raso :
- Tebal 3 mm M2
- Tebal 5 mm M2
Tebal 8 mm M2
Kaca nako polos
- (14 x 90) cm + rangka M2
Profil Kaca m
Wireglassed
Tebal 5 mm m2
Kaca Patri
Tebal 5 mm m2
VIII BAHAN ALMUNIUM
- Kusen Almunium 4 " m'
- Rangka Jendela Almunium m'
- Rangka Pintu Almunium m'
- Kusen & Pintu PVC toilet Unit
- Sunscreen alumunium m2
- Rolling door alumunium m2
- Profil Jendela Alumunium Btg
- Profil Pintu Alumunium Btg
- Profil Alumunium Kaca Btg
- Pintu Lipat ?Folding door dari PVC m2
- Baja Ringan C75.75 M1
- Reng/Top Span M1
- Baut Secrew Bh
- Holow 40x40 (alumunium) M1
- Skrup fixer bh
Hollow 40x60 1,7 btg
Hollow 40x40 1,7 btg
Hollow 20x40 1,8 btg
Reling Tangga Besi Holoow 4 x 1.5 x 4 M1
Akustik (30 x 60) cm lbr
Akustik (60 x 120) cm lbr
IX PENGGANTUNG/PENGUNCI
Kunci Pintu/Tanam
- Merk Jangkar 9702 RRC/692 LD Set
- Jangkar 746 Set
- Merk Ciga Brown 5404 Set
- Merk Ciga Brown 5009 Set
- Kunci Mandili 450 Italy Set
- Kunci Antik A/C Italy Set
Kunci Pintu alumunium Set
- Kunci Shanghai 9702 LD Set

27
Muhammad Iqbal Darfi
1610015410003
- Selinder bh
- Door Stoper bh
- Slot Tanam bh
- Door closer bh
- Grendel Antik 2 Set
- Grendel Antik 10 Set
- Tarikan Antik Jendela Set
- Engsel Nylon Set
- Engsel Lokal Set
- Kait Angin Set
- Floorhinge dekson Set
- Handle pintu bh
- Rel Pintu Dorong Set
- Pullhandle dekkson PH D1868 40X25X600 PSS+SS Psg
- Patcfitting Set
- Kunci pintu Frameless Set
- Engsel 4" Buah
- Engsel 3" BUah
- Handvatten Buah
- Springknip Buah
- Dor Closer Buah
- Friction Stay 14" Psg
- Friction Stay 8" Psg
- Rambucis Buah
X CAT & BAHAN CAT
- Cat Minyak setara Platone Kg
- Negaltex Cat Tembok Kg
- Aqua Proof / Water proofing Kg
- Dempul Tembok Kg
- Supervinex Cat Tembok Kg
- Multi Seal Cat Seng Kg
- Cat Tembok Kwalitas 1 Kg
- Cat Tembok Venilex Kg
- Cat tembok Caltilac Kg
- Plamir Tembok Kg
- Clear dof btl
- Zamitex Kg
- cat dasar Kg
- Cat Dasar Alkali Kg
- Dempul Kg
- Cat Penutup Kg
- Coating Batu alam Kg
- Colour impra Kg
- Sanding Sealer Kg
Pendukung
- Plemer Kayu - wa Kg
- Meni kayu - wa Kg

28
Muhammad Iqbal Darfi
1610015410003
- Meni besi - wa Kg
- Wood Filler Kg
- Thinner Ltr
- Residu Ltr
- Minyak Cat Ltr
- Kuas uk 4" Bh
- Kuas uk 3" Bh
- Kuas uk 2,5 " Bh
- Amplas Bh
- Lem Kayu Kg
- Seal tape bh
- Minyak bekisting Ltr
- Plamuur Kg
- Seal tape Bh
XI BAHAN SANITAIR
Closet Jongkok
- Closet Jongkok Merk KIA type EX RAPI (12 Bh
- Merk KIA type DX RAPI (1273 AO) Bh
- Merk TOTO Bh
- Merk Campion Bh
Closet duduk
- Closet Duduk 900t putih set Bh
- Merk TOTO type C Warna Tua Bh
Wastafel komplek
- Wastafel Toto Komplit & acc Bh
- Merk KIA Type Susan (1263.F220) Bh
- Bak Viber Kapasitas 1 M3 Bh
- Bak air Fibreglass 0,5 M3 Bh
- Water Toren 1000L tr Bh
- Urine Noer Bh
- Tangki air 1000 liter Bh
- Tangki air 500 liter Bh
- Kran otomatis ex omron ALS-04 Bh
- Stop Kran dia 1" bh
- Stop Kran dia 3/4" bh
- Klep dia 3/4 Bh
- Pelampung otomatis Bh
- Roof Drain Metal Bh
- Mesin Jet Pump kap. 250 watt Unit
- Mesin Pompa tekan kap. 150 watt Unit
- Floor drain Bh
- Shower Spray Unit
- Shower Set Unit
- Tempat Sabun bh
- Kran zink bh
- Kitchenzink bh
- Kran dinding bh

29
Muhammad Iqbal Darfi
1610015410003
- Wastafel Bh
- Bak Cuci piring teraso Bh
Kran Air
Kran 1/2 - 3/4 Bh
XII BUIS BETON
- Ø 100 cm Bh
- Ø 80 cm Bh
- Ø 60 cm Bh
- Ø 40 cm Bh
- Ø 30 cm Bh
- Ø 20 cm Bh
- 1/2 Ø 20 cm Bh
Trali Beton / Bowling
- Terali Besi M2
Bahan Bambu
- Besar Btg
- Sedang Btg
- Kecil Btg
Bilik Bambu m2
Bahan elextrical
- Biaya Pasang Baru Listrik Prabayar 2200 Ls
- Box panel uk 40x60 (Kosong) Buah
- MCB Induk 3 pas merk scheneigdher Unit
- MCB 16 A Siknaider (10 Group) Buah
- Sisir Penghubung (tembaga) Buah
- Pemasangan Instalasi Stop Kontak Titik
- Pemasangan Instalasi Penerangan Titik
- Box panel PVC isi 4 MCB bh
- MCB 6 A bh
- MCB 4 A bh
- MCB 1 Pase ( Merlin Gerin ) Bh
- BCB 3 Pase ( Merlin Gerin ) Bh
- Elbom Saklar 100 A Bh
- Stop kontak Bh
- Stop Kontak 1 Pase Bh
- Stop Kontak 3 Pase Bh
- Stop Kontak AC Bh
- Cap Daun Ligting Bh
- Down light / PLC 13 W bh
- Lampu TL 40 Wat Bh
- Lampu TL 2 x 18 Watt grille Bh
- Lampu TL 2 x 36 Watt grille Bh
- Lampu SL 18 Wat Bh
- Lampu SL 20 Wat Bh
- Lampu SL 40 Wat Bh
- Trafo TL 40 Wat Bh
- Trafo TL 20 Wat Bh

30
Muhammad Iqbal Darfi
1610015410003
- Trafo TL 10 Wat Bh
- Tekong - Tekong Saklar Bh
- Tedos 5/8 Bh
- Tedos 3/4 Bh
- Pipa united ( Pipa Listrik ) Bh
- Pipa Biasa 5/8 ( Pipa Listrik ) Bh
- Pipa 3/4 ( Pipa Listrik ) Clipsal Bh
- Fiting Plafond + lampu SL Bh
- Saklar Tunggal Bh
- Saklar ganda Bh
- Saklar Tripel Bh
- Saklar Gretswit Bh
- Saklar One Gang ex Clipsal Unit
- Saklar Two Gang Ex Clipsal Unit
- Saklar Three Gang Ex Clipsal Unit
- Lovre 20x60 cm Unit
- Lampu TL LED 22 watt Bh
- Bohlam SL LED 10 watt ex Phillip E27 Unit
- Bohlam SL LED 5 watt ex Phillip E27 Unit
- Fitting Drat Unit
- Downlight 4" Unit
- Outlet TV bh
- Outlet Telephone bh
- Kabel NYA 2.5 mm m'
- Kabel NYA 1.5 mm m'
- Kabel NYM 2 X 2.5 mm m'
- Kabel NYM 3 X 2.5 mm m'
- Kabel NYM 4 X 2.5 mm m'
- Kabel NYM 2 X 1.5 mm m'
- Kabel NYM 3 X 1.5 mm m'
- Kabel NYM 4 X 1.5 mm m'
- Kabel NYY 2 X 2.5 mm m'
- Kabel NYY 3 X 2.5 mm m'
- Kabel NYY 4 X 2.5 mm m'
- Kabel NYY 2 X 1.5 mm m'
- Kabel NYY 3 X 1.5 mm m'
- Kabel NYY 4 X 1.5 mm m'
- Kabel telephone 4 x 0,5 mm m'
- Kabel NYY 4X10mm m'
- Kabel NYM 3x2,50 mm Rol
- Kabel NYM 2X1,50 mm' Rol
- Kabel NYA 2,50 mm (three Coluor) Rol
- Kabel NYA 1,50mm Rol
- Tuistid Cabel 2 X 10 mm m'
- Rolen Bh
- Benang Ramin Ikat
- Solasi Ban Bh

31
Muhammad Iqbal Darfi
1610015410003
- Pus Box Bh
- Tiang Dan 9 Btg
- Tiang Dan 10 Btg
Klem Buah
XIII BAHAN WATERPROOFING
Waterstop lebar 270 mm m1
Aditive Waterproofing ltr

XIV BAHAN LAIN


- ijuk Kg
- Rajuk Gonjong Bh
- TBA Bh
- Aspal Kg
- Solar Ltr
- Premium Ltr
- Gembalan rumput M2
- Readymix K-250 m3
- Air Ltr
- Oli Ltr
XV LAIN-LAIN
- IMB m2
- Sewa Alat Pengelasan Unit hari
- Sewa Molen Unit hari
- Material Tambahan Ls
- Alat Bantu Tambahan Ls
- Sewa Pipe Support Buah Hari
- Sewa Scafolding Buah Hari
- Sewa Genset 1500 Watt Buah Hari
- Sewa Pompa Conposer dan Beton Buah Hari
- Penjaga Jarak/Spacer Buah Hari
- Storox Ltr
- Panel Kolom Pracetak Lbr
- Kolom Beton Pracetak Batang
- Lantai Kerja t=10 cm m3
- Phenol Film Lbr
- Pengelasan m
- Sealant Tube
- Venetions Blinds atau Vertical Blinds (tirai m2
- Rangka metal hollow 40.40.2 mm m2
- Baja Ringan canai Dingin C75 Kg
- Mortar Siap Pakai Kg
- Ramset bh
- Plastik Aerator bh
- Sisalation / Allumunium Foil m2
- Soda Api Kg

32
Muhammad Iqbal Darfi
1610015410003
H

Rp ###
80,000.00

Rp ###
90,000.00

Rp ###
120,000.00

Rp ###
120,000.00

Rp ###
120,000.00

Rp ###
130,000.00

Rp ###
120,000.00

Rp ###
120,000.00

Rp ###
130,000.00

Rp ###
120,000.00

Rp ###
130,000.00

Rp ###
125,000.00

Rp ###
130,000.00

Rp ###
120,000.00

Rp ###
120,000.00

Rp ###
130,000.00

Rp ###
110,000.00

Rp ###
180,000.00

Rp ###
130,000.00

Rp ###
120,000.00

Rp ###
110,000.00

33
Muhammad Iqbal Darfi
1610015410003
Rp ###
121,000.00

Rp ###
121,000.00

Rp ###
120,000.00

Rp ###
130,000.00
TERIAL

HARGA (Rp)

Rp ###
175,000.00
Rp ###
200,000.00
Rp ###
250,000.00

Rp ###
315,000.00
Rp ###
350,000.00
Rp ###
370,000.00
Rp ###
375,000.00

Rp ###
88.89
Rp ###
135,000.00
Rp ###
150,000.00
Rp ###
3,500.00

Rp ###
140,000.00
Rp ###
150,000.00
Rp ###
90,000.00
Rp ###
80,000.00
Rp ###
75,000.00
Rp ###
110,000.00

Rp ###
1,000.00
Rp ###
5,500.00
Rp ###
5,000.00
Rp ###
850.00
Rp ###
3,500.00
Rp ###
75,000.00
Rp ###
150,000.00
Rp ###
2,400.00

34
Muhammad Iqbal Darfi
1610015410003
Rp ###
193,000.00
Rp ###
220,000.00
Rp ###
246,000.00

Rp ###
70,000.00
Rp ###
64,000.00
Rp ###
140,000.00
Rp ###
2,000.00
Rp ###
15,000.00

Rp ###
3,500,000.00
Rp ###
3,500,000.00

Rp ###
3,000,000.00
Rp ###
3,000,000.00

Rp ###
2,500,000.00
Rp ###
2,500,000.00

Rp ###
2,000,000.00
Rp ###
1,880,000.00
Rp ###
20,000.00

Rp ###
55,000.00
Rp ###
62,000.00
Rp ###
90,000.00
Rp ###
115,000.00
Rp ###
112,000.00
Rp ###
120,000.00
Rp ###
120,000.00
Rp ###
110,000.00

Rp ###
30,000.00
Rp ###
80,000.00
Rp ###
190,000.00
Rp ###
8,600.00
Rp ###
50,000.00
Rp ###
10,000.00
Rp ###
15,000.00

35
Muhammad Iqbal Darfi
1610015410003
Rp ###
20,000.00
Rp ###
20,000.00
Rp ###
18,500.00
Rp ###
21,000.00
Rp ###
53,000.00
Rp ###
68,000.00
Rp ###
96,000.00
Rp ###
4,200.00
Rp ###
57,000.00

Rp ###
165,000.00
Rp ###
17,000.00
Rp ###
38,500.00
Rp ###
38,500.00
Rp ###
22,000.00
Rp ###
770,000.00
Rp ###
400,000.00
Rp ###
335,000.00
Rp ###
136,000.00

Rp ###
11,000.00
Rp ###
11,000.00
Rp ###
22,000.00
Rp ###
26,400.00
Rp ###
30,800.00
Rp ###
41,800.00
Rp ###
52,800.00
Rp ###
60,500.00
Rp ###
83,600.00
Rp ###
117,700.00
Rp ###
198,000.00
Rp ###
278,300.00
Rp ###
379,500.00
Rp ###
473,000.00
Rp ###
11,000.00
Rp ###
150,000.00
Rp ###
11,000.00
Rp ###
15,500.00
Rp ###
240,000.00

Rp ###
20,500.00
Rp ###
18,000.00
Rp ###
18,000.00
Rp ###
33,000.00
Rp ###
38,500.00
Rp ###
25,000.00

36
Muhammad Iqbal Darfi
1610015410003
Rp ###
1,000.00

Rp ###
15,000.00

Rp ###
154,000.00
Rp ###
209,000.00
Rp ###
220,000.00
Rp ###
247,500.00
Rp ###
275,000.00
Rp ###
330,000.00
Rp ###
385,000.00
Rp ###
936,000.00
Rp ###
1,564,000.00
Rp ###
295,000.00
Rp ###
419,750.00
Rp ###
980,528.00
Rp ###
1,200,000.00

Rp ###
132,000.00
Rp ###
110,000.00
Rp ###
209,000.00
Rp ###
242,000.00
Rp ###
302,500.00
Rp ###
440,000.00
Rp ###
577,500.00
Rp ###
759,000.00
Rp ###
825,000.00

Rp ###
4,750.00
Rp ###
6,500.00
Rp ###
9,000.00
Rp ###
17,500.00
Rp ###
15,000.00
Rp ###
19,500.00
Rp ###
28,000.00
Rp ###
38,500.00
Rp ###
54,000.00
Rp ###
81,790.00
Rp ###
200,267.00
Rp ###
312,067.00
Rp ###
486,950.00
Rp ###
775,067.00
Rp ###
1,253,883.00

Rp ###
6,600.00

37
Muhammad Iqbal Darfi
1610015410003
Rp ###
8,500.00
Rp ###
13,800.00
Rp -
Rp ###
33,300.00
Rp ###
52,600.00
Rp ###
73,400.00
Rp ###
106,400.00
Rp ###
158,250.00

Rp ###
8,800.00
Rp ###
7,300.00
Rp ###
8,500.00

Rp ###
850,000.00
Rp ###
1,250,000.00
Rp ###
2,315,000.00
Rp ###
6,581,000.00
Rp ###
8,000,000.00
Rp ###
9,750,000.00

Rp ###
36,800.00
Rp ###
158,000.00
Rp ###
180,000.00
Rp ###
476,500.00
Rp ###
884,500.00

Rp ###
28,200.00

Rp ###
44,000.00
Rp ###
64,900.00
Rp ###
71,500.00
Rp ###
71,000.00
Rp ###
49,500.00
Rp ###
1,500.00
Rp ###
5,000.00
Rp ###
2,500.00
Rp ###
12,000.00
Rp ###
27,500.00
Rp ###
158,000.00
Rp ###
364,500.00
Rp ###
15,600.00

Rp ###
99,000.00
Rp ###
88,000.00

38
Muhammad Iqbal Darfi
1610015410003

Rp ###
110,000.00
Rp ###
88,000.00
Rp ###
88,000.00
Rp ###
38,500.00
Rp ###
90,200.00
Rp ###
24,200.00
Rp ###
24,200.00
Rp ###
1,250,000.00
Rp ###
24,200.00
Rp ###
29,700.00
Rp ###
8,300.00
Rp ###
13,500.00

Rp ###
45,000.00
Rp ###
47,500.00
Rp ###
1,600.00

Rp ###
178,000.00
Rp ###
205,000.00
Rp ###
234,000.00
Rp ###
37,500.00
Rp ###
200.00
Rp ###
154,000.00

Rp ###
66,000.00

Rp ###
66,000.00
Rp ###
71,500.00

Rp ###
66,000.00
Rp ###
55,000.00
Rp ###
49,500.00
Rp ###
32,000.00

Rp ###
80,000.00
Rp ###
90,000.00
Rp ###
250,000.00
Rp ###
2,045,000.00
Rp ###
24,200.00

39
Muhammad Iqbal Darfi
1610015410003

Rp ###
120,000.00
Rp ###
150,000.00

Rp ###
132,000.00
Rp ###
275,000.00

Rp ###
82,500.00

Rp ###
95,000.00
Rp ###
75,000.00
Rp ###
75,000.00
Rp ###
500,000.00

Rp ###
225,000.00
Rp ###
465,000.00
Rp ###
75,000.00

Rp ###
20,000.00
Rp ###
12,000.00
Rp ###
550.00
Rp ###
16,500.00
Rp ###
400.00
Rp ###
177,000.00
Rp ###
138,000.00
Rp ###
130,000.00
Rp ###
762,000.00
Rp 27,500.00
Rp 36,000.00

Rp ###
80,000.00
Rp ###
60,500.00
Rp ###
220,000.00
Rp ###
138,600.00
Rp ###
220,000.00
Rp ###
275,000.00
Rp ###
164,000.00
Rp ###
93,500.00

40
Muhammad Iqbal Darfi
1610015410003
Rp ###
242,000.00
Rp ###
63,000.00
Rp ###
215,000.00
Rp ###
250,000.00
Rp ###
12,000.00
Rp ###
35,000.00
Rp ###
19,800.00
Rp ###
20,000.00
Rp ###
15,400.00
Rp ###
10,000.00
Rp ###
830,000.00
Rp ###
140,000.00
Rp ###
239,000.00
Rp ###
875,000.00
Rp ###
466,000.00
Rp ###
374,000.00
Rp ###
34,500.00
Rp ###
26,700.00
Rp ###
21,000.00
Rp ###
31,000.00
Rp ###
150,000.00
Rp ###
64,000.00
Rp ###
43,000.00
Rp ###
41,000.00

Rp ###
60,000.00
Rp ###
44,000.00
Rp ###
82,500.00
Rp ###
22,000.00
Rp ###
22,000.00
Rp ###
66,000.00
Rp ###
55,000.00
Rp ###
20,000.00
Rp ###
27,500.00
Rp ###
17,500.00
Rp ###
27,500.00
Rp ###
55,000.00
Rp ###
30,000.00
Rp ###
72,000.00
Rp ###
34,000.00
Rp ###
70,000.00
Rp ###
55,000.00
Rp ###
94,000.00
Rp ###
67,000.00

Rp ###
30,000.00
Rp ###
30,000.00

41
Muhammad Iqbal Darfi
1610015410003
Rp ###
38,500.00
Rp ###
27,500.00
Rp ###
18,000.00
Rp ###
49,500.00
Rp ###
22,000.00
Rp ###
25,300.00
Rp ###
13,000.00
Rp ###
11,000.00
Rp ###
8,000.00
Rp ###
15,000.00
Rp ###
15,000.00
Rp ###
5,000.00
Rp ###
20,000.00
Rp ###
10,000.00

Rp ###
412,500.00
Rp ###
412,500.00
Rp ###
420,000.00
Rp ###
265,000.00

Rp ###
710,000.00
Rp ###
1,650,000.00

Rp ###
750,000.00
Rp ###
1,650,000.00
Rp ###
440,000.00
Rp ###
325,000.00
Rp ###
1,650,000.00
Rp ###
1,700,000.00
Rp ###
1,500,000.00
Rp ###
1,100,000.00
Rp ###
150,000.00
Rp ###
25,000.00
Rp ###
20,000.00
Rp ###
30,000.00
Rp ###
25,000.00
Rp ###
35,000.00
Rp ###
950,000.00
Rp ###
550,000.00
Rp ###
100,000.00
Rp ###
325,000.00
Rp ###
885,000.00
Rp ###
175,000.00
Rp ###
326,000.00
Rp ###
250,000.00
Rp ###
263,000.00

42
Muhammad Iqbal Darfi
1610015410003
Rp 970,000.00
Rp 280,000.00

Rp ###
25,000.00

Rp ###
385,000.00
Rp ###
275,000.00
Rp ###
220,000.00
Rp ###
203,500.00
Rp ###
165,000.00
Rp ###
137,500.00
Rp ###
71,500.00

Rp ###
12,100.00

Rp ###
77,000.00
Rp ###
39,600.00
Rp ###
24,200.00

Rp ###
3,850,000.00
Rp ###
725,000.00
Rp ###
585,000.00
Rp ###
68,000.00
Rp ###
145,000.00
Rp ###
275,000.00
Rp ###
242,000.00
Rp ###
150,000.00
Rp ###
50,000.00
Rp ###
50,000.00
Rp ###
137,500.00
Rp ###
60,500.00
Rp ###
1,200.00
Rp ###
17,000.00
Rp ###
16,500.00
Rp ###
165,000.00
Rp ###
14,500.00
Rp ###
30,300.00
Rp ###
170,000.00
Rp ###
82,500.00
Rp ###
250,000.00
Rp ###
300,000.00
Rp ###
44,000.00
Rp ###
48,400.00
Rp ###
99,000.00
Rp ###
36,300.00
Rp ###
33,000.00

43
Muhammad Iqbal Darfi
1610015410003
Rp ###
27,500.00
Rp ###
5,500.00
Rp ###
6,600.00
Rp ###
3,300.00
Rp ###
13,200.00
Rp ###
13,200.00
Rp ###
18,200.00
Rp ###
50,000.00
Rp ###
15,000.00
Rp ###
17,000.00
Rp ###
30,800.00
Rp ###
3,600.00
Rp ###
53,000.00
Rp ###
94,000.00
Rp ###
128,000.00
Rp ###
345,000.00
Rp ###
163,000.00
Rp ###
138,000.00
Rp ###
88,000.00
Rp ###
7,000.00
Rp ###
34,000.00
Rp ###
43,500.00
Rp ###
43,500.00
Rp ###
8,800.00
Rp ###
8,300.00
Rp ###
10,500.00
Rp ###
16,000.00
Rp ###
24,200.00
Rp ###
82,500.00
Rp ###
36,300.00
Rp ###
42,400.00
Rp ###
6,100.00
Rp ###
12,100.00
Rp ###
18,200.00
Rp ###
24,200.00
Rp ###
30,300.00
Rp ###
36,300.00
Rp ###
15,000.00
Rp ###
58,000.00
Rp ###
470,000.00
Rp ###
335,000.00
Rp ###
275,000.00
Rp ###
165,000.00
Rp ###
12,100.00
Rp ###
1,700.00
Rp ###
5,500.00
Rp ###
3,000.00

44
Muhammad Iqbal Darfi
1610015410003
Rp ###
33,000.00
Rp ###
1,980,000.00
Rp ###
2,365,000.00

Rp ###
132,000.00
Rp ###
5,000.00
###
###
###
###
Rp ###
15,100.00
Rp ###
2,200.00
Rp ###
5,500.00
Rp ###
12,000.00
Rp 12,600.00
Rp ###
11,900.00
Rp 36,300.00
Rp ###
1,200,000.00
Rp ###
3,000.00
Rp ###
30,000.00

Rp 500.00

Rp 113,100.00
Rp 2,000.00
Rp 2,000.00
Buah Hari
Buah Hari
Buah Hari
Rp 2,200,000.00
Rp 19,500.00
###

Rp 28,000.00

###
###

Rp 25,000.00

45
ANALISA HARGA SATUAN PEKERJAAN

KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATUR


PEKERJAAN : PENYUSUNAN DED GEDUNG KANTOR BPMPTSP KOTA PADANG
LOKASI : AIE PACAH - PADANG
TAHUN ANGGARAN : 2018

HARGA SATUAN PEKERJAAN PERSIAPAN 15%

JENIS PEKERJAAN : Pengukuran dan pemasangan 1 M" Bouwplank


SATUAN : M'
HARGA SATUAN PEKERJAAN : Rp 384,744.00

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.100 90,000.00 9,000.00
Tukang Kayu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 130,000.00 1,300.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 22,900.00
B BAHAN
Kayu balok 5/7 M3 0.120 2,390,000.00 286,800.00
Paku biasa 5" - 10" Kg 0.020 18,000.00 360.00
Kayu papan 3/20 M3 0.007 3,500,000.00 24,500.00
JUMLAH HARGA BAHAN 311,660.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 334,560.00
E Overhead & profit 15% x Jumlah 50,184.00
F Harga Satuan Pekerjaan (D+E) 384,744.00

JENIS PEKERJAAN : Pembersihan 1 m2 lapangan dan perataan


SATUAN : M2
HARGA SATUAN PEKERJAAN : Rp 16,100.00

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 14,000.00
B BAHAN
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 14,000.00
E Overhead & profit 15% x Jumlah 2,100.00
F Harga Satuan Pekerjaan (D+E) 16,100.00

IHSAN ROHMATULLAH/1710015410085
HARGA SATUAN PEKERJAAN TANAH

JENIS PEKERJAAN : Penggalian 1 m3 tanah biasa sedalam 1 m


SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 72,450.00

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.750 80,000.00 60,000.00
Mandor L.04 OH 0.025 120,000.00 3,000.00
JUMLAH TENAGA KERJA 63,000.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 63,000.00
E Overhead & profit 15% x Jumlah 9,450.00
F Harga Satuan Pekerjaan (D+E) 72,450.00

JENIS PEKERJAAN : Pengurugan 1 m3 dengan pasir urug


SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 153,180.00

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Mandor L.04 OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 25,200.00
B BAHAN
Pasir urug M3 1.200 90,000.00 108,000.00
JUMLAH HARGA BAHAN 108,000.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 133,200.00
E Overhead & profit 15% x Jumlah 19,980.00
F Harga Satuan Pekerjaan (D+E) 153,180.00

IHSAN ROHMATULLAH/1710015410085
JENIS PEKERJAAN : Pengurugan 1 m3 sirtu padat
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 178,250.00

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Mandor L.04 OH 0.025 120,000.00 3,000.00
JUMLAH TENAGA KERJA 23,000.00
B BAHAN
Sirtu M3 1.200 110,000.00 132,000.00
JUMLAH HARGA BAHAN 132,000.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 155,000.00
E Overhead & profit 15% x Jumlah 23,250.00
F Harga Satuan Pekerjaan (D+E) 178,250.00

HARGA SATUAN PEKERJAAN PONDASI

JENIS PEKERJAAN : Pemasangan 1 m3 pondasi batu Belah Camp, 1PC : 4 Pasir Pasang
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 972,962.10

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 1.500 90,000.00 135,000.00
Tukang L.02 OH 0.750 120,000.00 90,000.00
Kepala tukang L.03 OH 0.075 130,000.00 9,750.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 243,750.00
B BAHAN
Batu Belah M3 1.200 250,000.00 300,000.00
Semen Portland Kg 163.000 1,408.00 229,504.00
Pasir Pasang M3 0.520 140,000.00 72,800.00
b 602,304.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 846,054.00
E Overhead & profit 15% x Jumlah 126,908.10
F Harga Satuan Pekerjaan (D+E) 972,962.10

IHSAN ROHMATULLAH/1710015410085
HARGA SATUAN PEKERJAAN BETON

JENIS PEKERJAAN : Membuat beton mutu f3c = 7,4 Mpa (K 100), slump (12 ± 2) Cm, w/c 0,87
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 732,797.22

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 1.650 90,000.00 148,500.00
Tukang Batu L.02 OH 0.275 120,000.00 33,000.00
Kepala tukang L.03 OH 0.028 130,000.00 3,640.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 195,100.00
B BAHAN
Semen Portland Kg 247.000 1,408.00 347,776.00
Pasir beton Kg 869 107.14 93,107.14
Kerikil (Maks 30 mm) Kg 999 0.05 49.33
Air Liter 215 5.50 1,182.50
JUMLAH HARGA BAHAN 442,114.98
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 637,214.98
E Overhead & profit 15% x Jumlah 95,582.25
F Harga Satuan Pekerjaan (D+E) 732,797.22

JENIS PEKERJAAN : Membuat Lantai kerja beton mutu f3c = 7,4 Mpa (K 100), slump (3 - 6) Cm, w/c 0,87
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 646,839.68

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 1.200 90,000.00 108,000.00
Tukang Batu L.02 OH 0.200 120,000.00 24,000.00
Kepala tukang L.03 OH 0.020 130,000.00 2,600.00
Mandor L.04 OH 0.060 120,000.00 7,200.00
JUMLAH TENAGA KERJA 141,800.00
B BAHAN
Semen Portland Kg 230.000 1,408.00 323,840.00
Pasir beton Kg 893 107.14 95,678.57
Kerikil (Maks 30 mm) Kg 1027 0.05 50.72
Air Liter 200 5.50 1,100.00
JUMLAH HARGA BAHAN 420,669.29
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 562,469.29
E Overhead & profit 15% x Jumlah 84,370.39
F Harga Satuan Pekerjaan (D+E) 646,839.68

IHSAN ROHMATULLAH/1710015410085
JENIS PEKERJAAN : Membuat beton mutu f3c = 14,5 Mpa (K 175), slump (12 ± 2) Cm, w/c 0,66
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 847,285.37

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 1.650 90,000.00 148,500.00
Tukang Batu L.02 OH 0.275 120,000.00 33,000.00
Kepala tukang L.03 OH 0.028 130,000.00 3,640.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 195,100.00
B BAHAN
Semen Portland Kg 326.000 1,408.00 459,008.00
Pasir beton Kg 760 107.14 81,428.57
Kerikil (Maks 30 mm) Kg 1029 0.05 50.81
Air Liter 215 5.50 1,182.50
JUMLAH HARGA BAHAN 541,669.89
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 736,769.89
E Overhead & profit 15% x Jumlah 110,515.48
F Harga Satuan Pekerjaan (D+E) 847,285.37

JENIS PEKERJAAN : Membuat beton mutu f3c = 19,3 Mpa (K 225), slump (12 ± 2) Cm, w/c 0,58
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 893,536.11

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang Batu L.02 OH 0.275 120,000.00 33,000.00
Kepala tukang L.03 OH 0.028 130,000.00 3,640.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 178,600.00
B BAHAN
Semen Portland Kg 371.000 1,408.00 522,368.00
Pasir beton Kg 698 107.14 74,785.71
Kerikil (Maks 30 mm) Kg 1047 0.05 51.70
Air Liter 215 5.50 1,182.50
JUMLAH HARGA BAHAN 598,387.92
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 776,987.92
E Overhead & profit 15% x Jumlah 116,548.19
F Harga Satuan Pekerjaan (D+E) 893,536.11

IHSAN ROHMATULLAH/1710015410085
JENIS PEKERJAAN : Membuat beton mutu f3c = 21,7 Mpa (K 250), slump (12 ± 2) Cm, w/c 0,56
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 1,634,189.11

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 1.650 90,000.00 148,500.00
Tukang Batu L.02 OH 0.275 120,000.00 33,000.00
Kepala tukang L.03 OH 0.028 130,000.00 3,640.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 195,100.00
B BAHAN
Ready Mixed K-250 M3 1.020 1,200,000.00 1,224,000.00
JUMLAH HARGA BAHAN 1,224,000.00
C PERALATAN
Pompa dan Conpesor Beton sewa/ hari 0.0171 113,100.00 1,934.01
JUMLAH HARGA ALAT 1,934.01
D JUMLAH (A+B+C) 1,421,034.01
E Overhead & profit 15% x Jumlah 213,155.10
F Harga Satuan Pekerjaan (D+E) 1,634,189.11

JENIS PEKERJAAN : A.4.1.1.9 Membuat Lantai kerja beton mutu f3c = 24,0 Mpa (K 275), slump (12 ± 2) Cm,
w/c 0,53
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 967,456.91

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 1.650 90,000.00 148,500.00
Tukang Batu L.02 OH 0.275 120,000.00 33,000.00
Kepala tukang L.03 OH 0.028 130,000.00 3,640.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 195,100.00
B BAHAN
Semen Portland Kg 406.000 1,408.00 571,648.00
Pasir beton Kg 684 107.14 73,285.71
Kerikil (Maks 30 mm) Kg 1026 0.05 50.67
Air Liter 215 5.50 1,182.50
JUMLAH HARGA BAHAN 646,166.88
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 841,266.88
E Overhead & profit 15% x Jumlah 126,190.03
F Harga Satuan Pekerjaan (D+E) 967,456.91

IHSAN ROHMATULLAH/1710015410085
JENIS PEKERJAAN : Membuat beton mutu f3c = 26,4 Mpa (K 300), slump (12 ± 2) Cm, w/c 0,52
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 1,208,976.61

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 1.650 90,000.00 148,500.00
Tukang Batu L.02 OH 0.275 120,000.00 33,000.00
Kepala tukang L.03 OH 0.028 130,000.00 3,640.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 195,100.00
B BAHAN
Ready Mixed K-300 Kg 1.020 837,500.00 854,250.00
JUMLAH HARGA BAHAN 854,250.00
C PERALATAN
Pompa dan Conpesor Beton sewa/ hari 0.0171 113,100.00 1,934.01
JUMLAH HARGA ALAT 1,934.01
D JUMLAH (A+B+C) 1,051,284.01
E Overhead & profit 15% x Jumlah 157,692.60
F Harga Satuan Pekerjaan (D+E) 1,208,976.61

JENIS PEKERJAAN : Memasang 1M3 Waterprofing Integral


SATUAN : M3
HARGA SATUAN : Rp 167,141.00

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.130 90,000.00 11,700.00
Tukang Waterprofing L.02 OH 0.600 121,000.00 72,600.00
Kepala tukang L.03 OH 0.020 130,000.00 2,600.00
Mandor L.04 OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 88,100.00
B BAHAN
Waterstop lebar 270 mm M1 0.320 132,000.00 42,240.00
Aditive Waterprofing Ltr 3.00 5,000.00 15,000.00
JUMLAH HARGA BAHAN 57,240.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 145,340.00
E Overhead & profit 15% x Jumlah 21,801.00
F Harga Satuan Pekerjaan (D+E) 167,141.00

IHSAN ROHMATULLAH/1710015410085
JENIS PEKERJAAN : Pembesian 10 kg dengan besi polos atau besi ulir
SATUAN : Kg
HARGA SATUAN : Rp 154,341.50

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.070 90,000.00 6,300.00
Tukang L.02 OH 0.070 121,000.00 8,470.00
Kepala tukang L.03 OH 0.007 130,000.00 910.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 16,160.00
B BAHAN
Besi beton (polos/ulir) Kg 10.500 11,000.00 115,500.00
Kawat beton Kg 0.150 17,000.00 2,550.00
JUMLAH HARGA BAHAN 118,050.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 134,210.00
E Overhead & profit 15% x Jumlah 20,131.50
F Harga Satuan Pekerjaan (D+E) 154,341.50

JENIS PEKERJAAN : Pemasangan 1 m2 bekisting untuk kolom


SATUAN : M2
HARGA SATUAN PEKERJAAN : Rp 393,415.00

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.660 90,000.00 59,400.00
Tukang L.02 OH 0.330 120,000.00 39,600.00
Kepala tukang L.03 OH 0.033 130,000.00 4,290.00
Mandor L.04 OH 0.033 120,000.00 3,960.00
JUMLAH TENAGA KERJA 107,250.00
B BAHAN
Kayu kelas III M3 0.040 2,500,000.00 100,000.00
Paku 5 - 10 Cm Kg 0.400 18,000.00 7,200.00
Minyak bekisting Liter 0.200 12,000.00 2,400.00
Balok kayu kelas II M3 0.015 3,000,000.00 45,000.00
Plywod tebal 9 mm Lbr 0.350 115,000.00 40,250.00
Dolken kayu φ 8-10 Cm Batang 2.000 20,000.00 40,000.00
JUMLAH HARGA BAHAN 234,850.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 342,100.00
E Overhead & profit 15% x Jumlah 51,315.00
F Harga Satuan Pekerjaan (D+E) 393,415.00

IHSAN ROHMATULLAH/1710015410085
JENIS PEKERJAAN : Pemasangan 1 m2 bekisting untuk balok
SATUAN : M2
HARGA SATUAN : Rp 403,765.00

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.660 90,000.00 59,400.00
Tukang L.02 OH 0.330 120,000.00 39,600.00
Kepala tukang L.03 OH 0.033 130,000.00 4,290.00
Mandor L.04 OH 0.033 120,000.00 3,960.00
JUMLAH TENAGA KERJA 107,250.00
B BAHAN
Kayu kelas III M3 0.040 2,500,000.00 100,000.00
Paku 5 - 10 Cm Kg 0.400 18,000.00 7,200.00
Minyak bekisting Liter 0.200 12,000.00 2,400.00
Balok kayu kelas II M3 0.018 3,000,000.00 54,000.00
Plywod tebal 9 mm Lbr 0.350 115,000.00 40,250.00
Dolken kayu φ 8-10 Cm Batang 2.000 20,000.00 40,000.00
JUMLAH HARGA BAHAN 243,850.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 351,100.00
E Overhead & profit 15% x Jumlah 52,665.00
F Harga Satuan Pekerjaan (D+E) 403,765.00

JENIS PEKERJAAN : Pemasangan 1 m2 bekisting untuk Lantai


SATUAN : M2
HARGA SATUAN PEKERJAAN : Rp 483,805.00

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.660 90,000.00 59,400.00
Tukang L.02 OH 0.330 120,000.00 39,600.00
Kepala tukang L.03 OH 0.033 130,000.00 4,290.00
Mandor L.04 OH 0.033 120,000.00 3,960.00
JUMLAH TENAGA KERJA 107,250.00
B BAHAN
Kayu kelas III M3 0.040 2,500,000.00 100,000.00
Paku 5 - 10 Cm Kg 0.400 18,000.00 7,200.00
Minyak bekisting Liter 0.200 5,000.00 1,000.00
Balok kayu kelas II M3 0.015 3,000,000.00 45,000.00
Plywod tebal 9 mm Lbr 0.350 115,000.00 40,250.00
Dolken kayu φ 8-10 Batang 6.000 20,000.00 120,000.00
JUMLAH HARGA BAHAN 313,450.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 420,700.00
E Overhead & profit 15% x Jumlah 63,105.00
F Harga Satuan Pekerjaan (D+E) 483,805.00

IHSAN ROHMATULLAH/1710015410085
JENIS PEKERJAAN : Pemasangan 1 m2 bekisting untuk dinding
SATUAN : M2
HARGA SATUAN PEKERJAAN : Rp 493,005.00

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA

Pekerja L.01 OH 0.660 90,000.00 59,400.00

Tukang L.02 OH 0.330 120,000.00 39,600.00


Kepala tukang L.03 OH 0.033 130,000.00 4,290.00
Mandor L.04 OH 0.033 120,000.00 3,960.00
JUMLAH TENAGA KERJA 107,250.00
B BAHAN
Kayu kelas III M3 0.030 2,500,000.00 75,000.00
Paku 5 - 10 Cm Kg 0.400 18,000.00 7,200.00
Minyak bekisting Liter 0.200 5,000.00 1,000.00
Balok kayu kelas II M3 0.020 3,000,000.00 60,000.00
Plywod tebal 9 mm Lbr 0.350 115,000.00 40,250.00
Dolken kayu φ 8-10 Cm Batang 3.000 20,000.00 60,000.00
Penjaga jarak bekising/PCacer Bh 4.000 19,500.00 78,000.00
JUMLAH HARGA BAHAN 321,450.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 428,700.00
E Overhead & profit 15% x Jumlah 64,305.00
F Harga Satuan Pekerjaan (D+E) 493,005.00

JENIS PEKERJAAN : Pemasangan 1 m2 bekisting untuk tangga


SATUAN : M2
HARGA SATUAN PEKERJAAN : Rp 362,767.50

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.660 90,000.00 59,400.00
Tukang L.02 OH 0.330 120,000.00 39,600.00
Kepala tukang L.03 OH 0.033 130,000.00 4,290.00
Mandor L.04 OH 0.033 120,000.00 3,960.00
JUMLAH TENAGA KERJA 107,250.00
B BAHAN
Kayu kelas III M3 0.030 2,500,000.00 75,000.00
Paku 5 - 10 Cm Kg 0.400 18,000.00 7,200.00
Minyak bekisting Liter 0.150 5,000.00 750.00
Balok kayu kelas II M3 0.015 3,000,000.00 45,000.00
Plywod tebal 9 mm Lbr 0.350 115,000.00 40,250.00
Dolken kayu φ 8-10 Cm Batang 2.000 20,000.00 40,000.00
JUMLAH HARGA BAHAN 208,200.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 315,450.00
E Overhead & profit 15% x Jumlah 47,317.50
F Harga Satuan Pekerjaan (D+E) 362,767.50

IHSAN ROHMATULLAH/1710015410085
JENIS PEKERJAAN : Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
SATUAN : M2
HARGA SATUAN PEKERJAAN : Rp 1,058,074.75

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 1.050 90,000.00 94,500.00
Tukang Las L.02 OH 1.050 120,000.00 126,000.00
Kepala tukang L.03 OH 0.105 125,000.00 13,125.00
Mandor L.04 OH 0.052 120,000.00 6,240.00
JUMLAH TENAGA KERJA 239,865.00
B BAHAN
Besi siku L 30.30.3 Kg 15.000 11,000.00 165,000.00
Besi plat baja Kg 32.800 15,500.00 508,400.00
Kawat las Kg 0.050 136,000.00 6,800.00
JUMLAH HARGA BAHAN 680,200.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 920,065.00
E Overhead & profit 15% x Jumlah 138,009.75
F Harga Satuan Pekerjaan (D+E) 1,058,074.75

JENIS PEKERJAAN : Pemasangan 1 m1 kusen pintu alluminium


SATUAN : M1
HARGA SATUAN : Rp 153,846.43

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.043 90,000.00 3,870.00
Tukang L.02 OH 0.043 120,000.00 5,160.00
Kepala tukang L.03 OH 0.0043 125,000.00 537.50
Mandor L.04 OH 0.0021 120,000.00 252.00
JUMLAH TENAGA KERJA 9,819.50
B BAHAN
Profil alluminium M 1.100 110,000.00 121,000.00
Skrup fixer Bh 2.000 400.00 800.00
Sealant Tube 0.060 36,000.00 2,160.00
JUMLAH HARGA BAHAN 123,960.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 133,779.50
E Overhead & profit 15% x Jumlah 20,066.93
F Harga Satuan Pekerjaan (D+E) 153,846.43

IHSAN ROHMATULLAH/1710015410085
JENIS PEKERJAAN : Pemasangan 1 m2 pintu alluminium strip lebar 8 Cm
SATUAN : M2
HARGA SATUAN : Rp 1,166,578.98

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.085 90,000.00 7,650.00
Tukang L.02 OH 0.085 120,000.00 10,200.00
Kepala tukang L.03 OH 0.0085 125,000.00 1,062.50
Mandor L.04 OH 0.0042 120,000.00 504.00
JUMLAH TENAGA KERJA 19,416.50
B BAHAN
Profil alluminium M 4.400 110,000.00 484,000.00
Alluminium strip M 14.600 35,000.00 511,000.00
JUMLAH HARGA BAHAN 995,000.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 1,014,416.50
E Overhead & profit 15% x Jumlah 152,162.48
F Harga Satuan Pekerjaan (D+E) 1,166,578.98

JENIS PEKERJAAN : Pemasangan 1 m2 pintu/ Jendela kaca rangka alluminium t. 5 mm


SATUAN : M2
HARGA SATUAN : Rp 691,305.25

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.0850 90,000.00 7,650.00
Tukang L.02 OH 0.0850 120,000.00 10,200.00
Kepala tukang L.03 OH 0.0090 125,000.00 1,125.00
Mandor L.04 OH 0.0050 120,000.00 600.00
JUMLAH TENAGA KERJA 19,575.00
B BAHAN
Profil Alluminium M1 4.400 110,000.00 484,000.00
Kaca t. 5 mm M2 1.000 90,000.00 90,000.00
Sealant Tube 0.270 28,000.00 7,560.00
JUMLAH HARGA BAHAN 581,560.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 601,135.00
E Overhead & profit 15% x Jumlah 90,170.25
F Harga Satuan Pekerjaan (D+E) 691,305.25

IHSAN ROHMATULLAH/1710015410085
JENIS PEKERJAAN : Pemasangan 1 m2 pintu/ Jendela kaca Tempered rangka alluminium t. 12 mm
SATUAN : M2
HARGA SATUAN : Rp 1,450,357.00

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.0850 90,000.00 7,650.00
Tukang L.02 OH 0.0850 120,000.00 10,200.00
Kepala tukang L.03 OH 0.0090 130,000.00 1,170.00
Mandor L.04 OH 0.0050 120,000.00 600.00
JUMLAH TENAGA KERJA 19,620.00
B BAHAN
Profil Alluminium M1 4.400 110,000.00 484,000.00
Kaca t. 12 mm M2 1.000 750,000.00 750,000.00
Sealant Tube 0.270 28,000.00 7,560.00
JUMLAH HARGA BAHAN 1,241,560.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 1,261,180.00
E Overhead & profit 15% x Jumlah 189,177.00
F Harga Satuan Pekerjaan (D+E) 1,450,357.00

JENIS PEKERJAAN : Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modul 60 x 60 Cm, plafon
SATUAN : M2
HARGA SATUAN : Rp 92,902.75

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.350 90,000.00 31,500.00
Tukang besi L.02 OH 0.350 120,000.00 42,000.00
Kepala tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.018 120,000.00 2,160.00
JUMLAH TENAGA KERJA 80,035.00
B BAHAN
Rangka metal hollow 40.40.2 mm M1 4.000 150.00 600.00
Assesoris (perkuatan, las dll) Ls 1.000 150.00 150.00
JUMLAH HARGA BAHAN 750.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 80,785.00
E Overhead & profit 15% x Jumlah 12,117.75
F Harga Satuan Pekerjaan (D+E) 92,902.75

HARGA SATUAN PEKERJAAN PASANGAN DINDING

JENIS PEKERJAAN : Pemasangan 1 m2 dinding Bata Merah (5x11x22) Cm tebal 1/2 batu Camp, 1PC : 2 Pasir Pasang
SATUAN : M2
HARGA SATUAN : Rp 149,267.70 IHSAN ROHMATULLAH/1710015410085
Page 61 of 690

RENCANA ANGGARAN BIAYA


PONDASI DAN STRUKTUR
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATUR
PEKERJAAN : PENYUSUNAN DED GEDUNG KANTOR BPMPTSP KOTA PADANG
LOKASI : AIE PACAH - PADANG
TAHUN ANGGARAN : 2018

HARGA JUMLAH TOTAL


NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA HARGA
(Rp.) (Rp.) (Rp.)

I PEKERJAAN PONDASI DAN STRUKTUR BERTULANG

A PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi
a Material dan Sewa Alat Ls 1.00 1,000,000,000.00 1,000,000,000.00
- Scafolding
- Excavator
Penyedian
- Los Pekerjaan
Generator Set luas sesuai Kebutuhan,
b Kantor Sementara,
Gudang Kantor
danSementara,
OperasionalLos
Kantor
Kerja , Ls 1.00 152,000,000.00 152,000,000.00
- Gudang dan Operasional Kantor
- Sumber Air, Satuan Keamanan dan Listrik
2 Pembersihan Lapangan dan Perataan M2 4,592.17 16,100.00 73,933,872.60
3 Sewa Pagar Sementara dari seng bergelombang tinggi M1 289.15 60,000.00 17,348,760.00
4 2Pekerjaan
m Pengukuran dan Pemasangan Bouwplank M1 159.20 384,744.00 61,251,244.80
5 Biaya Penyelengaraan SMK.3 Konstruksi
a sosialisasi dan promosi K.3
1 Spanduk (banner) Ls 3.00 150,000.00 450,000.00
2 Poster Ls 35.00 50,000.00 1,750,000.00
3 Papan Informasi K.3 Bh 2.00 500,000.00 1,000,000.00
b Alat Pelindung Kerja
1 Jaring Pengaman (Safety Net) Ls 1.00 300,000.00 300,000.00
2 Tali Keselamatan (Life Line) Ls 1.00 300,000.00 300,000.00
3 Penahan Jatuh (Safety Deck) Ls 1.00 300,000.00 300,000.00
4 Pagar Pengaman (Guard Reilling) Ls 1.00 300,000.00 300,000.00
5 Pembatas Area (Restricted Area) Ls 1.00 300,000.00 300,000.00
c Alat Pelindung Diri
1 Topi Pelindung (Safety Helmed) Bh 100.00 75,000.00 7,500,000.00
2 Pelindung Mata (Goggles, Spectac Les) Psg 20.00 27,000.00 540,000.00
3 Tameng Muka (Face Shield) Bh 5.00 75,000.00 375,000.00
4 Pelindung Teliga (Ear Flug, Ear muft) Psg 20.00 50,000.00 1,000,000.00
5 Pelindung Pernapasan dan Mulut (Masker) Bh 100.00 5,000.00 500,000.00
6 Sarung Tangan (safety Gloves) Psg 100.00 5,000.00 500,000.00
7 Sepatu Keselamatan untuk Staff (Rubber Psg 20.00 270,000.00 5,400,000.00
8 safety
Sepatushoes)
Keselamatan Untuk Pekerja Psg 100.00 245,000.00 24,500,000.00
9 Penunjang
(Rubber Safety
seluruh Tubuh (Full Bady
Shoes) Bh 15.00 750,000.00 11,250,000.00
Rompi Keselamatan (Safety Vest)
10 Harness) Bh 100.00 25,000.00 2,500,000.00
11 Celemek (Apron, Coveralls) Bh 5.00 40,000.00 200,000.00
12 Pelindung Jatuh (Fall Arrester) Bh 10.00 300,000.00 3,000,000.00
d Asuransi dan Perijinan
1 BPJS Ketenagakerjaan dan Keselamatan Ls 1.00 13,943,000.00 13,943,000.00
2 Kerja
Surat Ijin Kabaikan Alat Alat/ Kend 1.00 8,500,000.00 8,500,000.00
3 Surat Ijin Operator Lb/ Alat 1.00 6,500,000.00 6,500,000.00
4 Surat ijin pengesahan Panitia pembina Ls 1.00 500,000.00 500,000.00
e FasilitasKeselamatan Kerja dan Kesehatan Kerja
Sarana Kesehatan
1 Peralatan P3K (Kotak P3K, Tandu, Tabung Ls 1.00 6,500,000.00 6,500,000.00
2 Oksigen, Obata
Ruang P3K Luka,Tidur
(Tempat Perban, dll)
Pasien, Ls 1.00 5,000,000.00 5,000,000.00
3 Peralatan Timbangan(Fogging)
Stetoscop,Pengasapan Berat Badan, Tenci Bh 1.00 1,500,000.00 1,500,000.00
4 Obat Pengasapan Kali 6.00 25,000.00 150,000.00
f Rambu-rambu
1 Rambu Petunjuk Bh 10.00 75,000.00 750,000.00
2 Rambu Larangan Bh 10.00 75,000.00 750,000.00
3 Rambu Peringantan Bh 10.00 75,000.00 750,000.00
4 Rambu Kewajiban Bh 10.00 75,000.00 750,000.00
5 Rambu Informasi Bh 5.00 75,000.00 375,000.00
6 Rambu Pekerjaan Sementara Bh 2.00 75,000.00 150,000.00
7 Tongkat Pengatur Lalu Lintas Bh 3.00 50,000.00 150,000.00
8 Kerucut Lalu Lintas Bh 5.00 100,000.00 500,000.00
9 Lampu Putar Bh 2.00 100,000.00 200,000.00
10 Lampu Selang Lalu Lintas (Warning Lights Ls 1.00 1,000,000.00 1,000,000.00
g Lain-lainStick)
Terkait Pengendalian Resiko K.3
1 Alat Pemadam Api Ringan (APAR 10 Kg) Bh 5.00 350,000.00 1,750,000.00
2 Sirine Bh 1.00 100,000.00 100,000.00
3 Bendera K.3 Bh 2.00 50,000.00 100,000.00
4 Jalur Evakuasi (Escape Route) Ls 1.00 500,000.00 500,000.00
5 Lampu Darurat (Emergency Lamp) Bh 3.00 70,000.00 210,000.00

1,417,126,877.40

B PEKERJAAN PONDASI

a PEKERJAAN TANAH
Page 62 of 690

1 Striping dan Grabing 60 cm (Elev. 4.00 s/d 4.60) M3 1,161.00 30,751.88 35,702,932.68
2 Urugan Tanah Baru area stripping dan grabbing/ M3 1,440.00 114,216.30 164,471,472.00
dibawah ribk
3 Pemadatan (Elev.
tanah 4.60
area s/d 4.00)
striping dan grabbing/ M3 1,440.00 42,972.50 61,880,400.00
dibawah ribk 262,054,804.68

b PEKERJAAN PONDASI KSLL


1 Pondasi konstruksi Sarang Laba-Laba (KSLL) M2 1,623.00 2,565,000.00 4,162,995,000.00
2 Pas. Waterprofing Intergral beton lantai Basement M3 227.22 167,141.00 37,977,778.02
4,200,972,778.02

C PEKERJAAN BETON BERTULANG


2 PEKERJAAN PLAT PENAHAN TANAH
a Dinding Plat D1
1 Pekerjaan Beton K 250 M3 17.42 1,634,189.11 28,472,476.89
2 Pembesian Kg 1,131.52 15,434.15 17,464,111.14
3 Pekerjaan Bekisting M2 174.23 483,805.00 84,293,345.15
4 Pekerjaan Afwerking M2 174.23 64,997.58 11,324,527.81
5 Pekerjaan Cat Afwerking M2 174.23 33,090.20 5,765,305.55
b Dinding Plat D1'
1 Pekerjaan Beton K 250 M3 16.16 1,634,189.11 26,411,764.42
2 Pembesian Kg 1,049.48 15,434.15 16,197,831.74
3 Pekerjaan Bekisting M2 161.62 483,805.00 78,193,531.71
4 Pekerjaan Afwerking M2 161.62 64,997.58 10,505,038.36
5 Pekerjaan Cat Afwerking M2 161.62 33,090.20 5,348,104.30
c Dinding Plat D2
1 Pekerjaan Beton K 250 M3 0.51 1,634,189.11 825,265.50
2 Pembesian Kg 37.01 15,434.15 571,279.63
3 Pekerjaan Bekisting M2 5.05 483,805.00 2,445,150.47
4 Pekerjaan Afwerking M2 5.05 64,997.58 328,497.75
5 Pekerjaan Cat Afwerking M2 5.05 33,090.20 167,237.87
d Dinding Plat D3
1 Pekerjaan Beton K 250 M3 0.73 1,634,189.11 1,197,860.62
2 Pembesian Kg 51.07 15,434.15 788,222.04
3 Pekerjaan Bekisting M2 7.33 483,805.00 3,548,225.87
4 Pekerjaan Afwerking M2 7.33 64,997.58 476,692.23
5 Pekerjaan Cat Afwerking M2 7.33 33,090.20 242,683.53
e Dinding Plat D4
1 Pekerjaan Beton K 250 M3 1.89 1,634,189.11 3,082,080.66
2 Pembesian Kg 128.91 15,434.15 1,989,616.28
3 Pekerjaan Bekisting M2 18.86 483,805.00 9,124,562.30
4 Pekerjaan Afwerking M2 18.86 64,997.58 1,225,854.30
5 Pekerjaan Cat Afwerking M2 18.86 33,090.20 624,081.17
f Dinding Plat D5
1 Pekerjaan Beton K 250 M3 8.72 1,634,189.11 14,243,592.30
2 Pembesian Kg 552.93 15,434.15 8,533,942.82
3 Pekerjaan Bekisting M2 87.16 483,805.00 42,169,895.22
4 Pekerjaan Afwerking M2 87.16 64,997.58 5,665,383.79
5 Pekerjaan Cat Afwerking M2 87.16 33,090.20 2,884,241.10 384,110,402.51

3 KOLOM P + -2,90 - 0,00


a KOLOM K1A
1 Pekerjaan Beton K 300 M3 6.70 1,208,976.61 8,098,934.32
2 Pekerjaan Pembesian Kg 864.35 15,434.15 13,340,461.25
3 Bekisting M2 32.42 393,415.00 12,754,514.30
4 Pekerjaan Afwerking M2 32.42 64,997.58 2,107,221.44
5 Pekerjaan Cat Afwerking M2 32.42 33,090.20 1,072,784.28
b KOLOM K1B
1 Pekerjaan Beton K 300 M3 17.05 1,208,976.61 20,615,469.18
2 Pekerjaan Pembesian Kg 2,406.49 15,434.15 37,142,096.77
3 Bekisting M2 85.68 393,415.00 33,707,797.20
4 Pekerjaan Afwerking M2 85.68 64,997.58 5,568,992.38
5 Pekerjaan Cat Afwerking M2 85.68 33,090.20 2,835,168.34
c KOLOM K1C
1 Pekerjaan Beton K 300 M3 21.21 1,208,976.61 25,646,020.86
2 Pekerjaan Pembesian Kg 2,737.10 15,434.15 42,244,827.40
3 Bekisting M2 102.67 393,415.00 40,389,950.98
4 Pekerjaan Afwerking M2 102.67 64,997.58 6,672,976.22
5 Pekerjaan Cat Afwerking M2 102.67 33,090.20 3,397,205.38
d KOLOM K1D
1 Pekerjaan Beton K 300 M3 2.46 1,208,976.61 2,976,500.42
2 Pekerjaan Pembesian Kg 335.30 15,434.15 5,175,132.23
3 Bekisting M2 14.42 393,415.00 5,673,044.30
4 Pekerjaan Afwerking M2 14.42 64,997.58 937,265.06
5 Pekerjaan Cat Afwerking M2 14.42 33,090.20 477,160.68 270,833,522.98

4 PEKERJAAN BALOK P - 036


a Balok B5-1 (30 X 70)
1 Beton K -250 M3 1.83 1,634,189.11 2,995,468.64
2 Pembesian Kg 436.57 15,434.15 6,738,148.60
3 Bekisting M2 14.84 403,765.00 5,992,276.37
4 Pekerjaan Afweerking M2 12.05 64,997.58 783,025.81
Page 63 of 690

5 Pekerjaan Cat Afweerking M2 12.05 33,090.20 398,637.64


b Balok B8-1 (25 X 45)
1 Beton K -250 M3 1.07 1,634,189.11 1,742,045.59
2 Pembesian Kg 257.88 15,434.15 3,980,174.04
3 Bekisting M2 10.90 403,765.00 4,401,846.03
4 Pekerjaan Afweerking M2 7.87 64,997.58 511,400.93
5 Pekerjaan Cat Afweerking M2 7.87 33,090.20 260,353.69 27,803,377.34

5 PEKERJAAN BALOK P + 0,00


a Balok B1-1 (30 X 70)
1 Beton K -250 M3 13.65 1,634,189.11 22,306,681.37
2 Pembesian Kg 3,405.32 15,434.15 52,558,281.41
3 Bekisting M2 89.70 403,765.00 36,217,720.50
4 Pekerjaan Afweerking M2 89.70 64,997.58 5,830,282.64
5 Pekerjaan Cat Afweerking M2 89.70 33,090.20 2,968,190.94
b Balok B2-1 (30 X 60)
1 Beton K -250 M3 22.36 1,634,189.11 36,533,931.78
2 Pembesian Kg 5,082.19 15,434.15 78,439,298.22
3 Bekisting M2 146.56 403,765.00 59,174,183.34
4 Pekerjaan Afweerking M2 146.56 64,997.58 9,525,784.87
5 Pekerjaan Cat Afweerking M2 146.56 33,090.20 4,849,567.35
c Balok B2'-1 (30 X 60)
1 Beton K -250 M3 0.48 1,634,189.11 787,679.15
2 Pembesian Kg 246.87 15,434.15 3,810,182.31
3 Bekisting M2 4.02 403,765.00 1,623,135.30
4 Pekerjaan Afweerking M2 3.16 64,997.58 205,522.34
5 Pekerjaan Cat Afweerking M2 3.16 33,090.20 104,631.21
d Balok B3-1 (30 X 60)
1 Beton K -250 M3 4.75 1,634,189.11 7,765,666.66
2 Pembesian Kg 1,182.01 15,434.15 18,243,381.38
3 Bekisting M2 31.15 403,765.00 12,578,087.28
4 Pekerjaan Afweerking M2 31.15 64,997.58 2,024,804.51
5 Pekerjaan Cat Afweerking M2 31.15 33,090.20 1,030,825.91
e Balok B4-1 (35 X 70)
1 Beton K -250 M3 34.94 1,634,189.11 57,093,664.99
2 Pembesian Kg 9,636.16 15,434.15 148,725,923.43
3 Bekisting M2 203.92 403,765.00 82,334,951.27
4 Pekerjaan Afweerking M2 203.92 64,997.58 13,254,175.87
5 Pekerjaan Cat Afweerking M2 203.92 33,090.20 6,747,687.40
f Balok B5-1 (30 X 70)
1 Beton K -250 M3 3.67 1,634,189.11 5,990,937.28
2 Pembesian Kg 873.15 15,434.15 13,476,312.64
3 Bekisting M2 24.09 403,765.00 9,728,313.91
4 Pekerjaan Afweerking M2 24.09 64,997.58 1,566,051.62
5 Pekerjaan Cat Afweerking M2 24.09 33,090.20 797,275.28
g Balok B6-1 (30 X 70)
1 Beton K -250 M3 1.39 1,634,189.11 2,264,986.11
2 Pembesian Kg 298.37 15,434.15 4,605,056.47
3 Bekisting M2 9.11 403,765.00 3,677,491.62
4 Pekerjaan Afweerking M2 9.11 64,997.58 591,997.93
5 Pekerjaan Cat Afweerking M2 9.11 33,090.20 301,385.54
h Balok B7-1 (25 X 45)
1 Beton K -250 M3 0.53 1,634,189.11 871,022.80
2 Pembesian Kg 115.28 15,434.15 1,779,171.64
3 Bekisting M2 3.93 403,765.00 1,588,411.51
4 Pekerjaan Afweerking M2 3.93 64,997.58 255,700.47
5 Pekerjaan Cat Afweerking M2 3.93 33,090.20 130,176.85
i Balok BA2 (25 X 50)
1 Beton K -250 M3 0.33 1,634,189.11 540,916.60
2 Pembesian Kg 46.09 15,434.15 711,344.54
3 Bekisting M2 2.46 403,765.00 994,876.96
4 Pekerjaan Afweerking M2 2.46 64,997.58 160,154.03
5 Pekerjaan Cat Afweerking M2 2.46 33,090.20 81,534.25
j Balok BA3 (25 X 50)
1 Beton K -250 M3 1.69 1,634,189.11 2,756,877.03
2 Pembesian Kg 365.71 15,434.15 5,644,453.86
3 Bekisting M2 12.56 403,765.00 5,069,269.58
4 Pekerjaan Afweerking M2 12.56 64,997.58 816,044.58
5 Pekerjaan Cat Afweerking M2 12.56 33,090.20 415,447.46
k Balok BA3' (25 X 50)
1 Beton K -250 M3 5.41 1,634,189.11 8,842,597.28
2 Pembesian Kg 1,192.84 15,434.15 18,410,533.22
3 Bekisting M2 40.26 403,765.00 16,255,175.14
4 Pekerjaan Afweerking M2 40.26 64,997.58 2,616,737.44
5 Pekerjaan Cat Afweerking M2 40.26 33,090.20 1,332,178.36
l Balok BA4 (25 X 50)
1 Beton K -250 M3 18.11 1,634,189.11 29,598,433.19
2 Pembesian Kg 4,363.38 15,434.15 67,345,123.16
3 Bekisting M2 134.76 403,765.00 54,410,160.11
4 Pekerjaan Afweerking M2 134.76 64,997.58 8,758,878.46
5 Pekerjaan Cat Afweerking M2 134.76 33,090.20 4,459,136.08
m Balok BT (25 X 45)
1 Beton K -250 M3 0.75 1,634,189.11 1,224,007.64
Page 64 of 690

2 Pembesian Kg 145.31 15,434.15 2,242,782.64


3 Bekisting M2 5.53 403,765.00 2,231,609.16
4 Pekerjaan Afweerking M2 5.53 64,997.58 359,241.61
5 Pekerjaan Cat Afweerking M2 5.53 33,090.20 182,889.54 947,818,934.99

6 PEKERJAAN PLAT P + 0,00


a Plat PL1
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 69.75 1,634,189.11 113,976,519.58
2 Pembesian Kg 12,144.56 15,434.15 187,440,898.99
3 Pekerjaan Bekisting M2 435.91 483,805.00 210,893,986.14
b Plat PL2
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 3.07 1,634,189.11 5,013,692.19
2 Pembesian Kg 568.17 15,434.15 8,769,159.27
3 Pekerjaan Bekisting M2 19.18 483,805.00 9,276,960.88
c Plat PL3
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 2.37 1,634,189.11 3,874,662.38
2 Pembesian Kg 447.55 15,434.15 6,907,538.40
3 Pekerjaan Bekisting M2 14.82 483,805.00 7,171,925.32
d Plat PL6
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 3.73 1,634,189.11 6,097,159.58
2 Pembesian Kg 688.01 15,434.15 10,618,911.28
3 Pekerjaan Bekisting M2 23.32 483,805.00 11,282,332.60
e Plat PL7
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 3.99 1,634,189.11 6,512,243.61
2 Pembesian Kg 745.96 15,434.15 11,513,181.36
3 Pekerjaan Bekisting M2 24.91 483,805.00 12,050,614.94
f Plat PL8
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 0.74 1,634,189.11 1,202,763.19
2 Pembesian Kg 143.97 15,434.15 2,221,977.40
3 Pekerjaan Bekisting M2 4.60 483,805.00 2,227,438.22
g Plat PL9
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 1.29 1,634,189.11 2,109,738.14
2 Pembesian Kg 257.45 15,434.15 3,973,521.92
3 Pekerjaan Bekisting M2 8.07 483,805.00 3,905,757.77
h Plat PL10
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 3.09 1,634,189.11 5,044,741.79
2 Pembesian Kg 576.48 15,434.15 8,897,417.06
3 Pekerjaan Bekisting M2 19.30 483,805.00 9,335,985.09
i Plat PL11
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 7.05 1,634,189.11 11,527,569.99
2 Pembesian Kg 1,278.37 15,434.15 19,730,616.07
3 Pekerjaan Bekisting M2 44.09 483,805.00 21,331,446.26
j Plat PL12
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 9.85 1,634,189.11 16,096,762.75
2 Pembesian Kg 1,740.19 15,434.15 26,858,415.23
3 Pekerjaan Bekisting M2 61.56 483,805.00 29,784,003.41
k Plat PL13
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 0.73 1,634,189.11 1,196,226.43
2 Pembesian Kg 145.00 15,434.15 2,237,951.75
3 Pekerjaan Bekisting M2 4.58 483,805.00 2,215,343.10
l Plat PL14
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 1.49 1,634,189.11 2,426,770.83
2 Pembesian Kg 295.92 15,434.15 4,567,273.67
3 Pekerjaan Bekisting M2 9.29 483,805.00 4,492,613.23
m Plat PL15
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 42.58 1,634,189.11 69,585,406.56
2 Pembesian Kg 7,670.25 15,434.15 118,383,727.30
3 Pekerjaan Bekisting M2 266.13 483,805.00 128,756,476.07
n Plat PL15'
1 Pekerjaan Beton K 250 M2 8.87 1,634,189.11 14,496,891.61
2 Pembesian Kg 2,160.45 15,434.15 33,344,740.24
3 Pekerjaan Bekisting M2 44.36 483,805.00 21,459,170.78
o Plat PL16
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 0.97 1,634,189.11 1,585,163.44
2 Pembesian Kg 163.83 15,434.15 2,528,545.93
3 Pekerjaan Bekisting M2 7.36 483,805.00 3,560,804.80
p Plat PL17
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 0.30 1,634,189.11 488,622.54
2 Pembesian Kg 54.25 15,434.15 837,333.51
3 Pekerjaan Bekisting M2 2.38 483,805.00 1,152,907.32
q Plat PL18
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 15.31 1,634,189.11 25,016,166.92
2 Pembesian Kg 2,903.96 15,434.15 44,820,169.67
3 Pekerjaan Bekisting M2 119.49 483,805.00 57,810,343.26
4 Pekerjaan Afweerking M2 215.38 64,997.58 13,999,113.09
5 Pekerjaan Cat Afweerking M2 215.38 33,090.20 7,126,934.19 1,337,736,636.97

7 KOLOM P + 0,00 - 3,60


a KOLOM K2A
1 Pekerjaan Beton K 300 M3 8.32 1,208,976.61 10,053,849.50
2 Pekerjaan Pembesian Kg 1,082.44 15,434.15 16,706,464.16
3 Bekisting M2 41.32 464,271.50 19,183,698.38
4 Pekerjaan Afwerking M2 41.32 64,997.58 2,685,699.87
Page 65 of 690

5 Pekerjaan Cat Afwerking M2 41.32 33,090.20 1,367,287.06


b KOLOM K2B
1 Pekerjaan Beton K 300 M3 21.17 1,208,976.61 25,591,616.91
2 Pekerjaan Pembesian Kg 3,020.48 15,434.15 46,618,572.26
3 Bekisting M2 109.20 464,271.50 50,698,447.80
4 Pekerjaan Afwerking M2 109.20 64,997.58 7,097,735.39
5 Pekerjaan Cat Afwerking M2 109.20 33,090.20 3,613,449.84
c KOLOM K2C
1 Pekerjaan Beton K 300 M3 26.33 1,208,976.61 31,837,190.09
2 Pekerjaan Pembesian Kg 3,720.97 15,434.15 57,430,070.86
3 Bekisting M2 130.85 464,271.50 60,748,997.23
4 Pekerjaan Afwerking M2 130.85 64,997.58 8,504,802.93
5 Pekerjaan Cat Afwerking M2 130.85 33,090.20 4,329,786.49
d KOLOM K2D
1 Pekerjaan Beton K 300 M3 3.06 1,208,976.61 3,694,632.52
2 Pekerjaan Pembesian Kg 420.22 15,434.15 6,485,676.78
3 Bekisting M2 18.38 464,271.50 8,532,381.63
4 Pekerjaan Afwerking M2 18.38 64,997.58 1,194,525.47
5 Pekerjaan Cat Afwerking M2 18.38 33,090.20 608,131.70 366,983,016.86

8 PEKERJAAN BALOK P + 3,60


a Balok B1-1 (30 X 70)
1 Beton K -250 M3 13.65 1,634,189.11 22,306,681.37
2 Pembesian Kg 3,405.32 15,434.15 52,558,281.41
3 Bekisting M2 89.70 473,676.50 42,488,782.05
b Balok B2-1 (30 X 60)
1 Beton K -250 M3 22.36 1,634,189.11 36,533,931.78
2 Pembesian Kg 5,082.19 15,434.15 78,439,298.22
3 Bekisting M2 146.56 473,676.50 69,420,133.13
c Balok B3-1 (30 X 60)
1 Beton K -250 M3 4.75 1,634,189.11 7,765,666.66
2 Pembesian Kg 1,182.01 15,434.15 18,243,381.38
3 Bekisting M2 31.15 473,676.50 14,755,970.33
d Balok B4-1 (35 X 70)
1 Beton K -250 M3 34.94 1,634,189.11 57,093,664.99
2 Pembesian Kg 9,636.16 15,434.15 148,725,923.43
3 Bekisting M2 203.92 473,676.50 96,591,164.53
e Balok B5-1 (30 X 70)
1 Beton K -250 M3 5.50 1,634,189.11 8,986,405.92
2 Pembesian Kg 1,309.72 15,434.15 20,214,476.67
3 Bekisting M2 36.14 473,676.50 17,119,616.06
f Balok B6-1 (30 X 70)
1 Beton K -250 M3 2.77 1,634,189.11 4,529,972.22
2 Pembesian Kg 596.74 15,434.15 9,210,128.37
3 Bekisting M2 18.22 473,676.50 8,628,491.12
g Balok B7-1 (25 X 45)
1 Beton K -250 M3 0.53 1,634,189.11 871,022.80
2 Pembesian Kg 115.28 15,434.15 1,779,171.64
3 Bekisting M2 3.93 473,676.50 1,863,443.35
h Balok B8-1 (25 X 45)
1 Beton K -250 M3 0.98 1,634,189.11 1,606,407.90
2 Pembesian Kg 217.89 15,434.15 3,362,931.51
3 Bekisting M2 7.25 473,676.50 3,436,049.33
i Balok BA1 (25 X 60)
1 Beton K -250 M3 1.40 1,634,189.11 2,279,693.81
2 Pembesian Kg 304.89 15,434.15 4,705,733.43
3 Bekisting M2 10.51 473,676.50 4,977,866.34
j Balok BA2 (25 X 50)
1 Beton K -250 M3 0.33 1,634,189.11 540,916.60
2 Pembesian Kg 46.09 15,434.15 711,344.54
3 Bekisting M2 2.46 473,676.50 1,167,138.90
k Balok BA3 (25 X 50)
1 Beton K -250 M3 2.25 1,634,189.11 3,676,925.50
2 Pembesian Kg 487.62 15,434.15 7,525,938.49
3 Bekisting M2 16.74 473,676.50 7,929,344.61
l Balok BA3' (25 X 50)
1 Beton K -250 M3 3.33 1,634,189.11 5,441,849.74
2 Pembesian Kg 734.06 15,434.15 11,329,561.28
3 Bekisting M2 24.78 473,676.50 11,735,335.29
m Balok BA4 (25 X 50)
1 Beton K -250 M3 18.11 1,634,189.11 29,598,433.19
2 Pembesian Kg 4,363.38 15,434.15 67,345,123.16
3 Bekisting M2 134.76 473,676.50 63,831,224.11
n Balok BT (25 X 45)
1 Beton K -250 M3 0.95 1,634,189.11 1,549,211.28
2 Pembesian Kg 177.23 15,434.15 2,735,409.84
3 Bekisting M2 7.00 473,676.50 3,313,840.79 956,925,887.06
9 PEKERJAAN PLAT P + 3,60
a Plat PL1
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 84.43 1,634,189.11 137,971,318.31
2 Pembesian Kg 14,701.31 15,434.15 226,902,146.57
3 Pekerjaan Bekisting M2 527.68 483,805.00 255,292,770.99
b Plat PL2
Page 66 of 690

1 Pekerjaan Beton K-250 + Waterprofing Inte M3 3.07 1,634,189.11 5,013,692.19


2 Pembesian Kg 568.17 15,434.15 8,769,159.27
3 Pekerjaan Bekisting M2 19.18 483,805.00 9,276,960.88
c Plat PL3
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 2.37 1,634,189.11 3,874,662.38
2 Pembesian Kg 447.55 15,434.15 6,907,538.40
3 Pekerjaan Bekisting M2 14.82 483,805.00 7,171,925.32
d Plat PL4
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 4.76 1,634,189.11 7,780,374.36
2 Pembesian Kg 833.75 15,434.15 12,868,284.30
3 Pekerjaan Bekisting M2 29.76 483,805.00 14,398,036.80
e Plat PL5
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 1.30 1,634,189.11 2,127,714.22
2 Pembesian Kg 246.60 15,434.15 3,806,061.39
3 Pekerjaan Bekisting M2 8.14 483,805.00 3,936,721.29
f Plat PL6
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 3.73 1,634,189.11 6,097,159.58
2 Pembesian Kg 688.01 15,434.15 10,618,911.28
3 Pekerjaan Bekisting M2 23.32 483,805.00 11,282,332.60
g Plat PL8
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 0.74 1,634,189.11 1,202,763.19
2 Pembesian Kg 143.97 15,434.15 2,221,977.40
3 Pekerjaan Bekisting M2 4.60 483,805.00 2,227,438.22
h Plat PL9
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 1.29 1,634,189.11 2,109,738.14
2 Pembesian Kg 257.45 15,434.15 3,973,521.92
3 Pekerjaan Bekisting M2 8.07 483,805.00 3,905,757.77
i Plat PL10
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 4.83 1,634,189.11 7,888,230.84
2 Pembesian Kg 863.52 15,434.15 13,327,681.77
3 Pekerjaan Bekisting M2 30.17 483,805.00 14,595,913.05
j Plat PL11
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 4.70 1,634,189.11 7,685,591.39
2 Pembesian Kg 852.25 15,434.15 13,153,738.90
3 Pekerjaan Bekisting M2 29.39 483,805.00 14,220,964.17
k Plat PL12
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 4.83 1,634,189.11 7,888,230.84
2 Pembesian Kg 861.13 15,434.15 13,290,763.29
3 Pekerjaan Bekisting M2 30.17 483,805.00 14,595,913.05
l Plat PL15
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 28.39 1,634,189.11 46,389,726.31
2 Pembesian Kg 5,113.50 15,434.15 78,922,479.72
3 Pekerjaan Bekisting M2 177.42 483,805.00 85,837,650.71
m Plat PL18
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 11.96 1,634,189.11 19,544,901.77
2 Pembesian Kg 2,278.58 15,434.15 35,168,007.24
3 Pekerjaan Bekisting M2 87.49 483,805.00 42,327,615.65
4 Pekerjaan Afweerking M2 157.70 64,997.58 10,249,857.87
5 Pekerjaan Cat Afweerking M2 157.70 33,090.20 5,218,192.18
n Plat PL19
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 3.76 1,634,189.11 6,151,087.82
2 Pembesian Kg 659.66 15,434.15 10,181,214.22
3 Pekerjaan Bekisting M2 23.53 483,805.00 11,383,447.85
o Plat PL20
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 0.81 1,634,189.11 1,326,961.56
2 Pembesian Kg 151.47 15,434.15 2,337,872.44
3 Pekerjaan Bekisting M2 5.08 483,805.00 2,455,310.38
p Plat PL21
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 0.43 1,634,189.11 709,238.07
2 Pembesian Kg 81.75 15,434.15 1,261,695.46
3 Pekerjaan Bekisting M2 2.71 483,805.00 1,312,079.16
q Plat PL21'
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 1.28 1,634,189.11 2,091,762.06
2 Pembesian Kg 232.54 15,434.15 3,589,103.54
3 Pekerjaan Bekisting M2 8.00 483,805.00 3,870,440.00 1,226,712,638.04

10 KOLOM P + 3,60 - 7,20


a KOLOM K3A
1 Pekerjaan Beton K 300 M3 6.11 1,208,976.61 7,389,265.05
2 Pekerjaan Pembesian Kg 735.01 15,434.15 11,344,192.85
3 Bekisting M2 38.45 464,271.50 17,853,096.26
4 Pekerjaan Afwerking M2 38.45 64,997.58 2,499,416.82
5 Pekerjaan Cat Afwerking M2 38.45 33,090.20 1,272,450.55
b KOLOM K3B
1 Pekerjaan Beton K 300 M3 15.55 1,208,976.61 18,802,004.26
2 Pekerjaan Pembesian Kg 1,743.74 15,434.15 26,913,113.85
3 Bekisting M2 97.92 464,271.50 45,461,465.28
4 Pekerjaan Afwerking M2 97.92 64,997.58 6,364,562.72
5 Pekerjaan Cat Afwerking M2 97.92 33,090.20 3,240,192.38
c KOLOM K3C
1 Pekerjaan Beton K 300 M3 19.36 1,208,976.61 23,402,160.27
2 Pekerjaan Pembesian Kg 2,327.52 15,434.15 35,923,277.37
3 Bekisting M2 121.77 464,271.50 56,534,804.83
Page 67 of 690

4 Pekerjaan Afwerking M2 121.77 64,997.58 7,914,819.92


5 Pekerjaan Cat Afwerking M2 121.77 33,090.20 4,029,426.74
d KOLOM K3D
1 Pekerjaan Beton K 300 M3 3.06 1,208,976.61 3,694,632.52
2 Pekerjaan Pembesian Kg 367.50 15,434.15 5,672,096.43
3 Bekisting M2 19.23 464,271.50 8,926,548.13
4 Pekerjaan Afwerking M2 19.23 64,997.58 1,249,708.41
5 Pekerjaan Cat Afwerking M2 19.23 33,090.20 636,225.28 289,123,459.94

11 PEKERJAAN BALOK P + 7,20


a Balok B1-2 (25 X 60)
1 Beton K -250 M3 9.90 1,634,189.11 16,178,472.20
2 Pembesian Kg 2,205.27 15,434.15 34,036,452.54
3 Bekisting M2 87.25 473,676.50 41,329,221.98
b Balok B2-2 (25 X 60)
1 Beton K -250 M3 16.68 1,634,189.11 27,258,274.38
2 Pembesian Kg 2,926.14 15,434.15 45,162,406.51
3 Bekisting M2 130.10 473,676.50 61,627,207.36
c Balok B3-2 (25 X 60)
1 Beton K -250 M3 3.05 1,634,189.11 4,985,910.98
2 Pembesian Kg 424.95 15,434.15 6,558,711.17
3 Bekisting M2 22.98 473,676.50 10,886,980.68
d Balok B4-2 (25 X 70)
1 Beton K -250 M3 26.57 1,634,189.11 43,420,404.69
2 Pembesian Kg 4,809.17 15,434.15 74,225,451.16
3 Bekisting M2 241.27 473,676.50 114,281,560.77
e Balok BA-5 (20 X 45)
1 Beton K -250 M3 3.75 1,634,189.11 6,133,111.74
2 Pembesian Kg 547.53 15,434.15 8,450,660.15
3 Bekisting M2 32.53 473,676.50 15,406,801.84 509,941,628.14

12 PEKERJAAN PLAT P + 7,20


a Plat PL22
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 44.70 1,634,189.11 73,051,521.66
2 Pembesian Kg 5,113.50 15,434.15 78,922,479.72
3 Pekerjaan Bekisting M2 279.39 483,805.00 135,170,278.95
b Plat PL23
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 10.89 1,634,189.11 17,788,148.48
2 Pembesian Kg 1,234.18 15,434.15 19,048,565.55
3 Pekerjaan Bekisting M2 65.64 483,805.00 31,757,444.01
4 Pekerjaan Afweerking M2 138.53 64,997.58 9,003,854.32
5 Pekerjaan Cat Afweerking M2 138.53 33,090.20 4,583,853.05
c Plat PL24
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 3.93 1,634,189.11 6,423,997.40
2 Pembesian Kg 444.32 15,434.15 6,857,747.83
3 Pekerjaan Bekisting M2 24.57 483,805.00 11,887,088.85
4 Pekerjaan Afweerking M2 51.76 64,997.58 3,364,274.58
5 Pekerjaan Cat Afweerking M2 51.76 33,090.20 1,712,748.75
d Plat PL25
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 4.10 1,634,189.11 6,693,638.60
2 Pembesian Kg 457.69 15,434.15 7,064,040.68
3 Pekerjaan Bekisting M2 25.60 483,805.00 12,385,408.00
4 Pekerjaan Afweerking M2 56.32 64,997.58 3,660,663.53
5 Pekerjaan Cat Afweerking M2 56.32 33,090.20 1,863,640.06
e Plat PL26
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 13.36 1,634,189.11 21,837,669.10
2 Pembesian Kg 1,467.76 15,434.15 22,653,674.31
3 Pekerjaan Bekisting M2 83.52 483,805.00 40,407,393.60
4 Pekerjaan Afweerking M2 176.26 64,997.58 11,456,212.90
5 Pekerjaan Cat Afweerking M2 176.26 33,090.20 5,832,346.29 533,426,690.20
13 KOLOM P +( 7,20 - 9,50) & (7,20 - 8,30)
a KOLOM K4A
1 Pekerjaan Beton K 300 M3 2.60 1,208,976.61 3,146,966.12
2 Pekerjaan Pembesian Kg 308.30 15,434.15 4,758,333.01
3 Bekisting M2 15.83 464,271.50 7,351,274.93
4 Pekerjaan Afwerking M2 15.83 64,997.58 1,029,171.63
5 Pekerjaan Cat Afwerking M2 15.83 33,090.20 523,950.23
b KOLOM K4B
1 Pekerjaan Beton K 300 M3 4.67 1,208,976.61 5,644,711.80
2 Pekerjaan Pembesian Kg 527.14 15,434.15 8,136,019.57
3 Bekisting M2 25.45 464,271.50 11,814,316.86
4 Pekerjaan Afwerking M2 25.45 64,997.58 1,653,993.34
5 Pekerjaan Cat Afwerking M2 25.45 33,090.20 842,046.32
c KOLOM K4C
1 Pekerjaan Beton K 300 M3 3.17 1,208,976.61 3,830,037.91
2 Pekerjaan Pembesian Kg 332.19 15,434.15 5,127,054.85
3 Bekisting M2 13.57 464,271.50 6,301,092.80
4 Pekerjaan Afwerking M2 13.57 64,997.58 882,147.11
5 Pekerjaan Cat Afwerking M2 13.57 33,090.20 449,100.19
Page 68 of 690

d KOLOM K4D
1 Pekerjaan Beton K 300 m3 1.30 1,208,976.61 1,572,878.57
2 Pekerjaan Pembesian Kg 154.15 15,434.15 2,379,158.79
3 Bekisting M2 7.92 464,271.50 3,675,637.47
4 Pekerjaan Afwerking M2 7.92 64,997.58 514,585.82
5 Pekerjaan Cat Afwerking M2 7.92 33,090.20 261,975.11 69,894,452.42
14 PEKERJAAN BALOK P + 8,30
a Balok B1-3 (25 X 50)
1 Beton K -250 M3 14.12 1,634,189.11 23,068,213.50
2 Pembesian Kg 3,401.02 15,434.15 52,491,852.83
3 Bekisting M2 154.45 473,676.50 73,161,230.13
b Balok B2-3 (25 X 50)
1 Beton K -250 M3 1.66 1,634,189.11 2,706,217.17
2 Pembesian Kg 260.99 15,434.15 4,028,189.68
3 Bekisting M2 16.57 473,676.50 7,846,451.22
c Balok BA6 (20 X 45)
1 Beton K -250 M3 1.30 1,634,189.11 2,117,909.09
2 Pembesian Kg 287.90 15,434.15 4,443,491.79
3 Bekisting M2 16.85 473,676.50 7,980,501.67
d Balok BA7 (20 X 30)
1 Beton K -250 M3 0.36 1,634,189.11 594,844.84
2 Pembesian Kg 73.18 15,434.15 1,129,424.79
3 Bekisting M2 6.07 473,676.50 2,875,216.36 182,443,543.06

15 PEKERJAAN PLAT TALANG AIR BETON + 8,30


a Plat PL27
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 7.53 1,634,189.11 12,308,712.39
2 Pembesian Kg 742.32 15,434.15 11,457,001.06
3 Pekerjaan Bekisting M2 51.06 483,805.00 24,701,631.89
b Plat PL28
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 5.38 1,634,189.11 8,795,205.80
2 Pembesian Kg 534.14 15,434.15 8,243,919.71
3 Pekerjaan Bekisting M2 39.06 483,805.00 18,898,390.91
c Plat PL29
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 6.56 1,634,189.11 10,726,817.33
2 Pembesian Kg 674.46 15,434.15 10,409,716.81
3 Pekerjaan Bekisting M2 47.54 483,805.00 22,998,638.29
4 Pekerjaan Afweerking M2 60.72 64,997.58 3,946,912.85
5 Pekerjaan Cat Afweerking M2 60.72 33,090.20 2,009,369.30
d Plat PL30
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 15.16 1,634,189.11 24,774,306.93
2 Pembesian Kg 1,557.72 15,434.15 24,042,115.01
3 Pekerjaan Bekisting M2 130.46 483,805.00 63,119,135.52
4 Pekerjaan Afweerking M2 153.79 64,997.58 9,996,107.33
5 Pekerjaan Cat Afweerking M2 153.79 33,090.20 5,089,008.04
e Plat PL31
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 3.72 1,634,189.11 6,072,646.74
2 Pembesian Kg 381.86 15,434.15 5,893,653.65
3 Pekerjaan Bekisting M2 31.98 483,805.00 15,472,567.71
4 Pekerjaan Afweerking M2 37.70 64,997.58 2,450,408.65
5 Pekerjaan Cat Afweerking M2 37.70 33,090.20 1,247,500.54
f Plat PL32
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 16.82 1,634,189.11 27,491,963.42
2 Pembesian Kg 1,728.64 15,434.15 26,680,073.62
3 Pekerjaan Bekisting M2 144.78 483,805.00 70,044,320.29
4 Pekerjaan Afweerking M2 170.67 64,997.58 11,092,876.44
5 Pekerjaan Cat Afweerking M2 170.67 33,090.20 5,647,372.07
g Plat PL33
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 17.77 1,634,189.11 29,041,174.70
2 Pembesian Kg 1,826.00 15,434.15 28,182,711.60
3 Pekerjaan Bekisting M2 152.93 483,805.00 73,989,266.26
4 Pekerjaan Afweerking M2 180.28 64,997.58 11,717,633.15
5 Pekerjaan Cat Afweerking M2 180.28 33,090.20 5,965,435.08
h Plat PL34
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 8.13 1,634,189.11 13,281,054.91
2 Pembesian Kg 835.11 15,434.15 12,889,243.87
3 Pekerjaan Bekisting M2 69.94 483,805.00 33,838,773.12
4 Pekerjaan Afweerking M2 82.45 64,997.58 5,358,985.21
5 Pekerjaan Cat Afweerking M2 82.45 33,090.20 2,728,253.90 650,602,904.08

16 PEKERJAAN BALOK P + 8,40


a Balok B1-4 (25 X 60)
1 Beton K -250 M3 0.99 1,634,189.11 1,611,310.46
2 Pembesian Kg 178.59 15,434.15 2,756,446.59
3 Bekisting M2 10.09 473,676.50 4,777,027.50
b Balok B2-4 (25 X 60)
1 Beton K -250 M3 0.95 1,634,189.11 1,550,845.47
2 Pembesian Kg 164.35 15,434.15 2,536,602.55
3 Bekisting M2 9.71 473,676.50 4,597,504.11
c Balok B3-4 (25 X 40)
1 Beton K -250 M3 0.30 1,634,189.11 495,159.30
2 Pembesian Kg 99.57 15,434.15 1,536,793.75
3 Bekisting M2 3.65 473,676.50 1,726,550.84
Page 69 of 690

d Balok B4-4 (25 X 40)


1 Beton K -250 M3 0.68 1,634,189.11 1,107,980.22
2 Pembesian Kg 169.16 15,434.15 2,610,856.25
3 Bekisting M2 8.15 473,676.50 3,858,095.09 29,165,172.13

17 PEKERJAAN PLAT P + 8,40


a Plat Pet
1 Pekerjaan Beton K 250 M3 8.85 1,634,189.11 14,464,207.83
2 Pembesian Kg 727.58 15,434.15 11,229,547.99
3 Pekerjaan Bekisting M2 57.33 483,805.00 27,735,573.04
4 Pekerjaan Afweerking M2 74.62 64,997.58 4,850,249.18
5 Pekerjaan Cat Afweerking M2 74.62 33,090.20 2,469,256.90 60,748,834.93

18 PEKERJAAN BALOK P + 9,50


a Balok B1-4 (25 X 60)
1 Beton K -250 M3 0.99 1,634,189.11 1,611,310.46
2 Pembesian Kg 181.05 15,434.15 2,794,352.86
3 Bekisting M2 10.09 473,676.50 4,777,027.50
b Balok B3-4 (25 X 40)
1 Beton K -250 M3 0.68 1,634,189.11 1,107,980.22
2 Pembesian Kg 207.67 15,434.15 3,205,209.93
3 Bekisting M2 8.15 473,676.50 3,858,095.09
c Balok B2-4 (25 X 40)
1 Beton K -250 M3 0.30 1,634,189.11 495,159.30
2 Pembesian Kg 80.63 15,434.15 1,244,486.38
3 Bekisting M2 3.65 473,676.50 1,726,550.84 20,820,172.59
19 PEKERJAAN PLAT P + 9,50
a Plat Talang air Beton
1 Pekerjaan Beton K-250 + Waterprofing Inte M3 12.75 1,634,189.11 20,831,008.60
2 Pembesian Kg 1,968.23 15,434.15 30,377,957.05
3 Pekerjaan Bekisting M2 118.30 483,805.00 57,234,615.31
4 Pekerjaan Afweerking M2 118.30 64,997.58 7,689,278.33
5 Pekerjaan Cat Afweerking M2 118.30 33,090.20 3,914,603.75 120,047,463.05

20 PEKERJAAN TANGGA
PEKERJAAN TANGGA 1 LANTAI DASAR ( 2 Unit)
a Pekerjaan Beton tangga
1 Beton K 250 M3 2.03 1,634,189.11 3,323,940.65
2 Pembesian Kg 424.15 15,434.15 6,546,332.99
3 Bekisting M2 18.20 436,991.50 7,953,245.30
b Pekerjaan Balok Tangga BT (20 x 45)
1 Beton K -250 M3 0.67 1,634,189.11 1,101,443.46
2 Pembesian Kg 101.80 15,434.15 1,571,134.73
3 Bekisting M2 8.25 436,991.50 3,605,179.88
4 Pekerjaan Afweerking M2 8.25 64,997.58 536,230.01
5 Pekerjaan Cat Afweerking M2 8.25 33,090.20 272,994.15
c Pekerjaan Beton Bordes
1 Beton K 250 M3 1.47 1,634,189.11 2,398,989.62
2 Pembesian Kg 350.04 15,434.15 5,402,631.60
3 Bekisting M2 11.18 436,991.50 4,884,690.99
4 Pekerjaan Afweerking M2 11.18 64,997.58 726,542.91
5 Pekerjaan Cat Afweerking M2 11.18 33,090.20 369,882.26
d Pekerjaan Beton Tanjakan Tangga
1 Beton K 250 M3 1.32 1,634,189.11 2,157,129.63
2 Pembesian Kg 115.04 15,434.15 1,775,544.62
3 Bekisting M2 16.29 436,991.50 7,118,591.54
4 Pekerjaan Afweerking M2 16.29 64,997.58 1,058,810.53
5 Pekerjaan Cat Afweerking M2 16.29 33,090.20 539,039.36 51,342,354.20

PEKERJAAN TANGGA 1 LANTAI 1 ( 2 Unit)


a Pekerjaan Beton tangga
1 Beton K 250 M3 2.68 1,634,189.11 4,382,895.20
2 Pembesian Kg 546.53 15,434.15 8,435,287.74
3 Bekisting M2 24.01 436,991.50 10,492,165.92
b Pekerjaan Balok Tangga BT (20 x 45)
1 Beton K -250 M3 0.67 1,634,189.11 1,101,443.46
2 Pembesian Kg 101.80 15,434.15 1,571,134.73
3 Bekisting M2 8.25 436,991.50 3,605,179.88
4 Pekerjaan Afweerking M2 8.25 64,997.58 536,230.01
5 Pekerjaan Cat Afweerking M2 8.25 33,090.20 272,994.15
c Pekerjaan Beton Bordes
1 Beton K 250 M3 1.53 1,634,189.11 2,503,577.72
2 Pembesian Kg 365.11 15,434.15 5,635,193.37
3 Bekisting M2 11.30 436,991.50 4,939,751.92
4 Pekerjaan Afweerking M2 11.30 64,997.58 734,732.61
5 Pekerjaan Cat Afweerking M2 11.30 33,090.20 374,051.62
d Pekerjaan Beton Tanjakan Tangga
1 Beton K 250 M3 1.67 1,634,189.11 2,732,364.19
2 Pembesian Kg 145.72 15,434.15 2,249,002.60
3 Bekisting M2 20.63 436,991.50 9,016,882.61
4 Pekerjaan Afweerking M2 20.63 64,997.58 1,341,160.00
5 Pekerjaan Cat Afweerking M2 20.63 33,090.20 682,783.19 60,606,830.91
Page 70 of 690

PEKERJAAN TANGGA 2 ( 1 Unit)


a Pekerjan Plat Pendestal Tangga
1 Pekerjaan Beton K 250 M3 0.36 1,634,189.11 594,844.84
2 Pekerjaan Pembesian Kg 96.59 15,434.15 1,490,753.68
3 Bekisting M2 4.19 436,991.50 1,828,809.43
4 Pekerjaan Afweerking M2 4.19 64,997.58 272,014.86
5 Pekerjaan Cat Afweerking M2 4.19 33,090.20 138,482.49
b Pekerjaan Beton tangga
1 Beton K 250 M3 0.54 1,634,189.11 877,559.55
2 Pembesian Kg 101.83 15,434.15 1,571,721.23
3 Bekisting M2 5.28 436,991.50 2,306,441.14
4 Pekerjaan Afweerking M2 5.28 64,997.58 343,057.21
5 Pekerjaan Cat Afweerking M2 5.28 33,090.20 174,650.08
c Pekerjaan Beton Tanjakan Tangga
1 Beton K 250 M3 0.36 1,634,189.11 594,844.84
2 Pembesian Kg 31.76 15,434.15 490,173.17
3 Bekisting M2 4.59 436,991.50 2,005,790.99
4 Pekerjaan Afweerking M2 4.59 64,997.58 298,338.88
5 Pekerjaan Cat Afweerking M2 4.59 33,090.20 151,884.02 13,139,366.38

PEKERJAAN TANGGA 3 ( 1 Unit)


a Pekerjan Plat Pendestal Tangga
1 Pekerjaan Beton K 250 M3 0.24 1,634,189.11 392,205.39
2 Pekerjaan Pembesian Kg 77.02 15,434.15 1,188,707.36
3 Bekisting M2 2.64 436,991.50 1,153,657.56
b Pekerjaan Beton tangga
1 Beton K 250 M3 1.19 1,634,189.11 1,944,685.04
2 Pembesian Kg 219.35 15,434.15 3,385,465.37
3 Bekisting M2 11.11 436,991.50 4,854,975.57
4 Pekerjaan Afweerking M2 11.11 64,997.58 722,123.08
5 Pekerjaan Cat Afweerking M2 11.11 33,090.20 367,632.12
c Pekerjaan Beton Tanjakan Tangga
1 Beton K 250 M3 0.81 1,634,189.11 1,323,693.18
2 Pembesian Kg 70.58 15,434.15 1,089,280.57
3 Bekisting M2 9.81 436,991.50 4,286,886.62 20,709,311.85

PEKERJAAN TANGGA 3 ( 1 Unit)


a Pekerjaan Beton tangga
1 Beton K 250 M3 1.07 1,634,189.11 1,743,679.78
2 Pembesian Kg 196.62 15,434.15 3,034,631.70
3 Bekisting M2 10.08 436,991.50 4,403,563.35
4 Pekerjaan Afweerking M2 10.08 64,997.58 654,980.58
5 Pekerjaan Cat Afweerking M2 10.08 33,090.20 333,449.95
b Pekerjaan Beton Bordes
1 Beton K 250 M3 0.49 1,634,189.11 794,215.91
2 Pembesian Kg 71.64 15,434.15 1,105,733.37
3 Bekisting M2 3.24 436,991.50 1,415,852.46
4 Pekerjaan Afweerking M2 3.24 64,997.58 210,592.15
5 Pekerjaan Cat Afweerking M2 3.24 33,090.20 107,212.25
c Pekerjaan Beton Tanjakan Tangga
1 Beton K 250 M3 0.68 1,634,189.11 1,111,248.60
2 Pembesian Kg 59.28 15,434.15 914,998.15
3 Bekisting M2 8.32 436,991.50 3,634,021.31 19,464,179.56
`
13,916,635,551.62

14,030,555,240.32
RENCANA ANGGARAN BIAYA
ARSITEKTUR LANTAI DASAR

KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATUR


PEKERJAAN : PENYUSUNAN DED GEDUNG KANTOR BPMPTSP KOTA PADANG
LOKASI : AIE PACAH - PADANG
TAHUN ANGGARAN : 2018

HARGA JUMLAH TOTAL


NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA HARGA
(Rp.) (Rp.) (Rp.)
II PEKERJAAN AKSITEKTUR LANTAI DASAR
A PEKERJAAN DINDING BATA
a DINDING BIDANG LUAR
1 Pas. Batu Bata 1 : 2 ( 1/2 Bata) M2 154.08 149,267.70 22,999,764.29
2 Pas. Plasteran 1 : 2 M2 308.17 83,656.33 25,780,202.92
3 Pas. Acian 1 : 2 M2 308.17 75,750.95 23,344,019.01
4 Pas. Cat Dinding Batu Bata M2 308.17 33,090.20 10,197,340.75
5 Pekerjaan Kolom Praktis 13 x 13 cm
a Beton K 175 M3 1.24 847,285.37 1,050,633.86
b Pembesian Kg 162.98 15,434.15 2,515,457.77
c Bekisting M2 19.21 393,415.00 7,557,502.15
d Afweerking M2 14.18 64,997.58 921,665.64

b DINDING BIDANG DALAM


1 Pas. Batu Bata 1 : 2 ( 1/2 Bata) M2 25.78 149,267.70 3,848,419.84
2 Pas. Batu Bata 1 : 4 ( 1/2 Bata) M2 84.70 142,383.80 12,059,836.67
3 Pas. Plasteran 1 : 2 M2 51.56 83,656.33 4,313,654.84
4 Pas. Plasteran 1 : 4 M2 169.40 69,944.06 11,848,453.48
5 Pas. Acian 1 : 2 M2 51.56 75,750.95 3,906,022.03
6 Pas. Acian 1 : 4 M2 169.40 75,750.95 12,832,135.31
7 Pas. Cat Dinding Batu Bata M2 220.96 33,090.20 7,311,709.86
8 Pekerjaan Kolom Praktis 13 x 13 cm
a Beton K 175 M3 0.75 847,285.37 635,464.03
b Pembesian Kg 94.37 15,434.15 1,456,520.74
c Bekisting M2 11.62 393,415.00 4,571,482.30
d Afweerking M2 11.62 64,997.58 755,271.84

157,905,557.31
Jumlah

B PEKERJAAN PINTU DAN JENDELA


a Type P12 ( 1 Unit )
1 Kuzen alumanium M1 10.30 153,846.43 1,584,618.18
2 Pas. Pintu Kaca tebal 5 mm + Rangka Alumunium M2 1.89 691,305.25 1,306,566.92
3 Engsel Pintu Bh 3.00 47,519.15 142,557.45
4 Kunci Pintu Bh 1.00 328,049.00 328,049.00
5 Handel Pintu Stainlless Bh 2.00 149,811.75 299,623.50
6 Pas. Jendela Kaca tebal 5 mm + Rangka Alumunium M2 1.50 139,979.15 209,968.73
7 Engsel Jendela Bh 4.00 30,946.50 123,786.00
8 Grendel Jendela Bh 4.00 24,472.58 97,890.30
9 Hak Angin Jendela Bh 4.00 37,012.75 148,051.00
10 Hendel Jendela Bh 2.00 38,307.50 76,615.00

HARGA JUMLAH TOTAL


NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA HARGA
(Rp.) (Rp.) (Rp.)
b Type P13 ( 4 Unit )
1 Kuzen alumanium M1 61.60 153,846.43 9,476,939.78
2 Pas. Pintu Kaca tebal 5 mm + Rangka Alumunium M2 7.56 691,305.25 5,226,267.69
3 Engsel Pintu Bh 12.00 47,519.15 570,229.80
4 Kunci Pintu Bh 4.00 328,049.00 1,312,196.00
5 Handel Pintu Stainlless Bh 8.00 149,811.75 1,198,494.00
6 Pas. Jendela Kaca tebal 5 mm + Rangka Alumunium M2 12.00 139,979.15 1,679,749.80
7 Engsel Jendela Bh 32.00 30,946.50 990,288.00
8 Grendel Jendela Bh 32.00 24,472.58 783,122.40
9 Hak Angin Jendela Bh 32.00 37,012.75 1,184,408.00
10 Hendel Jendela Bh 32.00 38,307.50 1,225,840.00

c Type P14 ( 1 Unit )


1 Kuzen alumanium M1 12.85 153,846.43 1,976,926.56
2 Pas. Pintu Kaca tebal 5 mm + Rangka Alumunium M2 1.89 691,305.25 1,306,566.92
3 Engsel Pintu Bh 3.00 47,519.15 142,557.45
4 Kunci Pintu Bh 1.00 328,049.00 328,049.00
5 Handel Pintu Stainlless Bh 2.00 149,811.75 299,623.50
6 Pas. Jendela Kaca tebal 5 mm + Rangka Alumunium M2 2.25 139,979.15 314,953.09
7 Engsel Jendela Bh 6.00 30,946.50 185,679.00
8 Grendel Jendela Bh 6.00 24,472.58 146,835.45
9 Hak Angin Jendela Bh 6.00 37,012.75 222,076.50
10 Hendel Jendela Bh 6.00 38,307.50 229,845.00

d Type P17
Pas. ( 3Pintu
Daun Unit Lapis
) Plat besi t. 4 mm + Rangka
1 Besi Hollow + Accesoriess M2 12.75 938,536.50 11,966,340.38

e Type J6 ( 25 Unit )
1 Kuzen alumanium M1 135.00 153,846.43 20,769,267.38
2 Pas. Jalusi Alumunium Ventilasi M2 15.75 550,000.00 8,662,500.00

f Type J10 ( 2 Unit )


1 Kuzen alumanium M1 18.00 153,846.43 2,769,235.65
2 Pas. Jendela Kaca tebal 5 mm + Rangka Alumunium M2 4.50 139,979.15 629,906.18
3 Engsel Jendela Bh 6.00 30,946.50 185,679.00
4 Grendel Jendela Bh 6.00 24,472.58 146,835.45
5 Hak Angin Jendela Bh 6.00 37,012.75 222,076.50
6 Hendel Jendela Bh 6.00 38,307.50 229,845.00

g Type J11 ( 1 Unit )


1 Kuzen alumanium M1 7.09 153,846.43 1,090,771.15
2 Pas. Jendela Kaca tebal 5 mm + Rangka Alumunium M2 1.90 139,979.15 265,960.39
3 Engsel Jendela Bh 4.00 30,946.50 123,786.00
4 Grendel Jendela Bh 4.00 24,472.58 97,890.30
5 Hak Angin Jendela Bh 4.00 37,012.75 148,051.00
6 Hendel Jendela Bh 4.00 38,307.50 153,230.00
80,579,748.38

HARGA JUMLAH TOTAL


NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA HARGA
(Rp.) (Rp.) (Rp.)
C PEKERJAAN PLAFOND
a Plafond GRC Plafond Primer Hollow 40.20.2 jarak
Pas. Rangka
1 60 cm dan Skunder Hollow 40.40.2 jarak 80 cm M2 87.39 92,902.75 8,118,771.32
2 Plafond GRC t= 9 m M2 87.39 54,518.63 4,764,382.64
3 Pas List Plafond GRC T 10 cm M1 69.80 43,682.75 3,049,055.95
4 Cat Plafond GRC dan List Plafond M2 94.37 37,688.38 3,556,651.95

b Plafond Gypsum
Pas. Rangka Plafond Primer Hollow 40.20.2 jarak
1 60 cm dan Skunder Hollow 40.40.2 jarak 80 cm M2 35.77 92,902.75 3,323,131.37
2 Plafond Gypsum t= 9 mm M2 35.77 54,518.63 1,950,131.22
3 Pas List Plafond Gypsum T 10 cm M1 35.77 43,682.75 1,562,531.97
4 Cat Plafond Gypsum dan List Plafond M2 39.84 37,688.38 1,501,504.86

c Plafond Expose Afwerking


1 Pas. Afweerking Plafond Expose M2 990.01 64,997.58 64,348,251.01
2 Cat Plafond Expose M2 990.01 37,688.38 37,311,868.13
129,486,280.41

D PEKERJAAN LANTAI
a Lantai Granite & Keramik
1 Urugan Tanah tebal 10 cm M3 12.85 99,412.50 1,277,460.57
2 Lantai kerja K-100 tebal 5 cm M3 6.43 924,266.42 5,938,457.99
3 Pas. Granite 60 x 60 cm M2 49.21 475,040.91 23,377,713.14
4 Pas Keramik Unpolished 30 x 30 cm M2 79.29 328,281.59 26,029,118.79
56,622,750.49

E PEKERJAAN FINISING TANGGA DAN RAM


a Tangga Detail A
1 Granite 60 x 60 cm (Anak Tangga Step 1 dan 2) M2 7.74 475,040.91 3,676,816.62
2 Nosing 10 x 60 cm (anak tangga step 1 dan 2) M1 23.80 75,000.00 1,785,000.00
3 Granite 60 x 60 cm (Bordes) M2 4.49 475,040.91 2,132,933.67
4 Plint Granitesiap
Accesories+ 15 xpasang
60 cm (anak
(anak Tangga
tangga Step 1 dan 2) M2 1.87 475,040.91 887,851.46
5 2) M1 18.10 850,000.00 15,385,000.00
6 Pengecatan Tangga M2 12.69 37,688.38 478,265.48

b Tangga Detail B
1 Granite 60 x 60 cm (Anak Tangga Step 1 dan 2) M2 7.74 475,040.91 3,676,816.62
2 Nosing 10 x 60 cm (anak tangga step 1 dan 2) M1 23.80 75,000.00 1,785,000.00
3 Granite 60 x 60 cm (Bordes) M2 4.49 475,040.91 2,132,933.67
4 Plint Granite 15 x 60 cm (anak tangga Step 1 dan 2) M2 1.87 475,040.91 887,851.46
5 2) M1 18.10 850,000.00 15,385,000.00
6 Pengecatan Tangga M2 12.69 37,688.38 478,265.48

HARGA JUMLAH TOTAL


NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA HARGA
(Rp.) (Rp.) (Rp.)
c Tangga Detail C
1 Granite 60 x 60 cm (Anak Tangga Step 1 dan 2) M2 9.88 475,040.91 4,693,404.17
2 Nosing 10 x 60 cm (anak tangga step 1 dan 2) M1 28.00 75,000.00 2,100,000.00
3 Granite 60 x 60 cm (Tapak Tangga) M2 5.46 475,040.91 2,593,723.35
4 Plint Granite 15 x 60 cm (anak tangga Step 1 dan 2) M2 2.30 475,040.91 1,090,931.44
5 2) M1 9.80 850,000.00 8,330,000.00
6 Pengecatan Tangga M2 9.10 37,688.38 342,964.21
d Tangga Detail D
1 Keramik Unpolished 30 x 30 cm M2 5.00 328,281.59 1,641,407.94
2 Pas. Tangga Batu Kali 1 : 4 M3 1.14 309,077.12 352,347.92
3 Keramik Unpolished 30 x 30 cm (anak tangga) M2 2.41 328,281.59 791,158.63
4 Nosing 10 x 30 cm (anak tangga) M1 7.20 50,000.00 360,000.00
e Tangga Detail E (2 Unit)
1 Keramik Unpolished 30 x 30 cm M2 2.80 328,281.59 919,188.45
2 Keramik Unpolished 30 x 30 cm (anak tangga) M2 8.35 328,281.59 2,741,151.26
3 Nosing 10 x 30 cm (anak tangga) M1 23.10 50,000.00 1,155,000.00
f Ram Detail F
1 Timbunan Tanah M3 12.40 99,412.50 1,232,715.00
2 Coran K 225 M3 2.52 893,536.11 2,251,710.99
3 Tulangan Coran K 225 dengan Wiremash M6 2 lapis M2 18.09 50,000.00 904,500.00
4 Pas. Batu Bata 1 : 2 Pembatas Ram M2 11.38 149,267.70 1,698,666.43
5 Plesteran 1 : 2 Dinding Ram M2 19.26 75,750.95 1,458,963.31
6 Acian M2 19.26 42,579.90 820,088.87
7 Pengecatan M2 19.26 33,090.20 637,317.25
g Ram Detail G
1 Timbunan Tanah M3 295.76 99,412.50 29,402,241.00
2 Coran K 225 M3 23.90 893,536.11 21,355,512.93
3 Tulangan Coran K 225 dengan Wiremash M6 2 lapis M2 199.31 50,000.00 9,965,500.00
4 Pas. Keramik 30 x 30 cm Motif Batu Alam M2 97.23 262,293.38 25,502,785.39
5 Pas. Batu Kali 1 : 4 Pedestrian M2 31.17 309,077.12 9,633,933.83
6 Tangga Batu Kali Kecil (2 Unit)
a Pas. Batu Kali 1: 4 M3 2.07 309,077.12 638,862.41
b Pas. Lantai Kerja Beton K-100 t. 5 cm M3 0.40 924,266.42 372,941.50
c Pas. Keramik 30 x30 cm Unpolished M2 8.07 262,293.38 2,116,707.58
d Pas. Nosing Keramik 30 x30 cm Unpolished M1 12.00 50,000.00 600,000.00
7 Tangga Batu Kali Besar
a Pas. Batu Kali 1: 4 M3 19.87 309,077.12 6,141,606.55
b Pas. Lantai Kerja Beton K-100 t. 5 cm M3 1.42 924,266.42 1,309,694.77
c Pas. Keramik 30 x30 cm Unpolished M2 28.34 262,293.38 7,433,446.86
d Pas. Nosing Keramik 30 x30 cm Unpolished M1 58.77 50,000.00 2,938,500.00
8 Pot Bunga Panjang
a Pas. Batu Bata 1 : 2 (1/2 Bata) M2 241.44 149,267.70 36,039,193.49
b Plesteran 1 : 2 M2 109.03 75,750.95 8,259,126.17
c Pas. Keramik Motif Batu Alam 30 x 30 cm M2 109.03 262,293.38 28,597,847.28
d Pas. List Profil Beton M1 119.76 75,000.00 8,982,000.00
e Urugan Tanah Timbunan + Tanah Humus M3 23.02 99,412.50 2,288,475.75
f Pas. Bunga Teh - Tehan M1 57.88 15,000.00 868,200.00

HARGA JUMLAH TOTAL


NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA HARGA
(Rp.) (Rp.) (Rp.)
9 Pot Bunga Kotak
a Pas. Batu Bata 1 : 2 (1/2 Bata) M2 50.56 149,267.70 7,546,974.91
b Plesteran 1 : 2 M2 46.08 75,750.95 3,490,603.81
c Pas. Keramik Motif Batu Alam 30 x 30 cm M2 27.52 262,293.38 7,218,313.83
d Pas. List Profil Beton M1 34.40 75,000.00 2,580,000.00
e Urugan Tanah Timbunan + Tanah Humus M3 28.56 99,412.50 2,839,221.00
f Pas. Bunga Teh - Tehan M1 6.00 15,000.00 90,000.00

h Tangga Detail H (2 Unit)


1 pasang M1 8.00 450,000.00 3,600,000.00

i Pagar Reilling Detail I Lantai 2


1 Accesories+ siap pasang M1 11.49 450,000.00 5,170,500.00
319,789,162.73

F PEKERJAAN DRAINASE
a Drainase Luar A
1 Pas. Batu Kali 1 : 4 M3 104.57 309,077.12 32,321,319.48
2 Pas. Plasteran 1 : 2 M2 348.58 75,750.95 26,405,175.53
3 Pas. Acian 1 : 2 M2 348.58 42,579.90 14,842,450.45
4 Pas. Besi Siku 50 x 50 x 9 Kg 2,042.97 15,434.15 31,531,580.74
5 Pembesian Kg 2,287.27 15,434.15 35,302,068.27

b Drainase Luar B
1 Pas. Batu Kali 1 : 4 M3 32.11 309,077.12 9,923,350.55
2 Pas. Plasteran 1 : 2 M2 107.02 75,750.95 8,106,965.23
3 Pas. Acian 1 : 2 M2 107.02 42,579.90 4,556,956.25
4 Pekerjaan Plat Drainase
a Beton K 225 M3 11.16 893,536.11 9,971,862.94
b Pembesian Kg 1,214.15 15,434.15 18,739,373.22
c Bekisting M2 74.44 667,664.80 49,700,967.71

c Drainase Dalam C
1 Galian Saluran M3 13.80 72,450.00 999,708.06
2 Pas. Lantai Kerja Beton K-225 M3 5.11 893,536.11 4,566,496.69
3 Pas.Batu Bata 1 : 2 (1/2 Bata) M2 170.35 149,267.70 25,428,200.50
4 Pas. Plasteran 1 : 2 M2 228.27 75,750.95 17,291,898.31
5 Pas. Acian 1 : 2 M2 228.27 42,579.90 9,719,842.36
6 Pas. Besi Siku 50 x 50 x 9 Kg 2,296.36 15,434.15 35,442,340.62
7 Pembesian kg 1,209.86 15,434.15 18,673,160.72

353,523,717.63

HARGA JUMLAH TOTAL


NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA HARGA
(Rp.) (Rp.) (Rp.)
G PEKERJAAN POT BUNGA KELILING DINDING BANGUNAN
a Lantai 1
1 Pas. Batu Bata 1 : 2 (1/2 Bata) M2 50.58 149,267.70 7,549,960.27
2 Plesteran 1 : 2 M2 67.44 75,750.95 5,108,644.12
3 Acian M2 67.44 42,579.90 2,871,588.46
4 Cat dinding Batu Bata M2 67.44 33,090.20 2,231,603.09
5 Urugan Tanah Timbunan + Tanah Humus M3 13.91 99,412.50 1,382,778.17
6 Pas. Tumbuahan rambat M1 84.30 15,000.00 1,264,500.00

b Lantai 2
1 Pas. Batu Bata 1 : 2 (1/2 Bata) M2 55.80 149,267.70 8,329,137.66
2 Plesteran 1 : 2 M2 74.40 75,750.95 5,635,870.74
3 Acian M2 74.40 42,579.90 3,167,944.56
4 Cat dinding Batu Bata M2 74.40 33,090.20 2,461,910.88
5 Urugan Tanah Timbunan + Tanah Humus M3 15.35 99,412.50 1,525,484.81
6 Pas. Tumbuahan rambat M1 93.00 15,000.00 1,395,000.00

c Lantai Dag Atap


1 Pas. Batu Bata 1 : 2 (1/2 Bata) M2 148.55 149,267.70 22,173,478.01
2 Plesteran 1 : 2 M2 190.99 75,750.95 14,467,734.69
3 Acian M2 190.99 42,579.90 8,132,369.16
4 Cat dinding Batu Bata M2 190.99 33,090.20 6,319,923.77
5 Urugan Tanah Timbunan + Tanah Humus M3 19.10 99,412.50 1,898,687.29
6 Pas. Tumbuahan rambat M1 212.21 15,000.00 3,183,180.00
99,099,795.68

1,197,007,012.64
RENCANA ANGGARAN
ARSITEKTUR LANT

KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARAT


PEKERJAAN : PENYUSUNAN DED GEDUNG KANTOR BPMPTSP KOT
LOKASI : AIE PACAH - PADANG
TAHUN ANGGARAN : 2018

NO URAIAN PEKERJAAN STN

III PEKERJAAN AKSITEKTUR LANTAI I


A PEKERJAAN DINDING BATA
a DINDING BIDANG LUAR
1 Pas. Batu Bata 1 : 2 ( 1/2 Bata) M2
2 Pas. Batu Bata 1 : 4 ( 1/2 Bata) M2
3 Pas. Plasteran 1 : 2 M2
4 Pas. Plasteran 1 : 4 M2
5 Pas. Acian 1 : 2 M2
6 Pas. Acian 1 : 4 M2
7 Pas. Cat Dinding Batu Bata M2
8 Pekerjaan Kolom Praktis 13 x 13 cm
a Beton K 175 M3
b Pembesian Kg
c Bekisting M2
d Afweerking M2

b DINDING BIDANG DALAM


1 Pas. Batu Bata 1 : 2 ( 1/2 Bata) M2
2 Pas. Batu Bata 1 : 4 ( 1/2 Bata) M2
3 Pas. Plasteran 1 : 2 M2
4 Pas. Plasteran 1 : 4 M2
5 Pas. Acian 1 : 2 M2
6 Pas. Acian 1 : 4 M2
7 Pas. Cat Dinding Batu Bata M2
8 Pekerjaan Kolom Praktis 13 x 13 cm
a Beton K 175 M3
b Pembesian Kg
c Bekisting M2
d Afweerking M2

B PEKERJAAN PINTU DAN JENDELA


a Type P1 ( 1 Unit )
1 Kuzen alumanium M1
Pas. Pintu Kaca Tempered tebal 12 mm + Rangka
2 M2
Alumunium
3 Engsel Pintu Tanam Bh
4 Kunci Pintu Tanam Bh
5 Handel Stenlis Bh
6 Door Holder Bh
7 Pas. Jendela Kaca Mati tebal 5 mm M2
8 Pekerjaan Kolom 30 x 25 cm
a Beton K 175 M3
b Pembesian Kg
c Bekisting M2
d Afweerking M2
e Granite 30 x30 cm M2

NO URAIAN PEKERJAAN STN

9 Pekerjaan Kolom 60 x 25 cm
a Beton K 175 M3
b Pembesian Kg
c Bekisting M2
d Afweerking M2
e Granite 30 x30 cm M2
10 Pekerjaan Balok 25 x 25 cm
a Beton K 175 M3
b Pembesian Kg
c Bekisting M2
d Afweerking M2
e Granite 30 x30 cm M2

b Type P2 ( 2 Unit )
1 Pas.
Kuzen alumanium
Pintu Kaca Tempered tebal 12 mm + Rangka M1
2 Alumunium M2
3 Engsel Pintu Tanam Bh
4 Kunci Pintu Tanam Bh
5 Handel Stenlis Bh
6 Door Holder Bh
7 Pas. Jendela Kaca Mati tebal 5 mm M2
8 Pas. Ventilasi Kaca Mati tebal 5 mm M2

c Type P3 ( 2 Unit )
1 Pas.
Kuzen alumanium
Pintu Kaca Tempered tebal 12 mm + Rangka M1
2 Alumunium M2
3 Engsel Pintu Tanam Bh
4 Kunci Pintu Tanam Bh
5 Handel Stenlis Bh
6 Door Holder Bh
7 Pas. Ventilasi Kaca Mati tebal 5 mm M2

d Type P4 ( 2 Unit )
1 Pas.
Kuzen alumanium
Pintu Kaca Tempered tebal 12 mm + Rangka M1
2 Alumunium M2
3 Engsel Pintu Tanam Bh
4 Kunci Pintu Tanam Bh
5 Handel Stenlis Bh
6 Door Holder Bh
7 Pas. Jendela Kaca tebal 5 mm + Rangka Alumuniu M2
8 Engsel Jendela Bh
9 Grendel Jendela Bh
10 Hak Anginl Jendela Bh
11 Pas. Jendela Kaca Mati tebal 5 mm M2

e Type P6 ( 1 Unit )
1 Pas.
Kuzen alumanium
Pintu Kaca Tempered tebal 12 mm + Rangka M1
2 Alumunium M2
3 Engsel Pintu Tanam Bh
4 Kunci Pintu Tanam Bh

NO URAIAN PEKERJAAN STN

5 Handel Stenlis Bh
6 Door Holder Bh
7 Pas. Ventilasi Kaca Mati tebal 5 mm M2

f Type P7 ( 8 Unit )
1 Kuzen alumanium M1
2 Pas. Pintu Alumunium Strip M2
3 Engsel Pintu Tanam Bh
4 Kunci Pintu Tanam Bh
5 Handel Stenlis Bh

g Type P8 ( 6 Unit )
1 Pas.
Kuzen alumanium
Pintu Kaca tebal 5 mm + Sunblasting + M1
2 Rangka Alumunium M2
3 Engsel Pintu Tanam Bh
4 Kunci Pintu Tanam Bh
5 Handel Stenlis Bh
6 Pas. Ventilasi Kaca Mati tebal 5 mm M2

h Type P9 ( 3 Unit )
1 Pas.
Kuzen alumanium
Pintu Kaca tebal 5 mm + Sunblasting + M1
2 Rangka Alumunium M2
3 Engsel Pintu Tanam Bh
4 Kunci Pintu Tanam Bh
5 Handel Stenlis Bh
6 Pas. Ventilasi Kaca Mati tebal 5 mm M2

i Type P10 ( 7 Unit )


1 Pas.
Kuzen alumanium
Pintu Kaca ES tebal 5 mm + Rangka M1
2 Alumunium Strip M2
3 Engsel Pintu Bh
4 Kunci Pintu Bh
5 Handel Pintu Bh
6 Grendel Pintu Bh
7 Pas. Ventilasi Kaca ES Mati tebal 5 mm M2

j Type P11 ( 16 Unit )


1 Pas.
Kuzen alumanium
Pintu Kaca ES tebal 5 mm + Rangka M1
2 Alumunium Strip M2
3 Engsel Pintu Bh
4 Kunci Pintu Bh
5 Handel Pintu Bh
6 Grendel Pintu Bh
7 Pas. Ventilasi Kaca ES Mati tebal 5 mm M2

k Type P15 ( 1 Unit )


1 Pas.
Kuzen alumanium
Pintu Kaca Tempered tebal 12 mm + Rangka M1
2 Alumunium M2
3 Engsel Pintu Tanam Bh
4 Kunci Pintu Tanam Bh

NO URAIAN PEKERJAAN STN


5 Handel Stenlis Bh
6 Door Holder Bh
7 Pas. Jendela Kaca Mati tebal 5 mm M2
8 Pas. Ventilasi Kaca Mati tebal 5 mm M2

l Type P17
Pas. ( 1Pintu
Daun Unit Lapis
) Plat besi t. 4 mm + Rangka
1 Besi Hollow + Accesoriess M1

m Type J1 ( 10 Unit )
1 Kuzen alumanium M1
2 Pas. Jendela Kaca tebal 5 mm + Rangka Alumuniu M2
3 Engsel Jendela Bh
4 Grendel Jendela Bh
5 Hak Anginl Jendela Bh
6 Pas. Jendela Kaca Mati tebal 5 mm M2

n Type J2 ( 6 Unit )
1 Kuzen alumanium M1
2 Pas. Jendela Kaca Mati tebal 5 mm M2

o Type J3 ( 2 Unit )
1 Kuzen alumanium M1
2 Pas. Jendela Kaca tebal 5 mm + Rangka Alumuniu M2
3 Engsel Jendela Bh
4 Grendel Jendela Bh
5 Hak Anginl Jendela Bh
6 Pas. Jendela Kaca Mati tebal 5 mm M2

p Type J4 ( 1 Unit )
1 Kuzen alumanium M1
2 Pas. Jendela Kaca Mati tebal 5 mm M2

q Type J5 ( 13 Unit )
1 Kuzen alumanium M1
2 Pas. Jendela Kaca ES Mati tebal 5 mm M2
r Type J9 ( 1 Unit )
1 Kuzen alumanium M1
2 Pas. Jendela Kaca tebal 5 mm + Rangka Alumuniu M2
3 Engsel Jendela Bh
4 Grendel Jendela Bh
5 Hak Anginl Jendela Bh
6 Pas. Jendela Kaca Mati tebal 5 mm M2

s Type J12 ( 1 Unit )


1 Kuzen alumanium M1
2 Pas. Ventilasi Jalusi Alumunium M2

NO URAIAN PEKERJAAN STN

C PEKERJAAN DINDING PARTISI


a Type PR1 ( 1 Unit )
1 Kuzen alumanium Natural 4" M1
2 Pas. Pintu Kaca tebal 5 mm + Rangka Alumunium M2
3 Engsel Pintu Bh
4 Kunci Pintu Bh
5 Handel Pintu Bh
6 Door Closer Bh
7 Pas. Jendela Kaca Mati tebal 5 mm + Sunblasting M2
8 Pas. Ventilasi Kaca Mati tebal 5 mm M2
9 Pas. Dinding Partisi Gypsumboard 9 mm Finish Ta M2
10 Pas. List Alumunium Dinding Partisi t.10 cm M1
11 Pas. List Profil Plafond Gypsumboard 10 x 10 cm M1
12 Pas. Cat List Profil Plafond Gypsumboard 10 x 10 M2

b Type PR2 ( 1 Unit )


1 Kuzen alumanium Natural 4" M1
2 Pas. Pintu Kaca tebal 5 mm + Rangka Alumunium M2
3 Engsel Pintu Bh
4 Kunci Pintu Bh
5 Handel Pintu Bh
6 Door Closer Bh
7 Pas. Jendela Kaca Mati tebal 5 mm + Sunblasting M2
8 Pas. Ventilasi Kaca Mati tebal 5 mm M2
9 Pas. Dinding Partisi Gypsumboard 9 mm Finish Ta M2
10 Pas. List Alumunium Dinding Partisi t.10 cm M1
11 Pas. List Profil Plafond Gypsumboard 10 x 10 cm M1
12 Pas. Cat List Profil Plafond Gypsumboard 10 x 10 M2

c Type PR4 ( 1 Unit )


1 Kuzen alumanium Natural 4" M1
2 Pas. Pintu Kaca tebal 5 mm + Rangka Alumunium M2
3 Engsel Pintu Bh
4 Kunci Pintu Bh
5 Handel Pintu Bh
6 Door Closer Bh
7 Pas. Jendela Kaca Mati tebal 5 mm + Sunblasting M2
8 Pas. Ventilasi Kaca Mati tebal 5 mm M2
9 Pas. Dinding Partisi Gypsumboard 9 mm Finish Ta M2
10 Pas. List Alumunium Dinding Partisi t.10 cm M1
11 Pas. List Profil Plafond Gypsumboard 10 x 10 cm M1
12 Pas. Cat List Profil Plafond Gypsumboard 10 x 10 M2

d Type PR5 ( 1 Unit )


1 Kuzen alumanium Natural 4" M1
2 Pas. Jendela Kaca Mati tebal 5 mm + Sunblasting M2
3 Pas. Ventilasi Kaca Mati tebal 5 mm M2
4 Pas. Dinding Partisi Gypsumboard 9 mm Finish Ta M2
5 Pas. List Alumunium Dinding Partisi t.10 cm M1
6 Pas. List Profil Plafond Gypsumboard 10 x 10 cm M1
7 Pas. Cat List Profil Plafond Gypsumboard 10 x 10 M2

NO URAIAN PEKERJAAN STN

e Type PR6 ( 1 Unit )


1 Kuzen alumanium Natural 4" M1
2 Pas. Jendela Kaca Mati tebal 5 mm + Sunblasting M2
3 Pas. Ventilasi Kaca Mati tebal 5 mm M2
4 Pas. Dinding Partisi Gypsumboard 9 mm Finish Ta M2
5 Pas. List Alumunium Dinding Partisi t.10 cm M1
6 Pas. List Profil Plafond Gypsumboard 10 x 10 cm M1
7 Pas. Cat List Profil Plafond Gypsumboard 10 x 10 M2

f Type PR7 ( 6 Unit )


1 Kuzen alumanium Natural 4" M1
2 Pas. Jendela Kaca Mati tebal 5 mm + Sunblasting M2
3 Pas. Ventilasi Kaca Mati tebal 5 mm M2
4 Pas. Dinding Partisi Gypsumboard 9 mm Finish Ta M2
5 Pas. List Alumunium Dinding Partisi t.10 cm M1
6 Pas. List Profil Plafond Gypsumboard 10 x 10 cm M1
7 Pas. Cat List Profil Plafond Gypsumboard 10 x 10 M2

g Type PR8 ( 8 Unit )


1 Kuzen alumanium Natural 4" M1
2 Pas. Jendela Kaca Mati tebal 5 mm + Sunblasting M2
3 Pas. Ventilasi Kaca Mati tebal 5 mm M2
4 Pas. Dinding Partisi Gypsumboard 9 mm Finish Ta M2
5 Pas. List Alumunium Dinding Partisi t.10 cm M1
6 Pas. List Profil Plafond Gypsumboard 10 x 10 cm M1
7 Pas. Cat List Profil Plafond Gypsumboard 10 x 10 M2

h Type PR11 ( 1 Unit )


1 Kuzen alumanium Natural 4" M1
2 Pas. Jendela Kaca Mati tebal 5 mm + Sunblasting M2
3 Pas. Ventilasi Kaca Mati tebal 5 mm M2
4 Pas. Dinding Partisi Gypsumboard 9 mm Finish Ta M2
5 Pas. List Alumunium Dinding Partisi t.10 cm M1
6 Pas. List Profil Plafond Gypsumboard 10 x 10 cm M1
7 Pas. Cat List Profil Plafond Gypsumboard 10 x 10 M2

i Type PR12 ( 2 Unit )


1 Kuzen alumanium Natural 4" M1
2 Pas. Dinding Partisi Gypsumboard 9 mm Lapis M2
Tacon
3 Pas. WarnaPartisi
Dinding Terang Gypsumboard 9 mm Lapis M2
4 Tacon Warna
Pas. List Gelap Dinding Partisi t.10 cm
Alumunium M1
5 Pas. List Profil Plafond Gypsumboard 10 x 10 cm M1
6 Pas. Cat List Profil Plafond Gypsumboard 10 x 10 M2

j Type PR14 ( 1 Unit )


1 Kuzen alumanium Natural 4" M1
2 Pas. Pintu Kaca Tempered tebal 12 mm M2
3 Engsel Pintu Bh
4 Kunci Pintu Bh
5 Handel Pintu Bh
6 Door Holder Bh
7 Pas. Jendela Kaca Mati tebal 5 mm + Sunblasting M2

NO URAIAN PEKERJAAN STN


8 Pas. Ventilasi Kaca Mati tebal 5 mm M2
9 Pas. Dinding Partisi Gypsumboard 9 mm Finish Ta M2
10 Pas. List Alumunium Dinding Partisi t.10 cm M1
11 Pas. List Profil Plafond Gypsumboard 10 x 10 cm M1
12 Pas. Cat List Profil Plafond Gypsumboard 10 x 10 M2

k Type PR15 ( 1 Unit )


1 Kuzen alumanium Natural 4" M1
2 Pas. Jendela Kaca Mati tebal 5 mm + Sunblasting M2
3 Pas. Dinding Partisi Gypsumboard 9 mm Lapis M2
4 Tacon warna
Pas. List Gelap Dinding Partisi t.10 cm
Alumunium M1
5 Pas. List Profil Plafond Gypsumboard 10 x 10 cm M1
6 Pas. Cat List Profil Plafond Gypsumboard 10 x 10 M2

l Type PR16 ( 1 Unit )


1 Kuzen alumanium Natural 4" M1
2 Pas. Pintu Kaca tebal 5 mm + Rangka Alumunium M2
3 Engsel Pintu Bh
4 Kunci Pintu Bh
5 Handel Pintu Bh
6 Door Closer Bh
7 Pas. Jendela Kaca Mati tebal 5 mm + Sunblasting M2
8 Pas. Dinding Partisi Gypsumboard 9 mm Lapis M2
9 Tacon Warna
Pas. List Gelap Dinding Partisi t.10 cm
Alumunium M1
10 Pas. List Profil Plafond Gypsumboard 10 x 10 cm M1
11 Pas. Cat List Profil Plafond Gypsumboard 10 x 10 M2

m Type PR17 ( 4 Unit )


1 Kuzen alumanium Natural 4" M1
2 Pas. Dinding Partisi Gypsumboard 9 mm Lapis M2
Tacon
3 Pas. warna Partisi
Dinding TerangGypsumboard 9 mm Lapis M2
4 Tacon warna
Pas. List Gelap Dinding Partisi t.10 cm
Alumunium M1
5 Pas. List Profil Plafond Gypsumboard 10 x 10 cm M1
6 Pas. Cat List Profil Plafond Gypsumboard 10 x 10 M2
D PEKERJAAN PLAFOND
a Plafond Gypsum
jarak 60 cm dan Skunder Hollow 40.40.2 jarak
1 80 cm M2
2 Pas. Plafond Gypsum t= 9 mm M2
3 Pas List Plafond Gypsum T 10 cm M1
4 Cat Plafond Gypsum dan List Plafond M2

E PEKERJAAN LANTAI
1 Pas. Granite 60 x 60 cm M2
2 Pas Keramik Unpolished 30 x 30 cm M2
3 Pas. Plint Granite 15 x 60 cm M2

NO URAIAN PEKERJAAN STN

F PEKERJAAN FINISING TANGGA


a Tangga Detail A
1 Granite 60 x 60 cm (Anak Tangga Step 1 dan 2) M2
2 Nosing 10 x 60 cm (anak tangga step 1 dan 2) M1
3 Granite 60 x 60 cm (Bordes) M2
4 Plint Granite 15 x 60 cm (anak tangga Step 1 dan M2
5 Pas. Hand Railling Pipa Galvanis Ф 2,5, Tiang M1
6 Railling Pipa Tangga
Pengecatan Galvanis Ф 2,5 dan Pipa Galvanis Ф 1 M2
b Tangga Detail B
1 Granite 60 x 60 cm (Anak Tangga Step 1 dan 2) M2
2 Nosing 10 x 60 cm (anak tangga step 1 dan 2) M1
3 Granite 60 x 60 cm (Bordes) M2
4 Plint Granite 15 x 60 cm (anak tangga Step 1 dan M2
5 Pas. Hand Railling Pipa Galvanis Ф 2,5, Tiang M1
Railling Pipa Galvanis Ф 2,5 dan Pipa Galvanis Ф 1
6 Pengecatan Tangga M2

c Tangga Detail C
1 Pas. Hand Railling Pipa Galvanis Φ 2,5, Tiang M2
Railling Pipa Galvanis Φ 2,5 dan Pipa Galvanis Φ 1"
d Tangga Detail D
1 Keramik Unpolished 30 x 30 cm M2
2 Nosing 10 x 30 cm (anak tangga ) M1
3 Keramik Unpolished 30 x 30 cm (Bordes) M2
4 Pas. Hand Railling Pipa Galvanis Φ 2,5, Tiang M2
5 Railling Pipa Tangga
Pengecatan Galvanis Φ 2,5 dan Pipa Galvanis Φ 1" M1

G PEKERJAAN TOILET (WC) dan ACCESSORIES


a Toilet A
1 Pasangan Batu Bata 1 : 2 M2
2 Pasangan Batu Bata 1 : 4 M2
3 Plesteran 1 : 2 M2
4 Plesteran 1 : 4 M2
5 Acian M2
6 Pengecatan M2
7 Lantai Lapis Membran M2
7 Keramik lantai Unpolished 20 X 20 cm M2
8 Keramik Dinding 20 x 40 M2
9 Keramik Border Dinding 10 x 20 M1
10 Kloset Jongkok (setara KIA) Bh
11 Pas. Batu Bata 1:2 (1/2 bata) peninggian closet M2
12 Urugan Pasir Peninggian Closet M3
13 Beton K-100 Peninggian Closet M3
14 Plasteran 1 : 2 cm Peninggian Closet M2
15 Kran Air (standar American F062M022) Bh
16 Wastafel lengkap +Acecoris + Cermin Bh
17 Beton Wastafel K-175 M3
18 Keramik Beton Wastafel 20 x 20 cm M2
19 Floar Drain Bh

NO URAIAN PEKERJAAN STN

b Toilet C
1 Pasangan Batu Bata 1 : 2 M2
2 Pasangan Batu Bata 1 : 4 M2
3 Plesteran 1 : 2 M2
4 Plesteran 1 : 4 M2
5 Acian M2
6 Pengecatan M2
7 Lantai Lapis Membran M2
7 Keramik lantai Unpolished 20 X 20 cm M2
8 Keramik Dinding 20 x 40 M2
9 Keramik Border Dinding 10 x 20 M1
10 Kloset Jongkok (setara TOTO) Bh
11 Pas. Batu Bata 1:2 (1/2 bata) peninggian closet M2
12 Urugan Pasir Peninggian Closet M3
13 Beton K-100 Peninggian Closet M3
14 Plasteran 1 : 2 cm Peninggian Closet M2
15 Kran Air (standar American F062M022) Bh
16 Wastafel lengkap +Acecoris + Cermin Bh
18 Beton Wastafel K-175 M3
19 Keramik Beton Wastafel 20 x 20 cm M2
20 Floar Drain Bh
21 Wastafel Zink 60 x 193 cm lengkap +Acecoris Bh
22 Beton Wastafel Zink 60 x 193 cm K-175 M3
23 Keramik 20 x 20 cm Beton Wastafel Zink 60 x 1 M2
24 Wastafel Zink 60 x 105 cm lengkap +Acecoris Bh
25 Beton Wastafel Zink 60 x 105 cm K-175 M3
26 Keramik 20 x 20 cm Beton Wastafel Zink 60 x 1 M2

c Toilet F
1 Pasangan Batu Bata 1 : 2 M2
2 Pasangan Batu Bata 1 : 4 M2
3 Plesteran 1 : 2 M2
4 Plesteran 1 : 4 M2
5 Acian M2
6 Pengecatan M2
7 Lantai Lapis Membran M2
7 Keramik lantai Unpolished 20 X 20 cm M2
8 Keramik Dinding 20 x 40 M2
9 Keramik Border Dinding 10 x 20 M1
10 Pas. Batu Bata 1:2 (1/2 bata) peninggian Tempat M2
11 Plasteran 1:2 (1/2 bata) peninggian Tempat wudhu M2
12 Keramik 20 x 20 cm peninggian Tempat wudhu' M2
13 Kran Air (standar American F062M022) Bh
14 Floar Drain Bh

H PEKERJAAN CUTTING PLAT Dan UKIRAN 3


a Type Ukiran 3 (28 Unit)
1 Tengelam t. 1 cm + Finishing Cat M2
2 Pas. Bis Beton Kaki Kolom M1
b Type CP-4 (16 Unit)
1 Pas. Cutting Plat Pola By Order / Ukiran Motif M2
c Type CP-3 (2 Unit)
1 Kaluak Paku M2
ANA ANGGARAN BIAYA
RSITEKTUR LANTAI I

SARANA APARATUR
OR BPMPTSP KOTA PADANG

HARGA JUMLAH
VOLUME SATUAN HARGA
(Rp.) (Rp.)

126.58 149,267.70 18,894,305.47


275.53 142,383.80 39,230,866.03
253.16 83,656.33 21,178,435.69
551.06 69,944.06 38,543,232.71
253.16 75,750.95 19,177,110.70
551.06 75,750.95 41,743,167.45
804.22 33,090.20 26,611,734.46

5.81 847,285.37 4,922,727.99


743.87 15,434.15 11,481,001.16
89.46 393,415.00 35,194,905.90
76.76 64,997.58 4,989,214.00

53.17 149,267.70 7,936,712.88


261.73 142,383.80 37,265,542.44
106.34 83,656.33 8,896,181.10
523.45 69,944.06 36,612,357.05
106.34 75,750.95 8,055,507.61
523.45 75,750.95 39,651,986.70
629.79 33,090.20 20,840,009.42
4.19 847,285.37 3,550,125.70
523.50 15,434.15 8,079,777.53
64.48 393,415.00 25,367,399.20
64.48 64,997.58 4,191,043.75

33.92 153,846.43 5,218,470.74


8.00 1,450,357.00 11,602,856.00
8.00 47,519.15 380,153.20
4.00 328,049.00 1,312,196.00
8.00 149,811.75 1,198,494.00
4.00 225,000.00 900,000.00
12.86 139,979.15 1,800,131.87

0.42 847,285.37 355,859.86


55.62 15,434.15 858,447.42
6.16 393,415.00 2,423,436.40
6.16 64,997.58 400,385.07
9.37 328,281.59 3,075,998.47

HARGA JUMLAH
VOLUME SATUAN HARGA
(Rp.) (Rp.)

0.42 847,285.37 355,859.86


36.19 15,434.15 558,561.89
4.76 393,415.00 1,872,655.40
4.76 64,997.58 309,388.47
7.97 328,281.59 2,616,404.25
0.21 847,285.37 177,929.93
32.39 15,434.15 499,912.12
3.44 393,415.00 1,353,347.60
3.44 64,997.58 223,591.66
2.58 328,281.59 846,966.50

51.76 153,846.43 7,963,090.96


6.72 1,450,357.00 9,746,399.04
8.00 47,519.15 380,153.20
2.00 328,049.00 656,098.00
8.00 149,811.75 1,198,494.00
4.00 225,000.00 900,000.00
9.66 139,979.15 1,352,198.59
3.48 139,979.15 487,127.44

14.00 153,846.43 2,153,849.95


3.78 1,450,357.00 5,482,349.46
4.00 47,519.15 190,076.60
2.00 328,049.00 656,098.00
4.00 149,811.75 599,247.00
2.00 225,000.00 450,000.00
0.72 139,979.15 100,784.99

39.20 153,846.43 6,030,779.86


6.72 1,450,357.00 9,746,399.04
8.00 47,519.15 380,153.20
2.00 328,049.00 656,098.00
8.00 149,811.75 1,198,494.00
4.00 225,000.00 900,000.00
4.12 134,231.90 553,035.43
8.00 29,826.50 238,612.00
8.00 23,408.55 187,268.40
8.00 37,012.75 296,102.00
4.06 139,979.15 568,315.35

8.40 153,846.43 1,292,309.97


3.36 1,450,357.00 4,873,199.52
4.00 47,519.15 190,076.60
1.00 328,049.00 328,049.00

HARGA JUMLAH
VOLUME SATUAN HARGA
(Rp.) (Rp.)
4.00 149,811.75 599,247.00
2.00 225,000.00 450,000.00
0.64 139,979.15 89,586.66

25.20 153,846.43 3,876,929.91


4.68 1,166,578.98 5,459,589.60
16.00 47,519.15 760,306.40
8.00 328,049.00 2,624,392.00
8.00 149,811.75 1,198,494.00

42.00 153,846.43 6,461,549.85


11.34 134,231.90 1,522,189.75
18.00 47,519.15 855,344.70
6.00 328,049.00 1,968,294.00
12.00 149,811.75 1,797,741.00
2.16 139,979.15 302,354.96
20.40 153,846.43 3,138,467.07
5.04 134,231.90 676,528.78
9.00 47,519.15 427,672.35
3.00 328,049.00 984,147.00
6.00 149,811.75 898,870.50
0.96 139,979.15 134,379.98

49.00 153,846.43 7,538,474.83


13.23 134,231.90 1,775,888.04
21.00 47,519.15 997,902.15
7.00 328,049.00 2,296,343.00
14.00 149,811.75 2,097,364.50
7.00 28,497.58 199,483.03
2.52 139,979.15 352,747.46

105.60 153,846.43 16,246,182.48


23.52 134,231.90 3,157,134.29
48.00 47,519.15 2,280,919.20
16.00 328,049.00 5,248,784.00
32.00 149,811.75 4,793,976.00
16.00 28,497.58 455,961.20
4.48 139,979.15 627,106.59

18.25 153,846.43 2,807,697.26


3.36 1,450,357.00 4,873,199.52
4.00 47,519.15 190,076.60
1.00 328,049.00 328,049.00

HARGA JUMLAH
VOLUME SATUAN HARGA
(Rp.) (Rp.)
4.00 149,811.75 599,247.00
2.00 225,000.00 450,000.00
3.06 139,979.15 428,336.20
1.33 139,979.15 186,172.27

4.20 938,536.50 3,941,853.30

250.80 153,846.43 38,584,683.39


31.92 134,231.90 4,284,682.25
76.00 29,826.50 2,266,814.00
76.00 23,408.55 1,779,049.80
76.00 37,012.75 2,812,969.00
23.94 139,979.15 3,351,100.85

115.20 153,846.43 17,723,108.16


7.56 139,979.15 1,058,242.37

21.60 153,846.43 3,323,082.78


1.52 134,231.90 204,032.49
4.00 29,826.50 119,306.00
4.00 23,408.55 93,634.20
4.00 37,012.75 148,051.00
1.14 139,979.15 159,576.23

5.40 153,846.43 830,770.70


0.63 139,979.15 88,186.86

31.20 153,846.43 4,800,008.46


3.12 139,979.15 436,734.95
19.40 153,846.43 2,984,620.65
2.60 134,231.90 349,002.94
6.00 29,826.50 178,959.00
6.00 23,408.55 140,451.30
6.00 37,012.75 222,076.50
1.95 139,979.15 272,959.34

5.40 153,846.43 830,770.70


0.63 139,979.15 88,186.86

HARGA JUMLAH
VOLUME SATUAN HARGA
(Rp.) (Rp.)

84.24 153,846.43 12,960,022.84


5.04 134,231.90 676,528.78
9.00 47,519.15 427,672.35
3.00 328,049.00 984,147.00
6.00 149,811.75 898,870.50
3.00 225,000.00 675,000.00
7.40 134,231.90 993,316.06
7.34 139,979.15 1,027,446.96
20.16 125,000.00 2,520,000.00
45.12 45,000.00 2,030,400.00
22.10 35,000.00 773,500.00
6.63 33,090.20 219,388.03

51.96 153,846.43 7,993,860.24


3.36 134,231.90 451,019.18
6.00 47,519.15 285,114.90
2.00 328,049.00 656,098.00
4.00 149,811.75 599,247.00
2.00 225,000.00 450,000.00
4.82 134,231.90 646,997.76
5.89 139,979.15 824,477.19
12.60 125,000.00 1,575,000.00
28.68 45,000.00 1,290,600.00
14.40 35,000.00 504,000.00
4.32 33,090.20 142,949.66

59.24 153,846.43 9,113,862.22


3.36 134,231.90 451,019.18
6.00 47,519.15 285,114.90
2.00 328,049.00 656,098.00
4.00 149,811.75 599,247.00
2.00 225,000.00 450,000.00
5.86 134,231.90 786,598.93
5.48 139,979.15 767,085.74
15.24 125,000.00 1,905,000.00
33.08 45,000.00 1,488,600.00
16.30 35,000.00 570,500.00
4.89 33,090.20 161,811.08

39.52 153,846.43 6,080,010.72


3.54 134,231.90 475,180.93
2.71 139,979.15 379,343.50
9.24 125,000.00 1,155,000.00
19.24 45,000.00 865,800.00
7.70 35,000.00 269,500.00
2.31 33,090.20 76,438.36

HARGA JUMLAH
VOLUME SATUAN HARGA
(Rp.) (Rp.)

36.64 153,846.43 5,636,933.01


3.37 134,231.90 452,361.50
2.54 139,979.15 355,547.04
8.83 125,000.00 1,103,750.00
18.56 45,000.00 835,200.00
7.36 35,000.00 257,600.00
2.20 33,090.20 72,798.44

336.00 153,846.43 51,692,398.80


28.01 134,231.90 3,759,835.52
21.77 139,979.15 3,047,346.10
72.72 125,000.00 9,090,000.00
144.24 45,000.00 6,490,800.00
60.60 35,000.00 2,121,000.00
18.18 33,090.20 601,579.84

34.48 153,846.43 5,304,624.73


4.12 134,231.90 553,035.43
3.71 139,979.15 519,322.65
10.80 125,000.00 1,350,000.00
25.68 45,000.00 1,155,600.00
9.00 35,000.00 315,000.00
2.70 33,090.20 89,343.54

9.60 153,846.43 1,476,925.68


0.93 134,231.90 124,835.67
0.67 139,979.15 93,786.03
2.40 125,000.00 300,000.00
7.84 45,000.00 352,800.00
2.00 35,000.00 70,000.00
0.60 33,090.20 19,854.12

57.52 153,846.43 8,849,246.37


18.24 125,000.00 2,280,000.00
13.68 125,000.00 1,710,000.00
30.48 45,000.00 1,371,600.00
11.40 35,000.00 399,000.00
3.42 33,090.20 113,168.48

36.04 153,846.43 5,544,625.16


3.36 991,864.65 3,332,665.22
4.00 47,519.15 190,076.60
1.00 328,049.00 328,049.00
4.00 149,811.75 599,247.00
2.00 225,000.00 450,000.00
2.31 134,231.90 310,075.69

HARGA JUMLAH
VOLUME SATUAN HARGA
(Rp.) (Rp.)
2.74 139,979.15 383,542.87
6.02 125,000.00 752,500.00
17.72 45,000.00 797,400.00
8.22 35,000.00 287,700.00
2.46 33,090.20 81,401.89

17.51 153,846.43 2,693,850.90


2.76 134,231.90 370,480.04
7.20 125,000.00 900,000.00
15.84 45,000.00 712,800.00
6.00 35,000.00 210,000.00
1.80 33,090.20 59,562.36

10.01 153,846.43 1,540,002.71


1.68 134,231.90 225,509.59
3.00 47,519.15 142,557.45
1.00 328,049.00 328,049.00
2.00 149,811.75 299,623.50
1.00 225,000.00 225,000.00
0.85 139,979.15 118,982.28
2.20 125,000.00 275,000.00
7.52 45,000.00 338,400.00
3.70 35,000.00 129,500.00
1.11 33,090.20 36,730.12

73.92 153,846.43 11,372,327.74


23.80 125,000.00 2,975,000.00
17.85 125,000.00 2,231,250.00
45.12 45,000.00 2,030,400.00
14.88 35,000.00 520,800.00
4.46 33,090.20 147,582.29
1,100.39 92,902.75 102,229,257.07
1,100.39 54,518.63 59,991,749.76
691.41 43,682.75 30,202,690.18
1,169.53 37,688.38 44,077,685.21

870.91 475,040.91 413,716,451.63


83.67 328,281.59 27,465,679.02
65.10 475,040.91 30,925,163.08

HARGA JUMLAH
VOLUME SATUAN HARGA
(Rp.) (Rp.)

11.62 475,040.91 5,519,975.35


34.00 75,000.00 2,550,000.00
4.45 475,040.91 2,113,932.04
2.07 475,040.91 984,047.24
20.08 850,000.00 17,068,000.00
16.15 37,688.38 608,667.26

11.62 475,040.91 5,519,975.35


34.00 75,000.00 2,550,000.00
4.45 475,040.91 2,113,932.04
2.07 475,040.91 984,047.24
20.08 850,000.00 17,068,000.00
16.15 37,688.38 608,667.26

4.00 850,000.00 3,400,000.00

6.60 328,281.59 2,166,658.48


17.37 50,000.00 868,500.00
3.23 328,281.59 1,060,349.53
10.11 850,000.00 8,593,500.00
9.66 37,688.38 364,069.70

41.39 149,267.70 6,178,190.10


30.93 142,383.80 4,403,930.93
82.78 83,656.33 6,925,070.73
61.85 69,944.06 4,326,039.99
103.24 75,750.95 7,820,528.16
103.24 33,090.20 3,416,232.25
6.08
17.04 231,013.67 3,936,472.99
50.29 327,324.86 16,461,167.03
29.85 75,000.00 2,238,750.00
4.00 588,468.10 2,353,872.40
0.96 149,267.70 143,296.99
0.62 153,180.00 94,971.60
0.19 732,797.22 139,231.47
3.69 83,656.33 308,691.85
4.00 91,453.75 365,815.00
2.00 2,046,183.50 4,092,367.00
0.09 847,285.37 76,255.68
3.76 227,797.32 856,517.94
6.00 370,370.55 2,222,223.30

HARGA JUMLAH
VOLUME SATUAN HARGA
(Rp.) (Rp.)

114.89 149,267.70 17,149,366.05


88.77 142,383.80 12,639,409.93
229.78 83,656.33 19,222,550.77
143.00 69,944.06 10,002,000.29
257.89 75,750.95 19,535,412.70
257.89 33,090.20 8,533,631.68
12.17
44.24 231,013.67 10,220,044.89
137.87 327,324.86 45,128,277.97
82.03 75,000.00 6,152,250.00
8.00 588,468.10 4,707,744.80
1.93 149,267.70 288,086.66
1.25 153,180.00 191,475.00
0.38 732,797.22 278,462.94
7.39 83,656.33 618,220.26
8.00 91,453.75 731,630.00
5.00 2,046,183.50 10,230,917.50
0.24 847,285.37 203,348.49
2.40 227,797.32 546,713.58
13.00 370,370.55 4,814,817.15
1.00 588,611.65 588,611.65
0.07 847,285.37 59,309.98
1.05 227,797.32 239,187.19
1.00 588,611.65 588,611.65
0.02 847,285.37 16,945.71
0.31 227,797.32 70,617.17
19.17 149,267.70 2,861,461.81
15.08 142,383.80 2,147,147.70
26.82 83,656.33 2,243,662.68
30.17 69,944.06 2,110,212.23
56.99 75,750.95 4,317,046.69
56.99 33,090.20 1,885,810.50
6.61
6.61 231,013.67 1,527,000.38
20.08 327,324.86 6,572,683.12
12.00 75,000.00 900,000.00
1.96 149,267.70 292,564.69
4.65 83,656.33 389,001.92
4.65 231,013.67 1,074,213.58
8.00 91,453.75 731,630.00
4.00 370,370.55 1,481,482.20

92.40 2,500,000.00 231,000,000.00


61.60 75,000.00 4,620,000.00

59.52 2,500,000.00 148,800,000.00

3.60 2,500,000.00 9,000,000.00

2,406,609,331.14
TOTAL
HARGA
(Rp.)
462,413,344.94

TOTAL
HARGA
(Rp.)
TOTAL
HARGA
(Rp.)
TOTAL
HARGA
(Rp.)
281,325,950.48

TOTAL
HARGA
(Rp.)
TOTAL
HARGA
(Rp.)
TOTAL
HARGA
(Rp.)
219,047,851.38
236,501,382.23

472,107,293.72

TOTAL
HARGA
(Rp.)
74,142,321.47
TOTAL
HARGA
(Rp.)
267,651,186.93

393,420,000.00
RENCANA ANGGARAN BIAYA
ARSITEKTUR LANTAI II

KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATUR


PEKERJAAN : PENYUSUNAN DED GEDUNG KANTOR BPMPTSP KOTA PADANG
LOKASI : AIE PACAH - PADANG
TAHUN ANGGARA : 2018

HARGA JUMLAH TOTAL


NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA HARGA
(Rp.) (Rp.) (Rp.)
IV PEKERJAAN AKSITEKTUR LANTAI II
A PEKERJAAN DINDING BATA
a DINDING BIDANG LUAR
1 Pas. Batu Bata 1 : 2 ( 1/2 Bata) M2 146.94 149,267.70 21,933,992.91
2 Pas. Batu Bata 1 : 4 ( 1/2 Bata) M2 266.58 142,383.80 37,956,531.02
3 Pas. Plasteran 1 : 2 M2 293.89 83,656.33 24,585,590.57
4 Pas. Plasteran 1 : 4 M2 533.16 69,944.06 37,291,234.08
5 Pas. Acian 1 : 2 M2 293.89 75,750.95 22,262,295.43
6 Pas. Acian 1 : 4 M2 533.16 75,750.95 40,387,225.43
7 Pas. Cat Dinding Batu Bata M2 827.05 33,090.20 27,367,117.55
8 Pekerjaan Kolom Praktis 13 x 13 cm
a Beton K 175 M3 6.65 847,285.37 5,634,447.71
b Pembesian Kg 851.10 15,434.15 13,136,005.07
c Bekisting M2 102.36 393,415.00 40,269,959.40
d Afweerking M2 87.83 64,997.58 5,708,737.17

b DINDING BIDANG DALAM


1 Pas. Batu Bata 1 : 2 ( 1/2 Bata) M2 50.47 149,267.70 7,532,943.75
2 Pas. Batu Bata 1 : 4 ( 1/2 Bata) M2 255.59 142,383.80 36,392,373.79
3 Pas. Plasteran 1 : 2 M2 100.93 83,656.33 8,443,600.38
4 Pas. Plasteran 1 : 4 M2 511.19 69,944.06 35,754,493.18
5 Pas. Acian 1 : 2 M2 100.93 75,750.95 7,645,694.97
6 Pas. Acian 1 : 4 M2 511.19 75,750.95 38,722,901.29
7 Pas. Cat Dinding Batu Bata M2 612.12 33,090.20 20,255,140.13
8 Pekerjaan Kolom Praktis 13 x 13 cm
a Beton K 175 M3 2.09 847,285.37 1,770,826.42
b Pembesian Kg 261.75 15,434.15 4,039,888.76
c Bekisting M2 32.24 393,415.00 12,683,699.60
d Afweerking M2 32.24 64,997.58 2,095,521.88

451,870,220.45

B PEKERJAAN PINTU DAN JENDELA


a Type P2 ( 2 Unit )
1 Pas.
Kuzen alumanium
Pintu Kaca Tempered tebal 12 mm + M1 51.76 153,846.43 7,963,090.96
2 Rangka Alumunium M2 6.72 1,450,357.00 9,746,399.04
3 Engsel Pintu Tanam Bh 8.00 47,519.15 380,153.20
4 Kunci Pintu Tanam Bh 2.00 328,049.00 656,098.00
5 Handel Stenlis Bh 8.00 149,811.75 1,198,494.00
6 Door Holder Bh 4.00 225,000.00 900,000.00
7 Pas. Jendela Kaca Mati tebal 5 mm M2 9.66 139,979.15 1,352,198.59
8 Pas. Ventilasi Kaca Mati tebal 5 mm M2 3.48 139,979.15 487,127.44

HARGA JUMLAH TOTAL


NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA HARGA
(Rp.) (Rp.) (Rp.)
b Type P5 ( 7 Unit )
1 Kuzen alumanium
Pas. Pintu Kaca Tempered tebal 12 mm + M1 58.80 153,846.43 9,046,169.79
2 Rangka Alumunium M2 23.52 1,450,357.00 34,112,396.64
3 Engsel Pintu Tanam Bh 28.00 47,519.15 1,330,536.20
4 Kunci Pintu Tanam Bh 7.00 328,049.00 2,296,343.00
5 Handel Stenlis Bh 28.00 149,811.75 4,194,729.00
6 Door Holder Bh 14.00 225,000.00 3,150,000.00
7 Pas. Jendela Kaca Mati tebal 5 mm M2 4.48 139,979.15 627,106.59
c Type P7 ( 7 Unit )
1 Kuzen alumanium M1 22.05 153,846.43 3,392,313.67
2 Pas. Pintu Alumunium Strip M2 4.09 1,166,578.98 4,771,308.01
3 Engsel Pintu Tanam Bh 14.00 47,519.15 665,268.10
4 Kunci Pintu Tanam Bh 7.00 328,049.00 2,296,343.00
5 Handel Stenlis Bh 7.00 149,811.75 1,048,682.25

d Type P8 ( 6 Unit )
1 Pas.
Kuzen alumanium
Pintu Kaca tebal 5 mm + Sunblasting + M1 42.00 153,846.43 6,461,549.85
2 Rangka Alumunium M2 11.34 134,231.90 1,522,189.75
3 Engsel Pintu Tanam Bh 18.00 47,519.15 855,344.70
4 Kunci Pintu Tanam Bh 6.00 328,049.00 1,968,294.00
5 Handel Stenlis Bh 12.00 149,811.75 1,797,741.00
6 Pas. Ventilasi Kaca Mati tebal 5 mm M2 2.16 139,979.15 302,354.96

e Type P9 ( 4 Unit )
1 Pas.
Kuzen alumanium
Pintu Kaca tebal 5 mm + Sunblasting + M1 27.20 153,846.43 4,184,622.76
2 Rangka Alumunium M2 6.72 134,231.90 902,038.37
3 Engsel Pintu Tanam Bh 12.00 47,519.15 570,229.80
4 Kunci Pintu Tanam Bh 4.00 328,049.00 1,312,196.00
5 Handel Stenlis Bh 8.00 149,811.75 1,198,494.00
6 Pas. Ventilasi Kaca Mati tebal 5 mm M2 1.28 139,979.15 179,173.31

f Type P10 ( 4 Unit )


1 Pas.
Kuzen alumanium
Pintu Kaca ES tebal 5 mm + Rangka M1 28.00 153,846.43 4,307,699.90
2 Alumunium Strip M2 7.56 134,231.90 1,014,793.16
3 Engsel Pintu Bh 12.00 47,519.15 570,229.80
4 Kunci Pintu Bh 4.00 328,049.00 1,312,196.00
5 Handel Pintu Bh 8.00 149,811.75 1,198,494.00
6 Grendel Pintu Bh 4.00 28,497.58 113,990.30
7 Pas. Ventilasi Kaca ES Mati tebal 5 mm M2 1.44 139,979.15 201,569.98

g Type P11 ( 9 Unit )


1 Pas.
Kuzen alumanium
Pintu Kaca ES tebal 5 mm + Rangka M1 59.40 153,846.43 9,138,477.65
2 Alumunium Strip M2 13.23 134,231.90 1,775,888.04
3 Engsel Pintu Bh 27.00 47,519.15 1,283,017.05
4 Kunci Pintu Bh 9.00 328,049.00 2,952,441.00
5 Handel Pintu Bh 18.00 149,811.75 2,696,611.50
6 Grendel Pintu Bh 9.00 28,497.58 256,478.18
7 Pas. Ventilasi Kaca ES Mati tebal 5 mm M2 2.52 139,979.15 352,747.46

HARGA JUMLAH TOTAL


NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA HARGA
(Rp.) (Rp.) (Rp.)
h Type J1 ( 14 Unit )
1 Kuzen alumanium
Pas. Jendela Kaca tebal 5 mm + Rangka M1 369.60 153,846.43 56,861,638.68
2 Alumunium M2 47.04 134,231.90 6,314,268.58
3 Engsel Jendela Bh 112.00 29,826.50 3,340,568.00
4 Grendel Jendela Bh 112.00 23,408.55 2,621,757.60
5 Hak Anginl Jendela Bh 112.00 37,012.75 4,145,428.00
6 Pas. Jendela Kaca Mati tebal 5 mm M2 35.28 139,979.15 4,938,464.41

i Type J2 ( 4 Unit )
1 Kuzen alumanium M1 38.40 153,846.43 5,907,702.72
2 Pas. Jendela Kaca Mati tebal 5 mm M2 2.52 139,979.15 352,747.46

j Type J3 ( 2 Unit )
1 Pas.
Kuzen alumanium
Jendela Kaca tebal 5 mm + Rangka M1 21.60 153,846.43 3,323,082.78
2 Alumunium M2 1.52 134,231.90 204,032.49
3 Engsel Jendela Bh 4.00 29,826.50 119,306.00
4 Grendel Jendela Bh 4.00 23,408.55 93,634.20
5 Hak Anginl Jendela Bh 4.00 37,012.75 148,051.00
6 Pas. Jendela Kaca Mati tebal 5 mm M2 1.14 139,979.15 159,576.23
k Type J4 ( 1 Unit )
1 Kuzen alumanium M1 5.40 153,846.43 830,770.70
2 Pas. Jendela Kaca Mati tebal 5 mm M2 0.63 139,979.15 88,186.86

l Type J5 ( 8 Unit )
1 Kuzen alumanium M1 19.20 153,846.43 2,953,851.36
2 Pas. Jendela Kaca ES Mati tebal 5 mm M2 1.92 139,979.15 268,759.97

m Type J7 ( 1 Unit )
1 Pas.
Kuzen alumanium
Jendela Kaca tebal 5 mm + Rangka M1 54.48 153,846.43 8,381,553.23
2 Alumunium M2 1.60 134,231.90 214,771.04
3 Engsel Jendela Bh 4.00 29,826.50 119,306.00
4 Grendel Jendela Bh 4.00 23,408.55 93,634.20
5 Hak Anginl Jendela Bh 4.00 37,012.75 148,051.00
6 Pas. Jendela Kaca Mati tebal 5 mm M2 17.19 139,979.15 2,406,241.59

n Type J8 ( 1 Unit )
1 Pas.
Kuzen alumanium
Jendela Kaca tebal 5 mm + Rangka M1 54.48 153,846.43 8,381,553.23
2 Alumunium M2 1.60 134,231.90 214,771.04
3 Engsel Jendela Bh 4.00 29,826.50 119,306.00
4 Grendel Jendela Bh 4.00 23,408.55 93,634.20
5 Hak Anginl Jendela Bh 4.00 37,012.75 148,051.00
6 Pas. Jendela Kaca Mati tebal 5 mm M2 17.19 139,979.15 2,406,241.59
253,442,561.14

C PEKERJAAN DINDING PARTISI


a Type PR3 ( 2 Unit )
1 Kuzen alumanium Natural 4" M1 165.28 153,846.43 25,427,737.12
2 Pas. Pintu Kaca tebal 5 mm + Rangka Alumunium M2 3.36 134,231.90 451,019.18
3 Engsel Pintu Bh 6.00 47,519.15 285,114.90
4 Kunci Pintu Bh 2.00 328,049.00 656,098.00
5 Handel Pintu Bh 4.00 149,811.75 599,247.00
6 Pas.
DoorJendela
Closer Kaca Mati tebal 5 mm + Bh 2.00 225,000.00 450,000.00
7 Sunblasting M2 16.10 134,231.90 2,161,133.59
8 Pas. Ventilasi Kaca Mati tebal 5 mm M2 14.08 139,979.15 1,970,906.43

HARGA JUMLAH TOTAL


NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA HARGA
Pas. Dinding Partisi Gypsumboard 9 mm Finish (Rp.) (Rp.) (Rp.)
9 Tacon M2 41.28 125,000.00 5,160,000.00
10 Pas. List Profil
Alumunium Dinding
Plafond Partisi t.10
Gypsumboard 10 cm
x 10 M1 84.16 45,000.00 3,787,200.00
11 cm
Pas. Cat List Profil Plafond Gypsumboard 10 x M1 42.20 35,000.00 1,477,000.00
12 10 cm M2 12.66 33,090.20 418,921.93

b Type PR4 ( 2 Unit )


1 Kuzen alumanium Natural 4" M1 118.48 153,846.43 18,227,724.43
2 Pas. Pintu Kaca tebal 5 mm + Rangka Alumunium M2 3.36 134,231.90 451,019.18
3 Engsel Pintu Bh 6.00 47,519.15 285,114.90
4 Kunci Pintu Bh 2.00 328,049.00 656,098.00
5 Handel Pintu Bh 4.00 149,811.75 599,247.00
6 Door Closer Bh 2.00 225,000.00 450,000.00
7 Pas. Jendela Kaca Mati tebal 5 mm + Sunblastin M2 11.73 134,231.90 1,574,540.19
8 Pas. Ventilasi Kaca Mati tebal 5 mm M2 10.96 139,979.15 1,534,171.48
9 Pas. Dinding Partisi Gypsumboard 9 mm Finish T M2 30.48 125,000.00 3,810,000.00
10 Pas. List Alumunium Dinding Partisi t.10 cm M1 66.16 45,000.00 2,977,200.00
11 Pas. List Profil Plafond Gypsumboard 10 x 10 cm M1 32.60 35,000.00 1,141,000.00
12 Pas. Cat List Profil Plafond Gypsumboard 10 x 1 M2 9.78 33,090.20 323,622.16

c Type PR5 ( 2 Unit )


1 Kuzen alumanium Natural 4" M1 79.04 153,846.43 12,160,021.43
2 Pas. Jendela Kaca Mati tebal 5 mm + Sunblastin M2 7.10 134,231.90 953,046.49
3 Pas. Ventilasi Kaca Mati tebal 5 mm M2 5.43 139,979.15 760,086.78
4 Pas. Dinding Partisi Gypsumboard 9 mm Finish T M2 18.48 125,000.00 2,310,000.00
5 Pas. List Alumunium Dinding Partisi t.10 cm M1 38.48 45,000.00 1,731,600.00
6 Pas. List Profil Plafond Gypsumboard 10 x 10 cm M1 15.40 35,000.00 539,000.00
7 Pas. Cat List Profil Plafond Gypsumboard 10 x 1 M2 4.62 33,090.20 152,876.72

d Type PR6 ( 2 Unit )


1 Kuzen alumanium Natural 4" M1 73.28 153,846.43 11,273,866.02
2 Pas. Jendela Kaca Mati tebal 5 mm + Sunblastin M2 6.76 134,231.90 907,407.64
3 Pas. Ventilasi Kaca Mati tebal 5 mm M2 5.09 139,979.15 712,493.87
4 Pas. Dinding Partisi Gypsumboard 9 mm Finish T M2 17.66 125,000.00 2,207,500.00
5 Pas. List Alumunium Dinding Partisi t.10 cm M1 37.12 45,000.00 1,670,400.00
6 Pas. List Profil Plafond Gypsumboard 10 x 10 cm M1 14.72 35,000.00 515,200.00
7 Pas. Cat List Profil Plafond Gypsumboard 10 x 1 M2 4.41 33,090.20 145,927.78

e Type PR7 ( 6 Unit )


1 Kuzen alumanium Natural 4" M1 336.00 153,846.43 51,692,398.80
2 Pas. Jendela Kaca Mati tebal 5 mm + Sunblastin M2 28.01 134,231.90 3,759,835.52
3 Pas. Ventilasi Kaca Mati tebal 5 mm M2 21.77 139,979.15 3,047,346.10
4 Pas. Dinding Partisi Gypsumboard 9 mm Finish T M2 72.72 125,000.00 9,090,000.00
5 Pas. List Alumunium Dinding Partisi t.10 cm M1 144.24 45,000.00 6,490,800.00
6 Pas. List Profil Plafond Gypsumboard 10 x 10 cm M1 144.24 35,000.00 5,048,400.00
7 Pas. Cat List Profil Plafond Gypsumboard 10 x 1 M2 18.18 33,090.20 601,579.84

f Type PR8 ( 2 Unit )


1 Kuzen alumanium Natural 4" M1 34.48 153,846.43 5,304,624.73
2 Pas. Jendela Kaca Mati tebal 5 mm + Sunblastin M2 4.12 134,231.90 553,035.43
3 Pas. Ventilasi Kaca Mati tebal 5 mm M2 3.71 139,979.15 519,322.65
4 Pas. Dinding Partisi Gypsumboard 9 mm Finish T M2 10.80 125,000.00 1,350,000.00
5 Pas. List Alumunium Dinding Partisi t.10 cm M1 25.68 45,000.00 1,155,600.00
6 Pas. List Profil Plafond Gypsumboard 10 x 10 cm M1 9.00 35,000.00 315,000.00
7 Pas. Cat List Profil Plafond Gypsumboard 10 x 1 M2 2.70 33,090.20 89,343.54

HARGA JUMLAH TOTAL


NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA HARGA
(Rp.) (Rp.) (Rp.)
g Type PR9 ( 1 Unit )
1 Kuzen alumanium Natural 4" M1 15.68 153,846.43 2,412,311.94
2 Pas. Jendela Kaca Mati tebal 5 mm + Sunblastin M2 1.68 134,231.90 225,509.59
3 Pas. Ventilasi Kaca Mati tebal 5 mm M2 1.44 139,979.15 201,569.98
4 Pas. Dinding Partisi Gypsumboard 9 mm Finish T M2 4.44 125,000.00 555,000.00
5 Pas. List Alumunium Dinding Partisi t.10 cm M1 11.24 45,000.00 505,800.00
6 Pas. List Profil Plafond Gypsumboard 10 x 10 cm M1 3.70 35,000.00 129,500.00
7 Pas. Cat List Profil Plafond Gypsumboard 10 x 1 M2 1.11 33,090.20 36,730.12

h Type PR10 ( 2 Unit )


1 Kuzen alumanium Natural 4" M1 27.12 153,846.43 4,172,315.05
2 Pas. Jendela Kaca Mati tebal 5 mm + Sunblastin M2 2.39 134,231.90 320,814.24
3 Pas. Ventilasi Kaca Mati tebal 5 mm M2 2.06 139,979.15 288,357.05
4 Pas. Dinding Partisi Gypsumboard 9 mm Finish T M2 6.38 125,000.00 797,500.00
5 Pas. List Alumunium Dinding Partisi t.10 cm M1 18.32 45,000.00 824,400.00
6 Pas. List Profil Plafond Gypsumboard 10 x 10 cm M1 5.32 35,000.00 186,200.00
7 Pas. Cat List Profil Plafond Gypsumboard 10 x 1 M2 1.59 33,090.20 52,613.42

i Type PR12 ( 1 Unit )


1 Pas.
Kuzen alumanium
Dinding Natural
Partisi 4"
Gypsumboard 9 mm Lapis M1 28.76 153,846.43 4,424,623.18
2 Tacon WarnaPartisi
Pas. Dinding Terang Gypsumboard 9 mm Lapis M2 9.12 125,000.00 1,140,000.00
3 Tacon Warna Gelap M2 6.84 125,000.00 855,000.00
4 Pas. List Alumunium Dinding Partisi t.10 cm M1 15.24 45,000.00 685,800.00
5 Pas. List Profil Plafond Gypsumboard 10 x 10 cm M1 5.70 35,000.00 199,500.00
6 Pas. Cat List Profil Plafond Gypsumboard 10 x 1 M2 1.71 33,090.20 56,584.24

j Type PR13 ( 1 Unit )


1 Kuzen alumanium Natural 4" M1 84.80 153,846.43 13,046,176.84
2 Pas. Jendela Kaca Mati tebal 5 mm + Sunblastin M2 7.92 134,231.90 1,063,116.65
3 Pas. Ventilasi Kaca Mati tebal 5 mm M2 15.24 139,979.15 2,133,282.25
4 Pas. Dinding Partisi Gypsumboard 9 mm Lapis M2 21.19 125,000.00 2,648,750.00
5 Tacon warna
Pas. List Gelap Dinding Partisi t.10 cm
Alumunium M1 39.16 45,000.00 1,762,200.00
6 Pas. List Profil
Cat List Plafond
Profil Gypsumboard
Plafond 10 x10
Gypsumboard 10xcm M1 17.66 35,000.00 618,100.00
7 10 cm M2 5.29 33,090.20 175,047.16
239,447,630.57
D PEKERJAAN PLAFOND
a Plafond Gypsum
1 Pas. Rangka Plafond Primer Hollow 40.20.2 M2 1,057.84 92,902.75 98,276,245.06
2 jarak 60 cm dan
Pas. Plafond Skunder
Gypsum t= 9 Hollow
mm 40.40.2 jarak M2 1,057.84 54,518.63 57,671,982.27
3 Pas List Plafond Gypsum T 10 cm M' 608.22 43,682.75 26,568,722.21
4 Cat Plafond Gypsum dan List Plafond M2 1,118.66 33,309.10 37,261,557.81

b Plafond Akustik
1 Pas. Rangka Plafond Primer Hollow 40.20.2 M2 86.32 92,902.75 8,019,365.38
2 jarak 60 cm dan
Pas. Plafond Skunder
Akustik t= 4 Hollow
mm 60 40.40.2
x 60 cmjarak M2 86.32 85,000.00 7,337,200.00

235,135,072.72

HARGA JUMLAH TOTAL


NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA HARGA
(Rp.) (Rp.) (Rp.)
E PEKERJAAN LANTAI
1 Pas. Granite 60 x 60 cm M2 1,008.74 475,040.91 479,191,814.95
2 Pas Keramik Unpolished 30 x 30 cm M2 43.14 328,281.59 14,162,395.97
3 Pas. Plint Granite 15 x 60 cm M2 74.52 475,040.91 35,400,760.99

528,754,971.90

F PEKERJAAN FINISING TANGGA


a Tangga Detail A
1 Pas. Hand Railling Pipa Galvanis Ф 2,5, Tiang M1 4.28 850,000.00 3,638,000.00
Railling Pipa Galvanis Ф 2,5 dan Pipa Galvanis Ф 1
b Tangga Detail B
1 Pas. Hand Railling Pipa Galvanis Ф 2,5, Tiang M1 4.28 850,000.00 3,638,000.00
Railling Pipa Galvanis Ф 2,5 dan Pipa Galvanis Ф 1
7,276,000.00

G PEKERJAAN TOILET (WC) dan ACCESSORIES


a Toilet B
1 Pasangan Batu Bata 1 : 2 M2 41.39 149,267.70 6,178,190.10
2 Pasangan Batu Bata 1 : 4 M2 30.93 142,383.80 4,403,930.93
3 Plesteran 1 : 2 M2 82.78 83,656.33 6,925,070.73
4 Plesteran 1 : 4 M2 61.85 69,944.06 4,326,039.99
5 Acian M2 103.24 75,750.95 7,820,528.16
6 Pengecatan M2 103.24 33,090.20 3,416,232.25
7 Lantai Lapis Membran M2 6.08
7 Keramik lantai Unpolished 20 X 20 cm M2 17.04 231,013.67 3,936,472.99
8 Keramik Dinding 20 x 40 M2 50.29 327,324.86 16,461,167.03
9 Keramik Border Dinding 10 x 20 M1 29.85 75,000.00 2,238,750.00
10 Kloset Jongkok (setara KIA) Bh 4.00 588,468.10 2,353,872.40
11 Pas. Batu Bata 1:2 (1/2 bata) peninggian closet M2 0.96 149,267.70 143,296.99
12 Urugan Pasir Peninggian Closet M3 0.62 153,180.00 94,971.60
13 Beton K-100 Peninggian Closet M3 0.19 732,797.22 139,231.47
14 Plasteran 1 : 2 cm Peninggian Closet M2 3.69 83,656.33 308,691.85
15 Kran Air (standar American F062M022) Bh 4.00 91,453.75 365,815.00
16 Wastafel lengkap +Acecoris + Cermin Bh 2.00 2,046,183.50 4,092,367.00
17 Beton Wastafel K-175 M3 0.09 847,285.37 76,255.68
18 Keramik Beton Wastafel 20 x 20 cm M2 3.76 227,797.32 856,517.94
19 Floar Drain Bh 6.00 370,370.55 2,222,223.30

b Toilet D
1 Pasangan Batu Bata 1 : 2 M2 77.78 149,267.70 11,610,041.71
2 Pasangan Batu Bata 1 : 4 M2 55.32 142,383.80 7,876,671.82
3 Plesteran 1 : 2 M2 155.56 83,656.33 13,013,578.20
4 Plesteran 1 : 4 M2 116.99 69,944.06 8,182,755.35
5 Acian M2 272.55 75,750.95 20,645,921.64
6 Pengecatan M2 272.55 33,090.20 9,018,734.01
7 Lantai Lapis Membran M2 9.96
7 Keramik lantai Unpolished 30 X 30 cm M2 20.90 328,281.59 6,861,085.18
8 Keramik lantai Unpolished 20 X 20 cm M2 24.12 231,013.67 5,572,049.79
9 Keramik Dinding 20 x 40 M2 77.48 327,324.86 25,361,129.88
10 Keramik Border Dinding 10 x 20 M1 45.97 75,000.00 3,447,750.00
11 Kloset Jongkok (setara KIA) Bh 4.00 588,468.10 2,353,872.40
12 Pas. Batu Bata 1:2 (1/2 bata) peninggian closet M2 0.96 149,267.70 143,296.99
HARGA JUMLAH TOTAL
NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA HARGA
(Rp.) (Rp.) (Rp.)
13 Urugan Pasir Peninggian Closet M3 0.62 153,180.00 94,971.60
14 Beton K-100 Peninggian Closet M3 0.19 732,797.22 139,231.47
15 Plasteran 1 : 2 cm Peninggian Closet M2 3.69 83,656.33 308,691.85
16 Wastafel lengkap +Acecoris + Cermin Bh 2.00 2,046,183.50 4,092,367.00
17 Beton Wastafel K-175 M3 0.09 847,285.37 76,255.68
18 Keramik Beton Wastafel 20 x 20 cm M2 3.76 227,797.32 856,517.94
19 Kran Air (standar American F062M022) Bh 4.00 91,453.75 365,815.00
20 Floar Drain Bh 13.00 370,370.55 4,814,817.15
21 Wastafel Zink 60 x 193 cm lengkap +Acecoris Bh 1.00 588,611.65 588,611.65
22 Keramik
Beton Wastafel
20 x 20Zink 60 x 193
cm Beton cm K-175
Wastafel Zink 60 x M3 0.07 847,285.37 59,309.98
23 193 cm M2 1.05 231,013.67 242,564.36
24 Wastafel Zink 60 x 105 cm lengkap +Acecoris Bh 1.00 588,611.65 588,611.65
25 Keramik
Beton Wastafel
20 x 20Zink 60 x 105
cm Beton cm K-175
Wastafel Zink 60 x M3 0.02 847,285.37 16,945.71
26 105 cm M2 0.31 231,013.67 71,614.24

c Toilet E
1 Pasangan Batu Bata 1 : 2 M2 17.77 149,267.70 2,652,487.03
2 Pasangan Batu Bata 1 : 4 M2 27.83 142,383.80 3,962,541.15
3 Plesteran 1 : 2 M2 35.55 83,656.33 2,973,982.42
4 Plesteran 1 : 4 M2 55.66 69,944.06 3,893,086.27
5 Acian M2 91.21 75,750.95 6,909,244.22
6 Pengecatan M2 91.21 33,090.20 3,018,157.14
7 Lantai Lapis Membran M2 6.07
7 Keramik lantai Unpolished 20 X 20 cm M2 6.07 231,013.67 1,402,253.00
8 Keramik Dinding 20 x 40 M2 18.95 327,324.86 6,202,806.03
9 Keramik Border Dinding 10 x 20 M1 11.19 75,000.00 839,250.00
10 Kloset Duduk (setara KIA) Bh 1.00 1,362,865.00 1,362,865.00
11 Wastafel lengkap +Acecoris + Cermin Bh 1.00 2,046,183.50 2,046,183.50
12 Beton Wastafel K-175 M3 0.04 847,285.37 33,891.41
13 Keramik Beton Wastafel 20 x 20 cm M2 0.48 227,797.32 109,342.72
14 Kran Air Jet Spray (standar American F062M0 Bh 1.00 150,000.00 150,000.00
15 Floar Drain Bh 1.00 370,370.55 370,370.55
16 Kran Air + Shower + Accessories (standar Bh 1.00 350,000.00 350,000.00
American F062M022)
229,039,298.09

H PEKERJAAN CUTTING PLAT Dan UKIRAN 3


a Type CP-1 (2 Unit)
1 Pas. Cutting Plat Pola By Order / Ukiran Motif M2 27.00 2,500,000.00 67,500,000.00

b Type CP-2 (4 Unit)


1 Pas. Cutting Plat Pola By Order / Ukiran Motif M2 81.84 2,500,000.00 204,600,000.00

c Type CP-3 (2 Unit)


1 Pas. Cutting Plat Pola By Order / Ukiran Motif M2 3.60 2,500,000.00 9,000,000.00
d Type CP-4 (14 Unit)
1 Kaluak Paku M2 52.08 2,500,000.00 130,200,000.00

HARGA JUMLAH TOTAL


NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA HARGA
(Rp.) (Rp.) (Rp.)
e Type CP-5 (1 Unit)
1 Kaluak Paku M2 35.28 2,500,000.00 88,200,000.00
2 Tulisan Stainless Steel " BADAN M1 10.15 750,000.00 7,612,500.00
3 Logo Stainless Steel Uk. 150 x 166 cm Unit 1.00 7,500,000.00 7,500,000.00

514,612,500.00
RENCANA ANGGARAN BIAYA
LANTAI DAG + 8.30, LANTAI DAG + 9.50 DAN ATAP

KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATUR


PEKERJAAN : PENYUSUNAN DED GEDUNG KANTOR BPMPTSP KOTA PADANG
LOKASI : AIE PACAH - PADANG
TAHUN ANGGARAN : 2018

HARGA JUMLAH TOTAL


NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA HARGA
(Rp.) (Rp.) (Rp.)
V PEKERJAAN LANTAI DAG +8.30, LANTAI DAG +9.50 DAN ATAP
LANTAI DAG +8.30
A PEKERJAAN DINDING BATA
a BIDANG LUAR
1 Pas. Afweerking Dinding Lantai Dag M2 100.84 64,997.58 6,554,420.64
2 Pas. Cat Dinding Afweerking Dag M2 100.84 33,309.10 3,358,922.95
3 Pekerjaan Kolom Praktis 13 x 13 cm
a Beton K 175 M3 0.18 847,285.37 152,511.37
b Pembesian Kg 25.85 15,434.15 398,972.78
c Bekisting M2 2.91 393,415.00 1,144,837.65
d Afweerking M2 1.31 64,997.58 85,146.83
Jumlah 11,694,812.21

B PEKERJAAN PINTU DAN JENDELA


a Type P16 ( 2 Unit )
1 Kuzen alumanium M1 9.40 153,846.43 1,446,156.40
2 Pas. Pintu Alumunium Strip M2 6.33 691,305.25 4,374,579.62
3 Engsel Pintu Bh 12.00 47,519.15 570,229.80
4 Kunci Pintu Bh 2.00 328,049.00 656,098.00
5 Handel Pintu Besi Bh 8.00 149,811.75 1,198,494.00
6 Grendel Pintu Bh 4.00 28,497.58 113,990.30

b Type J2 ( 30 Unit )
1 Kuzen alumanium M1 162.00 153,846.43 24,923,120.85
2 Pas. Jendela Kaca Mati tebal 5 mm M2 18.90 139,979.15 2,645,605.94
35,928,274.90

C PEKERJAAN PLAFOND
a Plafond GRC
1 Pas. Rangka Plafond Primer Hollow M2 177.20 92,902.75 16,462,367.30
2 40.20.2 jarakGRC
Pas. Plafond 60 t=
cm9dan
mmSkunder Hollow M2 177.20 54,518.63 9,660,700.35
3 Pas List Plafond GRC T 10 cm M1 325.74 43,682.75 14,229,218.99
4 Cat Plafond GRC dan List Plafond M2 209.77 37,688.38 7,905,890.42
48,258,177.06

LANTAI DAG +9.50


A PEKERJAAN DINDING BATA
a BIDANG LUAR
1 Pas. Afweerking Dinding Lantai Dag M2 13.43 64,997.58 873,112.45
2 Pas. Cat Dinding Afweerking Dag M2 13.43 33,309.10 447,441.14
3 Pekerjaan Kolom Praktis 13 x 13 cm
a Beton K 175 M3 0.04 847,285.37 33,891.41
b Pembesian Kg 5.53 15,434.15 85,350.85
c Bekisting M2 0.62 393,415.00 243,917.30
d Afweerking M2 0.28 64,997.58 18,199.32

Jumlah 1,701,912.48

B PEKERJAAN PINTU DAN JENDELA


a Type J2 ( 6 Unit )
1 Kuzen alumanium M1 32.40 153,846.43 4,984,624.17
2 Pas. Jendela Kaca Mati tebal 5 mm M2 3.78 139,979.15 529,121.19

Jumlah 5,513,745.36

C PEKERJAAN PLAFOND
a Plafond GRC
1 Pas. Rangka Plafond Primer Hollow M2 30.08 92,902.75 2,794,514.72
40.20.2 jarak 60 cm dan Skunder Hollow
NABILA RIZQA / 1610015410032
2 Pas. Plafond GRC t= 9 mm M2 30.08 54,518.63 1,639,920.24
3 Pas List Plafond GRC T 10 cm M1 53.52 43,682.75 2,337,900.78
4 Cat Plafond GRC dan List Plafond M2 35.43 37,688.38 1,335,299.13

8,107,634.87

D PEKERJAAN LANTAI
a Lantai Dag + 7.20
1 Pas. Waterproofing Membran M2 513.30 -

b Lantai Dag +8.30


1 Pas. Waterproofing Membran M2 258.84 - -

c Lantai Dag + 9.50


1 Pas. Waterproofing Membran M2 39.40 - -

ATAP
A PEKERJAAN ATAP
1 Pekerjaan Rangka Atap Baja Ringan M2 1,346.58 347,300.00 467,668,345.36
2 Pekerjaan Atap Genteng Metal Berpasir T = M2 1,346.58 183,850.50 247,569,994.61
3 Pekerjaan Parabung Atap M1 95.61 123,067.25 11,766,582.84
4 Pekerjaan Jurai dalam Atap M1 16.06 123,067.25 1,976,460.04
5 Pekerjaan Lesplang Zingkalum M1 168.70 88,435.00 14,918,630.76
6 Ukiran GRC Detail 1 Atap M2 39.26 2,500,000.00 98,140,000.00
7 Ukiran GRC Detail 2 Atap M2 46.09 2,500,000.00 115,235,000.00

957,275,013.61

NABILA RIZQA / 1610015410032


RENCANA ANGGARAN BIAYA
PEKERJAAN LANDSCAPE

KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATUR


PEKERJAAN : PENYUSUNAN DED GEDUNG KANTOR BPMPTSP KOTA PADANG
LOKASI : AIE PACAH - PADANG
TAHUN ANGGARAN : 2018

HARGA JUMLAH TOTAL


NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA HARGA
(Rp.) (Rp.) (Rp.)

VI PEKERJAAN LANDSCAPE
1 Pekerjaan Timbunan Site M3 2,447.79 178,250.00 436,318,695.84
2 Pekerjaan Bagian Rumput
a Urugan Tanah M3 113.10 178,250.00 20,160,609.75
b Urugan Tanah Humus M3 105.56 75,000.00 7,917,210.00
c Tanam Rumput Gajah Mini M2 754.02 35,000.00 26,390,700.00
d Tanam Pohon The - Tehan M2 117.00 15,000.00 1,755,000.00
e Tanam Pohon Perdu Ketapang Kencana t. 3 m Btg 24.00 450,000.00 10,800,000.00
3 Pekerjaan Kanstin Bagian Rumput
a Lantai Kerja K-100 M3 2.79 673,136.57 1,877,105.27
b Pekerjaan Kansting K-225 Kg 17.22 891,625.73 15,357,071.72
4 Pekerjaan Bagian Pedestrian
a Urugan Tanah M2 10.65 178,250.00 1,897,961.44
b Urugan pasir t. 5 cm M2 3.55 202,730.00 719,539.45
c Pas. Paving Block Segi Empat k-225 M2 70.99 154,566.50 10,971,903.00
d Tanam Pohon Perdu Ketapang Kencana t. 3 m Btg 5.00 450,000.00 2,250,000.00
5 Pekerjaan Kanstin Bagian Pedestrian
a Lantai Kerja K-100 M2 1.21 673,136.57 815,210.79
b Pekerjaan Kansting K-225 M2 7.48 891,625.73 6,669,445.13
6 Pekerjaan Bagian Jalan
a Urugan pasir t. 5 cm M2 99.17 202,730.00 20,103,994.14
b Pas. Paving Block Segi Enam k-225 M2 1,983.33 154,566.50 306,555,912.75

Jumlah 870,560,359.28

NABILA RIZQA / 1610015410032


RENCANA ANGGARAN BIAYA
PEKERJAAN ELEKTRIKAL MEKANIKAL

KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATUR


PEKERJAAN : PENYUSUNAN DED GEDUNG KANTOR BPMPTSP KOTA PADANG
LOKASI : AIE PACAH - PADANG
TAHUN ANGGARAN : 2016

HARGA JUMLAH JUMLAH


NO. URAIAN PEKERJAAN SAT VOLUME SATUAN HARGA BESAR
(Rp.) (Rp.) (Rp.)
1 2 3 4 5 6 7
I PEKERJAAN ELEKTRIKAL
A. Pekerjaan Instalasi Listrik Gedung
a. Penerangan Dasar
1 Pas. Instalasi Titik Lampu Ttk 22.00 256,500.00 5,643,000.00
2 Pas. Instalasi Titik Stop Kontak Ttk 6.00 292,380.00 1,754,280.00
3 Pas. Exaust Fan Ventilasi 60X60 Ttk 6.00 1,250,000.00 7,500,000.00
4 Pas. Lampu Balok 1X36 Watt Bh 22.00 300,000.00 6,600,000.00
5 Pas. Saklar Tunggal Bh 7.00 30,000.00 210,000.00
6 Pas. Stop Kontak Bh 6.00 39,600.00 237,600.00
Penerangan Lantai Dasar 21,944,880.00
b. Penerangan Lantai 1
1 Pas. Instalasi Titik Lampu Ttk 143.00 256,500.00 36,679,500.00
2 Pas. Instalasi Titik Stop Kontak Ttk 39.00 292,380.00 11,402,820.00
3 Pas. Instalasi Titik Stop Kontak Lantai Ttk 45.00 292,380.00 13,157,100.00
4 Pas. Lampu RM Mounted 2X28 Watt Ttk 59.00 500,000.00 29,500,000.00
5 Pas. Lampu ID LED Ceiling INBOW 18 Watt Bh 72.00 300,000.00 21,600,000.00
6 Pas. Lampu ID LED Ceiling INBOW 12 Watt Bh 12.00 200,000.00 2,400,000.00
7 Pas. Exaust Fan Plafon 20X20 Bh 19.00 475,000.00 9,025,000.00
8 Pas. Saklar Tunggal Bh 63.00 30,000.00 1,890,000.00
9 Pas. Stop Kontak Bh 39.00 39,600.00 1,544,400.00
10 Pas. Stop Kontak Lantai Stainles Bh 45.00 350,000.00 15,750,000.00
Penerangan Lantai 1 142,948,820.00
c. Penerangan Lantai 2
1 Pas. Instalasi Titik Lampu Ttk 157.00 256,500.00 40,270,500.00
2 Pas. Instalasi Titik Stop Kontak Ttk 48.00 292,380.00 14,034,240.00
3 Pas. Instalasi Titik Stop Kontak Lantai Ttk 61.00 292,380.00 17,835,180.00
4 Pas. Lampu RM Mounted 2X28 Watt Bh 55.00 500,000.00 27,500,000.00
5 Pas. Lampu ID LED Ceiling INBOW 18 Watt Bh 90.00 300,000.00 27,000,000.00
6 Pas. Lampu ID LED Ceiling INBOW 12 Watt Bh 12.00 200,000.00 2,400,000.00
7 Pas. Exaust Fan Plafon 20X20 Bh 14.00 475,000.00 6,650,000.00
8 Pas. Saklar Tunggal Bh 65.00 30,000.00 1,950,000.00
9 Pas. Stop Kontak Bh 48.00 39,600.00 1,900,800.00
10 Pas. Stop Kontak Lantai Stainles Bh 61.00 350,000.00 21,350,000.00
11 Pas. Fotoshell Bh 2.00 120,000.00 240,000.00
Penerangan Lantai 2 161,130,720.00
Sub Total Pekerjaan Instalasi Listrik Gedung 326,024,420.00 326,024,420.00
B. Pek. CCTV
a. Peralatan Utama CCTV
1 Master CCTV Set 1.00 48,000,000.00 48,000,000.00
Multiplexer 16 channel c/w matrix switchers
Rack untuk monitor lengkap dengan consule panel monitor dan control untuk
penempatan switcher dan accesoriesnya.
UPS 1 kVA
Spot 32" colour video monitor
Split 32" colour video monitor
Panel power CCTV distribution
2 Test Commissionig Ls 1.00 3,000,000.00 3,000,000.00
Peralatan Utama CCTV 51,000,000.00

b. Instalasi CCTV Lantai Dasar


1 Pas. Instalasi CCTV Ttk 11.00 611,200.00 6,723,200.00
2 Indoor colour camera 1/3" high resolution CCD, fixed type Unit 5.00 3,600,000.00 18,000,000.00
3 Pan/tilt/zoom camera colour dome type preset alarm 360º Unit 6.00 12,400,000.00 74,400,000.00
(22 x zoom) super dynamic II low light at B/W

Instalasi CCTV Lantai Dasar 99,123,200.00

c. Instalasi CCTV Lantai 1


1 Pas. Instalasi CCTV Ttk 7.00 611,200.00 4,278,400.00
2 Indoor colour camera 1/3" high resolution CCD, fixed type Unit 7.00 3,600,000.00 25,200,000.00
Instalasi CCTV Lantai 1 29,478,400.00

D. Instalasi CCTV Lantai 2


1 Pas. Instalasi CCTV Ttk 5.00 611,200.00 3,056,000.00
2 Indoor colour camera 1/3" high resolution CCD, fixed type Unit 5.00 3,600,000.00 18,000,000.00

Instalasi CCTV Lantai 2 21,056,000.00


Sub Total Pekerjaan CCTV 200,657,600.00 200,657,600.00

C. Pek. Telephone & PABX


a. Peralatan Utama Lantai 1
1 Master PABX Unit 1.00 53,650,000.00 53,650,000.00
PABX 10/100 ext
MDF - Telepon 200 pairs
Key Digital Display Telpon + Handsfree
2 Test Commissionig Ls 1.00 3,000,000.00 3,000,000.00

Peralatan Utama Lantai dasar 56,650,000.00

b. Instalasi Telepon Lantai I


1 Instalasi Telephone Ttk 20.00 495,660.00 9,913,200.00
2 Pas. Outlet Telephone Bh 20.00 38,000.00 760,000.00
3 Pas. Key Telpon Standart Bh 20.00 175,000.00 3,500,000.00
4 Terminal Box 60 Pairs Unit 1.00 1,700,000.00 1,700,000.00
5 Pas. Kabel R_V(pe)-20x20x0,6mm ke MDF M1 180.00 13,000.00 2,340,000.00

Instalasi Telephone Lantai 1 18,213,200.00

c. Instalasi Telepon Lantai 2


1 Instalasi Telephone Ttk 20.00 495,660.00 9,913,200.00
2 Pas. Outlet Telephone Bh 20.00 38,000.00 760,000.00
3 Pas. Key Telpon Standart Bh 20.00 175,000.00 3,500,000.00
4 Terminal Box 40 Pairs Unit 1.00 1,200,000.00 1,200,000.00
5 Pas. Kabel R_V(pe)-20x20x0,6mm ke MDF M1 180.00 13,000.00 2,340,000.00

Instalasi Telephone Lantai 2 17,713,200.00


Sub Total Pekerjaan Telephone dan PABX 92,576,400.00 92,576,400.00

D. Pek. Intalasi Network


a. Instalasi Lantai I
1 Master Server Data Unit 1.00 5,000,000.00 5,000,000.00
2 Pas. Instalasi Titik Data UTP CAT.6 Unit 20.00 401,500.00 8,030,000.00
3 Pas. Outlet Data Unit 20.00 113,900.00 2,278,000.00
4 Pas. Acces Point Wireless / Hot Spot Unit 3.00 3,083,300.00 9,249,900.00
5 Pas. 19" Rack 8U Unit 1.00 3,468,300.00 3,468,300.00
6 Pas.hub / Switch 24 port Unit 3.00 3,440,800.00 10,322,400.00

Instalasi Data Lantai 1 38,348,600.00

b. Instalasi Lantai 2
1 Pas. Instalasi Titik Data UTP CAT.6 Unit 20.00 401,500.00 8,030,000.00
2 Pas. Outlet Data Unit 20.00 113,900.00 2,278,000.00
3 Pas. Acces Point Wireless / Hot Spot Unit 4.00 3,083,300.00 12,333,200.00
4 Pas. 19" Rack 8U Unit 1.00 3,468,300.00 3,468,300.00
5 Pas.hub / Switch 24 port Unit 3.00 3,440,800.00 10,322,400.00

Instalasi Data Lantai 2 36,431,900.00


Sub Total Pekerjaan Instalasi Data Network 74,780,500.00 74,780,500.00

E. Pek. MATV
a. Peralatan Utama MATV
Pengadaan, pemasangan dan pengujian instalasi MATV System lengkap dengan
Modulator, Combiner, Hotel Info System, LCD Monitor 21 colour, booster
dan material bantu sert accessories lainnya sesuai dengan gambar rencana
dan spesifikasi teknis

Master MATV Set 1.00 44,500,000.00 44,500,000.00


- LED Monitor 32" Color
- CPU Computer + Key Board + Mouse
- Modulator
- Combiner active
- Booster Amplifier
- DVD Player

Peralatan Utama MATV 44,500,000.00

b. Instalasi MATV Lantai Dasar


1 Pas. Instalasi MATV Ttk 1.00 523,200.00 523,200.00
2 Pas. TV LED Monitor 32" Color + Bricket unit 1.00 5,150,000.00 5,150,000.00
3 Pas. Outlet TV Bh 1.00 33,000.00 33,000.00

Instalasi MATV Lantai Dasar 5,706,200.00

c. Instalasi MATV Lantai 1


1 Pas. Instalasi MATV Ttk 5.00 523,200.00 2,616,000.00
2 Pas. TV LED Monitor 32" Color + Bricket unit 5.00 5,150,000.00 25,750,000.00
3 Pas. Outlet TV Bh 5.00 33,000.00 165,000.00

Instalasi MATV Lantai 1 28,531,000.00

c. Instalasi MATV Lantai 2


1 Pas. Instalasi MATV Ttk 5.00 523,200.00 2,616,000.00
2 Pas. TV LED Monitor 32" Color + Bricket unit 5.00 5,150,000.00 25,750,000.00
3 Pas. Outlet TV Bh 5.00 33,000.00 165,000.00

Instalasi MATV Lantai 2 28,531,000.00


Sub Total Pekerjaan MATV 107,268,200.00 107,268,200.00

F. Pek. FIRE ALARM


a. Peralatan Utama Fire Alarm
1 MCFA, analog addressable system 6 zone unit 1.00 19,500,000.00 19,500,000.00
2 Remote LCD annunciator unit 1.00 8,000,000.00 8,000,000.00
3 Module Interface unit 1.00 1,600,000.00 1,600,000.00
4 Terminal Box Fire Alarm (TBFA) 24 pairs unit 1.00 400,000.00 400,000.00
5 Test Commissionig Ls 1.00 3,000,000.00 3,000,000.00

Peralatan Utama Fire Alarm 32,500,000.00

b. Instalasi Fire Alarm Lantai Dasar


1 Pas. Instalasi Fire Alarm Ttk 19.00 270,400.00 5,137,600.00
2 Pas. Module Interface unit 1.00 2,000,000.00 2,000,000.00
3 Pas. Manual Break Glass unit 1.00 220,000.00 220,000.00
4 Pas. Alram Bell 24 VDC 6" Bh 3.00 302,500.00 907,500.00
5 Pas. Indicating Lamp + Led Bh 3.00 99,000.00 297,000.00
6 Pas. Terminal Box Fire Alarm (TBFA) 24 pairs Bh 1.00 577,500.00 577,500.00
7 Pas. Photoelectric Smoke Detector Bh 9.00 575,300.00 5,177,700.00
8 Pas. Rated of Rise Heat Detector Bh 9.00 275,000.00 2,475,000.00
9 Pas. Temperature Detector Bh 1.00 575,300.00 575,300.00
Instalasi Fire Alarm Lantai Dasar 17,367,600.00

c. Instalasi Fire Alarm Lantai 1


1 Pas. Instalasi Fire Alarm Ttk 55.00 270,400.00 14,872,000.00
2 Pas. Module Interface unit 1.00 2,000,000.00 2,000,000.00
3 Pas. Manual Break Glass Bh 1.00 220,000.00 220,000.00
4 Pas. Alram Bell 24 VDC 6" Bh 3.00 302,500.00 907,500.00
5 Pas. Indicating Lamp + Led Bh 3.00 99,000.00 297,000.00
6 Pas. Terminal Box Fire Alarm (TBFA) 24 pairs Bh 1.00 577,500.00 577,500.00
7 Pas. Photoelectric Smoke Detector Bh 27.00 575,300.00 15,533,100.00
8 Pas. Rated of Rise Heat Detector Bh 27.00 275,000.00 7,425,000.00
9 Pas. Temperature Detector Bh 1.00 575,300.00 575,300.00
Instalasi Fire Alarm Lantai 1 41,832,100.00
d. Instalasi Fire Alarm Lantai 2
1 Pas. Instalasi Fire Alarm Ttk 70.00 270,400.00 18,928,000.00
2 Pas. Module Interface unit 1.00 2,000,000.00 2,000,000.00
3 Pas. Manual Break Glass Bh 1.00 220,000.00 220,000.00
4 Pas. Alram Bell 24 VDC 6" Bh 3.00 302,500.00 907,500.00
5 Pas. Indicating Lamp + Led Bh 3.00 99,000.00 297,000.00
6 Pas. Terminal Box Fire Alarm (TBFA) 24 pairs Bh 1.00 577,500.00 577,500.00
7 Pas. Photoelectric Smoke Detector Bh 34.00 575,300.00 19,560,200.00
8 Pas. Rated of Rise Heat Detector Bh 34.00 275,000.00 9,350,000.00
9 Pas. Temperature Detector Bh 2.00 575,300.00 575,300.00
Instalasi Fire Alarm Lantai 2 51,840,200.00
Sub Total Pekerjaan Fire Alarm 144,690,500.00 143,539,900.00

G Pek. Sound System


a. Peralatan Utama Sound System
1 Pre Recorder Evaluation unit 1.00 6,500,000.00 6,500,000.00
2 Compact Dist / MP3 Player unit 1.00 2,500,000.00 2,500,000.00
3 SM / FM Tuner unit 1.00 1,850,000.00 1,850,000.00
4 Mixer Amplifier 16 ch unit 1.00 3,500,000.00 3,500,000.00
5 Power Amplifier 2x240 W unit 2.00 4,500,000.00 9,000,000.00
6 Equalizer unit 1.00 2,250,000.00 2,250,000.00
7 10Ch Speaker Selector unit 1.00 3,500,000.00 3,500,000.00
8 Emergency Microphone unit 1.00 750,000.00 750,000.00
9 Wireless Microphone Clipon unit 1.00 2,000,000.00 2,000,000.00
10 Wireless Microphone Hand Held unit 1.00 2,500,000.00 2,500,000.00
11 Microphone Table unit 1.00 3,500,000.00 3,500,000.00
12 MDF – TS unit 1.00 3,800,000.00 3,800,000.00
13 Equipment Rack besi painting powder, c/w Wiring System Ls 1.00 3,500,000.00 3,500,000.00
14 MDF Bh 1.00 900,000.00 900,000.00
15 Test Commissionig Ls 1.00 3,000,000.00 3,000,000.00

Peralatan Utama Sound System 49,050,000.00

b. Instalasi Sound System Lantai Dasar


1 Pas. Instalasi Tata Suara Ttk 10.00 312,700.00 3,127,000.00
2 Ceiling Speaker 3W Bh 10.00 125,000.00 1,250,000.00
3 Terminal Box Bh 1.00 275,000.00 275,000.00

Instalasi Sound System Lantai Dasar 4,652,000.00

c. Instalasi Sound System Lantai 1


1 Pas. Instalasi Tata Suara Ttk 27.00 312,700.00 8,442,900.00
2 Ceiling Speaker 3W Bh 27.00 125,000.00 3,375,000.00
3 Terminal Box Bh 1.00 275,000.00 275,000.00

Instalasi Sound System Lantai 1 12,092,900.00

d. Instalasi Sound System Lantai 2


1 Pas. Instalasi Tata Suara Ttk 33.00 312,700.00 10,319,100.00
2 Ceiling Speaker 3W Bh 33.00 125,000.00 4,125,000.00
3 Terminal Box Bh 1.00 275,000.00 275,000.00
Instalasi Sound System Lantai 2 14,719,100.00
Sub Total Pekerjaan Sound System 80,514,000.00 80,514,000.00

a. Listrik PLN
1 Pemasukan Listrik BP Dan UJL 3 Phase 197 KVA Ls 1.00 157,200,000.00 157,200,000.00
2 Biaya SJI Dan SLO Ls 1.00 26,200,000.00 26,200,000.00

Listrik PLN 183,400,000.00


Sub Total Biaya Penyambungan Listrik 183,400,000.00

b. Kabel Feeder
1 Pas. Kbl dr Panel ATS ke meteran PLN NYFGbY 4x120 mm M1 70.00 706,000.00 49,420,000.00
2 Pas. Kbl dr Panel ATS ke Genset NYY 4x120 mm NYA1x95m M1 35.00 586,000.00 20,510,000.00
3 Pas. Kbl dr Panel ATS ke LVMDP NYY 4x120 mm NYA1x95m M1 10.00 586,000.00 13,814,344.50
4 Pas. Kbl dr LVMDP.ke SDP 1 Lantai 1 NYY 4x16 mm NYA1x1 M1 10.00 115,000.00 1,150,000.00
5 Pas. Kbl dr LVMDP.ke SDP 2 Lantai 1 NYY 4x16 mm NYA1x1 M1 40.00 115,000.00 4,600,000.00
6 Pas. Kbl dr LVMDP.ke SDP 3 Lantai 1 NYY 4x16 mm NYA1x1 M1 40.00 115,000.00 4,600,000.00
7 Pas. Kbl dr LVMDP.ke SDP 4 Lantai 1 NYY 4x16 mm NYA1x1 M1 60.00 115,000.00 6,900,000.00
8 Pas. Kbl dr LVMDP.ke SDP 5 Lantai 1 NYY 4x16 mm NYA1x1 M2 60.00 115,000.00 6,900,000.00
9 Pas. Kbl dr LVMDP.ke SDP 6 Lantai 1 FRC 4x70 mm NYA1x7 M1 15.00 500,000.00 7,500,000.00
10 Pas. Kbl dr LVMDP.ke SDP 7 Lantai 1 FRC 4x70 mm NYA1x7 M1 15.00 500,000.00 7,500,000.00
11 Pas. BOX TERMINANG GROUND Unit 1.00 1,500,000.00 1,500,000.00

Kabel Feeder 307,794,344.50 124,394,344.50

I. Pek. Panel
a. Low Voltage Main Distribution Panel (LVMDP)
1 Low Voltage Main Distribusi Panel ( LVMDP ) Unit 1.00 42,509,500.00 42,509,500.00
Lemari Besi 45 x 65 x 180 3Phase lengkap dengan Accesorries
Include Sparing Pipa GIP Ф 4" Bawah Lantai

Low Voltage Main Distribution Panel (LVMDP) 42,509,500.00

b. Automatic transfer Swicth (ATS)


2 Pek. Panel Automatic Transfer Swicth (ATS) 250A Unit 1.00 87,780,000.00 87,780,000.00
3 Pek. Caapasitor Bank 200 KVAR Unit 1.00 117,150,000.00 117,150,000.00
Cafasitor Bank 200 KVAR include with Reactive Power Regulator And
Continuos Digital Power Factor Display 6 Steps

Automatic Transfer Swicth (ATS) 204,930,000.00

c. Panel Ruang Pompa (SDP 4)


1 Pek. Panel PP. Ruang Pompa Fire Hydrant Unit 1.00 15,026,000.00 15,026,000.00
Box Besi 35 x 55 x 90 3 Fhase

Panel Ruang Pompa 15,026,000.00

d. Panel AC (SDP 5)
1 Pek. Panel PP. AC Unit 1.00 19,096,000.00 19,096,000.00
Box Besi Outdoor 35 x 55 x 120 3 Fhase

Panel AC 19,096,000.00

e. Panel SDP 1 Unit 1.00 5,692,500.00 5,692,500.00


f. Panel SDP 2 Unit 1.00 6,055,500.00 6,055,500.00
g. Panel SDP 3 Unit 1.00 6,418,500.00 6,418,500.00
h. Panel SDP 4 Unit 1.00 6,055,500.00 6,055,500.00
i. Panel SDP 5 Unit 1.00 9,075,000.00 9,075,000.00

Panel AC 24,222,000.00

i. Test Commissioning Panel


1 Test Commissionig Ls 1.00 5,000,000.00 5,000,000.00

Test Commissioning Panel 5,000,000.00


Sub Total Pekerjaan Panel 319,858,500.00 435,177,844.50

H. Pek. Penangkal Petir


Radius Proteksi 150 M (non konvensional)
1 Pas. Air Terminal, Radius Proteksi 150 M Ttk 1.00 19,250,000.00 19,250,000.00
2 Obstruction lamp, LED 100W bh 1.00 2,809,400.00 2,809,400.00
3 Down Conductor Cable NYY 1 x 70 mm 2 m' 36.00 242,600.00 8,733,600.00
4 Pas. Instalasi grounding penangkal petir (minimal kedalaman Ttk 1.00 8,481,000.00 8,481,000.00
pembumian □ 1 Ohm)
5 Pas. Test Link unit 1.00 613,300.00 613,300.00
6 Pek. Tower Tree Eangle Penangkal Petir t = 12 M Ls 1.00 2,500,000.00 2,500,000.00
7 Test Commissionig Ls 1.00 2,500,000.00 2,500,000.00

Sub Total Pekerjaan Penangkal Petir 44,887,300.00

I. Pek. Kabel Tray


a. Kabel Tray Lantai Dasar
1 Pas. Cable Tray Elektrikal 300 × 100 mm m' 90.00 395,500.00 35,595,000.00
2 Pas. Duck Kabel m' 24.00 200,000.00 4,800,000.00

Kabel Tray Lantai Dasar 40,395,000.00

b. Kabel Tray Lantai 1


1 Pas. Cable Tray Elektrikal 300 × 100 mm m' 78.00 395,500.00 30,849,000.00
2 Pas. Kabel Tray Elektronik 200 × 100 mm m' 79.00 310,800.00 24,553,200.00
3 Pas. Duck Kabel m' 18.00 200,000.00 3,600,000.00

Kabel Tray Lantai 1 59,002,200.00

c. Kabel Tray Lantai 2


1 Pas. Cable Tray Elektrikal 300 × 100 mm m' 78.00 395,500.00 30,849,000.00
2 Pas. Kabel Tray Elektronik 200 × 100 mm m' 79.00 310,800.00 24,553,200.00
3 Pas. Duck Kabel m' 18.00 200,000.00 3,600,000.00

Kabel Tray Lantai 2 59,002,200.00


Sub Total Pekerjaan Kabel Tray 158,399,400.00

SUB TOTAL PEKERJAAN ELEKTRIKAL 1,857,451,164.50

II PEKERJAAN MEKANIKAL

A. Pek. Instalasi Kebakaran


Peralatan Utama Hydrant (Rumah Pompa)
Pengadaan dan pemasangan peralatan utama instalasi pekerjaan pemadam
kebakaran lengkap dengan accessories dan material bantu lainnya sesuai
dengan gambar rencana dan spesifikasi teknis

a. Peralatan Utama Hydrant (Rumah Pompa)


1 Pas. Gate Valve Ø 6"/150mm Bh 5.00 6,378,900.00 31,894,500.00
2 Pas. Gate Valve Ø 1 1/2"/50mm Bh 2.00 786,500.00 1,573,000.00
3 Pas. Check Valve Ø 6"/150mm Bh 2.00 7,368,900.00 14,737,800.00
4 Pas. Check Valve Ø 1 1/2"/50mm Bh 1.00 1,061,500.00 1,061,500.00
5 Pas. Flexible Joint 10 K Sizs 6"/150mm Bh 4.00 2,418,900.00 9,675,600.00
6 Pas. Flexible Joint 10 K Sizs 1 1/2"/50mm Bh 5.00 616,000.00 3,080,000.00
7 Pas. Y Strainer 10 K Sizs 6" Bh 2.00 3,023,900.00 6,047,800.00
8 Pas. Y Strainer 10 K Sizs 1 1/2" /50mm Bh 1.00 509,300.00 509,300.00
9 Pas. Foot Valve Sizs 6" /150mm Bh 2.00 3,518,900.00 7,037,800.00
10 Pas. Foot Valve Sizs 1 1/2"/50mm Bh 1.00 1,100,000.00 1,100,000.00
11 Pas. Pressure Swicth cap 0 - 10 kg/cm² Bh 1.00 1,199,000.00 1,199,000.00
12 Pas. Pressure Gauge cap 0 - 15 kg/cm² Bh 1.00 423,500.00 423,500.00
13 Pas. Air Release Air Valve (ARV) Dia 25 mm Bh 1.00 1,474,000.00 1,474,000.00
14 Pas. Automatic Air Realase Valve (AARV) dia 25 mm Bh 1.00 2,354,000.00 2,354,000.00
15 Pas. Flow Meter (FM), Diameter 150 mm (6") Bh 1.00 15,948,900.00 15,948,900.00
16 Pas. Priming Tank kapasitas 200L Bh 1.00 2,777,500.00 2,777,500.00
17 Pas. Pipa drain Priming Tank kapasitas 200L ( GIP medium ) M1 9.00 65,500.00 589,500.00
18 Pas. Pipa pengisian priming tank GIP medium Ф 1/2"/20mm M1 12.00 43,500.00 522,000.00
19 Pas. Instalasi pipa suction BSP Sch 40 6"/150mm M1 8.00 651,750.00 5,214,000.00
20 Pas. Instalasi pipa suction GIP medium Ф 1 1/2"/50mm M1 4.00 108,400.00 433,600.00
21 Pas. Pipa Black Steel Sch 40 8"/200mm (Header) M1 6.00 962,500.00 5,775,000.00
22 Pas. Pipa Black Steel Sch 40 6" /150mm M1 23.00 651,750.00 14,990,250.00
23 Pas. Pipa Black Steel Sch 40 1,5" /50mm M1 16.00 99,900.00 1,598,400.00

Peratan Utama Hydrant (R. Pompa) 130,016,950.00

b. Pas. Pompa Hydrant Diesel


1 Pompa Pompa Hydrant Diesel Unit 1.00 178,500,000.00 178,500,000.00
- Horizontal Centrifugal End Suction Pump
- Kapasitas : 500 USGPM
- T. Head : 90 M
- Panel Control
- Setting dipondasi
- Connecting
2 Test Commissionig Ls 1.00 5,000,000.00 5,000,000.00

Pasangan Pompa Hydrant Diesel 183,500,000.00

c. Pas. Pompa Utama Fire Hydrant


1 Pompa Hydrant Electric Versa Std NFPA-20 Unit 1.00 108,000,000.00 108,000,000.00
- Horizontal Centrifugal End Suction Pump
- Kapasitas : 500 USGPM
- T. Head : 90 M
- Panel Control
- Setting dipondasi
- Connecting
2 Test Commissionig Ls 1.00 3,500,000.00 3,500,000.00

Pasangan Pompa Utama Fire Hydrat 111,500,000.00

d. Pas. Pompa Hydrant Jockey


1 Pompa Hydrant Jockey Unit 1.00 28,750,000.00 28,750,000.00
Vertikal Multistage Stanless Steel- setara Versa
- Kapasitas : 25 USGPM
- T. Head : 85 M
- Power : 3 KW/380/3Ph/50Hz
- Putaran : 2900 Rpm
Catatan : Pompa sudah lengkap terkopel
dengan motor diatas baseplate dan masing
masing dilengkapi dengan satu Panel
Control NFPA 20
Pasangan Pompa Hydrant Jockey 28,750,000.00

e. Pek. Instalasi Hydrant Luar Gedung


1 Pas. Pipa Black Steel Sch 40 6" M1 107.00 816,400.00 87,354,800.00
2 Pas. Pipa Black Steel Sch 40 4" M1 14.00 596,800.00 8,355,200.00
3 Pas. Check Valve 10 K Sizs 4" Unit 1.00 7,368,900.00 7,368,900.00
4 Pas. Gate Valve 10 K Sizs 4" Unit 4.00 5,806,900.00 23,227,600.00
5 Pas. Hydrant Box Outdoor Hooseki Type C Set 4.00 4,867,500.00 19,470,000.00
6 Pas. Hydrant Pillar two ways machino Coupling 2,5" Unit 4.00 4,097,500.00 16,390,000.00
7 Pas. Siamese Conection machino Coupling 2,5" Type S7 Unit 1.00 2,948,000.00 2,948,000.00
Instalsi Hydrant Luar Gedung 165,114,500.00

f. Pek. Instalasi Hidrant Lantai dasar


1 Pas. Pipa Black Steel Sch 40 4" M1 12.00 651,750.00 7,821,000.00
2 Pas. Pipa Black Steel Sch 40 3" M1 9.00 357,500.00 3,217,500.00
3 Pas. Pipa Black Steel Sch 40 2,5" M1 6.00 269,500.00 1,617,000.00
4 Pas. Pipa Black Steel Sch 40 1,5" M1 4.00 99,900.00 399,600.00
5 Pas. Gate Valve 10 K Sizs 2 1/2" Kitazawa Unit 2.00 1,776,500.00 3,553,000.00
6 Pas. Hydrant Box Indoor Hooseki Type A2 Set 2.00 4,529,300.00 9,058,600.00
Instalasi Hydrant Lantai Dasar 25,666,700.00

g. Pek. Instalasi Hidrant Lantai 1


1 Pas. Pipa Black Steel Sch 40 4" M1 15.00 651,750.00 9,776,250.00
2 Pas. Pipa Black Steel Sch 40 3" M1 10.00 357,500.00 3,575,000.00
3 Pas. Pipa Black Steel Sch 40 2,5" M1 7.00 269,500.00 1,886,500.00
4 Pas. Pipa Black Steel Sch 40 1,5" M1 4.00 99,900.00 399,600.00
5 Pas. Gate Valve 10 K Sizs 2 1/2" Kitazawa Unit 2.00 1,776,500.00 3,553,000.00
6 Pas. Hydrant Box Indoor Hooseki Type A2 Set 2.00 4,529,300.00 9,058,600.00

Instalasi Hydrant Lantai 1 28,248,950.00

h. Pek. Instalasi Hidrant Lantai 2


1 Pas. Pipa Black Steel Sch 40 4" M1 25.00 651,750.00 16,293,750.00
2 Pas. Pipa Black Steel Sch 40 3" M1 20.00 357,500.00 7,150,000.00
3 Pas. Pipa Black Steel Sch 40 2,5" M1 10.00 269,500.00 2,695,000.00
4 Pas. Pipa Black Steel Sch 40 1,5" M1 4.00 99,900.00 399,600.00
5 Pas. Gate Valve 10 K Sizs 2 1/2" Kitazawa Unit 2.00 1,776,500.00 3,553,000.00
6 Pas. Hydrant Box Indoor Hooseki Type A2 Set 2.00 4,529,300.00 9,058,600.00

Instalasi Hydrant Lantai 2 39,149,950.00


Sub Total Pekerjaan Instalasi Kebakaran 711,947,050.00 711,947,050.00

B. Pek. Instalasi Air Bersih


a. Pas. Pompa Air Bersih
1 Pompa Air Bersih 2WP Unit 1.00 37,620,000.00 37,620,000.00
Type : Horizontal Multistage St. Steel
Kapasitas : (2x) 200L/mnt
Power : ( 2 x ) 0,75 KW/220V/1 ph/50 Hz
T. Head : 40 M
Putaran : 2900Rpm
Motor 2 pole
Protection class IP55
Setara Versa Pump
2 Test Commissionig Ls 1.00 3,500,000.00 3,500,000.00

Catatan : Pompa sudah lengkap terkopel dengan motor diatas


baseplate dan dilengkapi dengan satu Panel Control

Pasang Pompa Air Bersih 41,120,000.00

b. Peralatan Utama Air Bersih (Rumah Pompa)


1 Pas. Check Valve Ø 1 1/2"/50mm bh 2.00 1,061,500.00 2,123,000.00
2 Pas. Flexible Joint 10 K Sizs 1 1/2"/50mm bh 4.00 616,000.00 2,464,000.00
3 Pas. Y Strainer 10 K Sizs 1 1/2"/50mm bh 2.00 509,300.00 1,018,600.00
4 Pas. Foot Valve Sizs 1 1/2"/50mm bh 2.00 1,100,000.00 2,200,000.00
5 Pas. Instalasi pipa suction GIP medium Ф 1 1/2"/50mm M1 3.00 108,400.00 325,200.00
6 Pas. Pipa GIP Ø 1 1/2"/50mm M1 10.00 108,400.00 1,084,000.00
7 Pas. Pipa GIP Ø 1"/32mm M1 4.00 65,500.00 262,000.00
8 Pas. Pipa GIP Ø 3/4"/25mm M1 3.00 50,600.00 151,800.00
9 Pas. Pipa GIP Ø 1/2"/20mm M1 2.00 43,500.00 87,000.00
10 Water Level Control bh 1.00 2,282,500.00 2,282,500.00
11 Pas. Instalasi Pipa GIP Dia. 50 mm (1 1/2") dari Pompa Ke Ro M1 42.00 198,000.00 8,316,000.00

Peralatan Utama Air Bersih 20,314,100.00

c. Instalasi Air Bersih Taman


1 Pas. Instalasi Pipa PPR Dia. 25 mm (1") M1 31.00 130,900.00 4,057,900.00
2 Pas. Instalasi Pipa PPR Dia. 15 mm (1/2") M1 68.00 75,900.00 5,161,200.00
3 Pas. Gate Valve 10 K Sizs 1" Kitazawa bh 1.00 506,000.00 506,000.00

Instalasi Air Bersih Taman 9,725,100.00

d. Instalasi Air Bersih Lantai 1


1 Pas. Instalasi Pipa Tegak GIP Dia. 60 mm (2") M1 6.00 181,500.00 1,089,000.00
2 Pas. Instalasi Pipa PPR Dia. 25 mm (1") M1 116.00 130,900.00 15,184,400.00
3 Pas. Instalasi Pipa PPR Dia. 15 mm (1/2") M1 24.00 75,900.00 1,821,600.00
4 Pas. Gate Valve 10 K Sizs 1" Kitazawa bh 1.00 451,000.00 451,000.00

Instalasi Air Bersih Lantai 1 18,546,000.00

e. Instalasi Air Bersih Lantai 2


1 Pas. Instalasi Pipa Tegak GIP Dia. 60 mm (2") M1 12.00 181,500.00 2,178,000.00
2 Pas. Instalasi Pipa PPR Dia. 25 mm (1") M1 214.00 130,900.00 28,012,600.00
3 Pas. Instalasi Pipa PPR Dia. 15 mm (1/2") M1 171.00 75,900.00 12,978,900.00
4 Pas. Gate Valve 10 K Sizs 1" Kitazawa bh 2.00 451,000.00 902,000.00

Instalasi Air Bersih Lantai 2 44,071,500.00

f. Instalasi Air Bersih Lantai 3


1 Pas. Instalasi Pipa Tegak GIP Dia. 60 mm (2") M1 18.00 181,500.00 3,267,000.00
2 Pas. Instalasi Pipa PPR Dia. 25 mm (1") M1 196.00 130,900.00 25,656,400.00
3 Pas. Instalasi Pipa PPR Dia. 15 mm (1/2") M1 96.00 75,900.00 7,286,400.00
4 Pas. Gate Valve 10 K Sizs 1" Kitazawa bh 2.00 451,000.00 902,000.00

Instalasi Air Bersih Lantai 3 37,111,800.00


Sub Total Pekerjaan Instalasi Air Bersih 170,888,500.00 170,888,500.00

C. Pek. Instalasi Air Bekas, Kotor dan Hujan


a. Instalasi Air Bekas & Kotor Lantai Dasar
1 Pas. Instalasi Pipa PVC Kls AW Ø 4" Air Bekas M1 34.00 184,700.00 6,279,800.00
2 Pas. Instalasi Pipa PVC Kls AW Ø 2" Air Bekas M1 8.00 79,300.00 634,400.00
3 Pas. Instalasi Pipa PVC Kls AW Ø 4" Air Kotor M1 24.00 184,700.00 4,432,800.00
4 Pas. Instalasi Pipa PVC Kls D Ø 1 1/2" Venting M1 6.00 40,000.00 240,000.00
5 Pas. Instalasi Pipa PVC Kls D Ø 1 1/4" Venting M1 4.00 23,700.00 94,800.00
6 Pas. Floor Drain Bh 4.00 395,000.00 1,580,000.00
7 Pas. Clean Out diameter 80 Bh 4.00 165,000.00 660,000.00

Instalasi Air Bekas & Kotor Lantai Dasar 13,921,800.00


b. Instalasi Air Bekas & Kotor Lantai 1
1 Pas. Instalasi Pipa PVC Kls AW Ø 4" Air Bekas M1 171.00 184,700.00 31,583,700.00
2 Pas. Instalasi Pipa PVC Kls AW Ø 2" Air Bekas M1 19.00 79,300.00 1,506,700.00
3 Pas. Instalasi Pipa PVC Kls AW Ø 4" Air Kotor M1 130.00 184,700.00 24,011,000.00
4 Pas. Instalasi Pipa PVC Kls D Ø 1 1/2" Venting M1 12.00 40,000.00 480,000.00
5 Pas. Instalasi Pipa PVC Kls D Ø 1 1/4" Venting M1 8.00 23,700.00 189,600.00
6 Pas. Floor Drain Bh 15.00 395,000.00 5,925,000.00
7 Pas. Clean Out diameter 80 Bh 12.00 165,000.00 1,980,000.00

Instalasi Air Bekas & Kotor Lantai 1 65,676,000.00

c. Instalasi Air Bekas & Kotor Lantai 2


1 Pas. Instalasi Pipa PVC Kls AW Ø 4" Air Bekas M1 142.00 184,700.00 26,227,400.00
2 Pas. Instalasi Pipa PVC Kls AW Ø 2" Air Bekas M1 16.00 79,300.00 1,268,800.00
3 Pas. Instalasi Pipa PVC Kls AW Ø 4" Air Kotor M1 100.00 184,700.00 18,470,000.00
4 Pas. Instalasi Pipa PVC Kls D Ø 1 1/2" Venting M1 16.00 31,400.00 502,400.00
5 Pas. Instalasi Pipa PVC Kls D Ø 1 1/4" Venting M1 12.00 23,700.00 284,400.00
6 Pas. Floor Drain Bh 21.00 395,000.00 8,295,000.00
7 Pas. Clean Out diameter 80 Bh 12.00 165,000.00 1,980,000.00

Instalasi Air Bekas & Kotor Lantai 2 57,028,000.00

d. Pek. Instalasi Air Hujan


1 Pas. Instalasi Pipa PVC Kls AW Ø 4" Air Hujan M1 192.00 161,200.00 30,950,400.00
2 Pas. Roof Drain Besi Tempa bh 16.00 285,000.00 4,560,000.00

Instalasi Air Hujan 35,510,400.00

e. Pek. Saluran Keliling Buis Beton ( Gorong-Gorong)


1 Pas. Buis Beton 60 M1 5.00 289,500.00 1,447,500.00
2 Pas. Saluran Pipa PVC Kls AW Ø 4" Air Hujan M1 10.00 214,200.00 2,142,000.00
3 Bok Kontrol 800x800mm+plat besi 5mm penutup bh 1.00 450,000.00 450,000.00
4 Bok Kontrol 500x500mm+plat besi 5mm penutup bh 1.00 350,000.00 350,000.00

Saluran Keliling Buis Beton ( Gorong-Gorong) 4,389,500.00

F. Pek. Septictank
1 Pek. Septictank Kapasitas 75 Ls 1.00 8,000,000.00 8,000,000.00
2 Pek. Septictank Kapasitas 50 Ls 1.00 6,500,000.00 6,500,000.00
3 Pek. Septictank Kapasitas 20 Ls 1.00 3,500,000.00 3,500,000.00

Septick Tank 18,000,000.00

Sub Total Pekerjaan Instalasi Air Bekas, Kotor dan Hujan 194,525,700.00 194,525,700.00

D. Pek. Rooftank FRP


1 Pas. Roof Tank FRP Panel Kapasitas 6 M3 unit 2.00 36,000,000.00 72,000,000.00
Lengkap dudukan/pondasi
2 Pas. Gate Valve Sizs 1 1/2"/50mm bh 3.00 209,000.00 627,000.00
3 Pas. Inst. Header Ls 1.00 5,500,000.00 5,500,000.00

Sub Total Pekerjaan Instalasi Rooftank FRP 78,127,000.00

E. Water Treatment Plant (WTP)


WTP, Kapasitas 50 m3/hari (termasuk Training Operator se unit 1.00 125,000,000.00 125,000,000.00
Commissioning)
Filtrasi :
'Sand Filter, Kap. 20 ltr/detik unit 1.00 45,000,000.00 45,000,000.00
'Carbon Filter, Kap. 20 ltr/detik unit 1.00 46,000,000.00 46,000,000.00
'Chlorine Tank + pPompa unit 1.00 25,000,000.00 25,000,000.00
Pemipaan & Accessories Ls 1.00 13,000,000.00 13,000,000.00

Sub Total Pekerjaan Water Treatment Plan (WTP) 254,000,000.00

F. Pek. Air Conditioner ( AC )


a. AC Outdoor Lantai 1 Dan 2
1 Multi Digital Scroll RA410A Btuh 64.800 Unit 2.00 76,905,000.00 153,810,000.00
380-415V/3Ph/50Hz, Liquid 3/8" dan Gas 5/8"
2 Multi Digital Scroll RA410A Btuh 51.100 Unit 3.00 69,805,000.00 209,415,000.00
380-415V/3Ph/50Hz, Liquid 3/8" dan Gas 5/8"
3 Multi Digital Scroll RA410A Btuh 46.000 Unit 5.00 56,225,000.00 281,125,000.00
380-415V/3Ph/50Hz, Liquid 3/8" dan Gas 5/8"

AC Outdoor Lantai 1 Dan 2 644,350,000.00

b. Indoor AC Lantai 1 Dan 2


1 VRF Indoor Ceiling Cassette Multi Digital Scroll Btuh 19.100 Unit 12.00 13,630,000.00 163,560,000.00
220-240V/1Ph/50Hz, Cfm H/LM/L 780/660/600
2 VRF Indoor Ceiling Cassette Multi Digital Scroll Btuh 9.600 Unit 30.00 9,810,000.00 294,300,000.00
220-240V/1Ph/50Hz, Cfm H/LM/L 410/360/330

Indoor AC Lantai 1 Dan 2 457,860,000.00

e. AC Wallmounted
1 Compresor Unit (EVB+FCU) (19,100 Btuh) Wall Mounted Unit 1.00 6,500,000.00 6,500,000.00
490 Cfm, 220-240V, 1 Fhase, 50Hz

AC Wallmounted 6,500,000.00

f. Instalasi Pipa AC c/w isolasi Lantai 1


1 Inst. Pipa tembaga Ø 5/8" c/w isolasi m' 50.00 65,000.00 3,250,000.00
2 Inst. Pipa tembaga Ø 3/8" c/w isolasi m' 50.00 55,000.00 2,750,000.00
3 Inst. Pipa Drain PVC Ø 3/4" c/w isolasi m' 25.00 52,800.00 1,320,000.00
4 Inst. Pipa Drain PVC Ø 1/2" c/w isolasi m' 30.00 44,000.00 1,320,000.00
5 Refnet and distribution bh 10.00 520,000.00 5,200,000.00

Instalasi Pipa AC c/w isolasi Lantai 1 13,840,000.00

g. Rak Pipa Refrigrant dan Kabel Power


1 Pas. Kabel Ladder Elektrikal 400 × 100 mm m' 28.00 464,800.00 13,014,400.00

Rak Pipa Refrigrant dan Kabel Power 13,014,400.00

i. Test & Pengujian Pek AC


1 Test Commissionig Ls 1.00 3,500,000.00 3,500,000.00

Test & Pengujian Pek AC 3,500,000.00


Sub Total Pekerjaan Air Conditioner (AC) 1,139,064,400.00 1,139,064,400.00

G. Pek. Genset
1 Pek. Gen-Set 200KVA Silieant Unit 1.00 386,000,000.00 386,000,000.00
3 Pek. Panel AMF Unit 1.00 22,000,000.00 22,000,000.00
3 Pentanahan Ls 1.00 5,000,000.00 5,000,000.00
4 Test Commissionig Ls 1.00 3,500,000.00 3,500,000.00
5 Mobilisasi Ls 1.00 23,000,000.00 23,000,000.00

Sub Total Pekerjaan Genset 439,500,000.00

Sub Total PEKERJAAN MEKANIKAL 2,988,052,650.00

Sub Total PEKERJAAN ELEKTRIKAL DAN MEKANIKAL 4,845,503,814.50


NO URAIAN PEKERJAAN
1 Pekerjaan Pondasi KSLL
a. Waterproofing Lantai Basement
2 PEKERJAAN DINDING PLAT PENAHAN TANAH
a. Dinding Plat D1
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

b. Dinding Plat D1'


- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

c. Dinding Plat D2
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

d. Dinding Plat D3
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

e. Dinding Plat D4
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

f. Dinding Plat D5
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

3 PEKERJAAN KOLOM LANTAI 1


a. Kolom 1A
- Pekerjaan Beton K-300
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

b. Kolom 1B
- Pekerjaan Beton K-300
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

c. Kolom 1C
- Pekerjaan Beton K-300
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

d. Kolom 1D
- Pekerjaan Beton K-300
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

4 PEKERJAAN BALOK LANTAI 1


a. Balok B5-1
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

b. Balok B8-1
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

c. Balok B1-1
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

d. Balok B2-1
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

e. Balok B2'-1
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

f. Balok B3-1
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

g. Balok B4-1
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

h. Balok B5-1
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

i. Balok B6-1
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

j. Balok B7-1
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

k. Balok BA2
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

l. Balok BA3
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

m. Balok BA3'
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

n. Balok BA4
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

o. Balok BT
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

5 PEKERJAAN PLAT LANTAI


a. Plat PL-1
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
b. Plat PL-2
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
c. Plat PL-3
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
d. Plat PL-6
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
e. Plat PL-7
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
f. Plat PL-8
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
g. Plat PL-9
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
h. Plat PL-10
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
i. Plat PL-11
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
j. Plat PL-12
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
k. Plat PL-13
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
l. Plat PL-14
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
m. Plat PL-15
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
n. Plat PL-15'
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
o. Plat PL-16
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
p. Plat PL-17
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
q. Plat PL-18
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

C. PEKERJAAN STRUKTUR LT 2
I. PEKERJAAN KOLOM
a. Kolom 2A
- Pekerjaan Beton K-300
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

b. Kolom 2B
- Pekerjaan Beton K-300
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

c. Kolom 2C
- Pekerjaan Beton K-300
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

d. Kolom 2D
- Pekerjaan Beton K-300
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

II. PEKERJAAN BALOK


a. Balok B1-1
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting

b. Balok B2-1
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting

c. Balok B3-1
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting

d. Balok B4-1
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting

e. Balok B5-1
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting

f. Balok B6-1
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting

g. Balok B7-1
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting

h. Balok B8-1
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting

i. Balok BA1
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting

j. Balok BA2
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting

k. Balok BA3
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting

l. Balok BA3'
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
m. Balok BA4
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting

n. Balok BT
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting

III. PEKERJAAN PLAT LANTAI


a. Plat PL-1
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
b. Plat PL-2
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
c. Plat PL-3
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
d. Plat PL-4
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
e. Plat PL-5
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
f. Plat PL-6
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
g. Plat PL-8
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
h. Plat PL-9
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
i. Plat PL-10
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
j. Plat PL-11
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
k. Plat PL-12
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
l. Plat PL-15
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
m. Plat PL-18
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking
n. Plat PL-19
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
o. Plat PL-20
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
p. Plat PL-21
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
q. Plat PL-21'
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting

D. PEKERJAAN STRUKTUR LT 3
I. PEKERJAAN KOLOM
a. Kolom 3A
- Pekerjaan Beton K-300
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

b. Kolom 3B
- Pekerjaan Beton K-300
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

c. Kolom 3C
- Pekerjaan Beton K-300
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

d. Kolom 3D
- Pekerjaan Beton K-300
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

II. PEKERJAAN BALOK


a. Balok B1-2
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting

b. Balok B2-2
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting

c. Balok B3-2
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
d. Balok B4-2
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting

e. Balok BA-5
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting

III. PEKERJAAN PLAT LANTAI


a. Plat PL-1
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
b. Plat PL-2
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
c. Plat PL-3
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
d. Plat PL-4
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
e. Plat PL-5
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting

E. PEKERJAAN STRUKTUR MEZZANINE


I. PEKERJAAN KOLOM
a. Kolom 4A
- Pekerjaan Beton K-300
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

b. Kolom 4B
- Pekerjaan Beton K-300
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

c. Kolom 4C
- Pekerjaan Beton K-300
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

d. Kolom 4D
- Pekerjaan Beton K-300
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

II. PEKERJAAN BALOK (+8.30)


a. Balok B1-3 (25 x 50)
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting

b. Balok B2-3 (25 x 50)


- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting

c. Balok BA-6 (20 x 45)


- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting

d. Balok BA-7 (20 x 30)


- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting

III. PEKERJAAN BALOK (+8.40)


a. Balok B1-4 (25 x 60)
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting

b. Balok B2-4 (25 x 60)


- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting

c. Balok B3-4 (20 x 40)


- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting

d. Balok B4-4 (20 x 40)


- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting

IV. PEKERJAAN BALOK (+9.50)


a. Balok B1-4 (25 x 60)
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting

b. Balok B3-4 (25 x 40)


- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting

c. Balok B2-4 (20 x 40)


- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting

V. PEKERJAAN PLAT TALANG AIR BETON (+8.30)


a. Plat PL-27
- Pekerjaan Beton K-250 + Waterproofing Integral
- Pembesian
- Pekerjaan Bekisting
b. Plat PL-28
- Pekerjaan Beton K-250 + Waterproofing Integral
- Pembesian
- Pekerjaan Bekisting
c. Plat PL-29
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

d. Plat PL-30
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

e. Plat PL-31
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

f. Plat PL-32
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

g. Plat PL-33
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

h. Plat PL-34
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

VI. PEKERJAAN PLAT (+8.40)


a. Plat Pet
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

VII. PEKERJAAN PLAT (+9.50)


a. Plat Talang Air Beton
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

F. PEKERJAAN STRUKTUR TANGGA


I. PEKERJAAN TANGGA 1 LANTAI DASAR (2 UNIT)
a. Pekerjaan Beton Tangga
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting

b. Pekerjaan Balok Tangga BT (20 x 45)


- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

c. Pekerjaan Beton Bordes


- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

d. Pekerjaan Beton Tanjakan Tangga


- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking
II. PEKERJAAN TANGGA 1 LANTAI 1 (2 UNIT)
a. Pekerjaan Beton Tangga
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting

b. Pekerjaan Balok Tangga BT (20 x 45)


- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

c. Pekerjaan Beton Bordes


- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

d. Pekerjaan Beton Tanjakan Tangga


- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

III. PEKERJAAN TANGGA 2 (1 UNIT)


a. Pekerjaan Plat Pendestal Tangga
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

b. Pekerjaan Beton Tangga


- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

c. Pekerjaan Beton Tanjakkan Tangga


- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

IV. PEKERJAAN TANGGA 3 (1 UNIT)


a. Pekerjaan Plat Pendestal Tangga
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting

b. Pekerjaan Beton Tangga


- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

c. Pekerjaan Beton Tanjakkan Tangga


- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting

V. PEKERJAAN TANGGA 3 (1 UNIT)


a. Pekerjaan Plat Pendestal Tangga
- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

b. Pekerjaan Beton Tangga


- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
- Pekerjaan Afwerking
- Pekerjaan Cat Afwerking

c. Pekerjaan Beton Tanjakkan Tangga


- Pekerjaan Beton K-250
- Pembesian
- Pekerjaan Bekisting
G. PEKERJAAN ARSITEKTUR LANTAI DASAR
I. PEKERJAAN DINDING BATA
a. Dinding Bidang Luar
- Pas Batu Bata 1:2 (1 /2 Bata)
- pas. Plesteran 1:2
- Pas. Acian
- Pas. Cat Dinding Batu Bata
- Pekerjaan Kolom Praktis 13 X 13 cm
a Beton K175
b Pembesian
c Bekisting
d Afweerking

b. Dinding Bidang Dalam


- Pas Batu Bata 1:2 (1 /2 Bata)
- Pas Batu Bata 1:4 (1 /2 Bata)
- pas. Plesteran 1:2
- pas. Plesteran 1:4
- Pas. Acian 1:2
- Pas. Acian 1:4
- Pas. Cat Dinding Batu Bata
- Pekerjaan Kolom Praktis 13 X 13 cm
a Beton K175
b Pembesian
c Bekisting
d Afweerking

II. PEKERJAAN PINTU DAN JENDELA


a. TYPE P12 ( 1 UNIT )
1 Kuzen Aluminium
2 Pas. Pintu Kaca tebal 5mm + Rangka Aluminium
3 Engsel Pintu
4 Kunci Pintu
5 Handel Pintu Stainless
6 Pas. Jendela Kaca tebal 5mm + Rangka Aluminium
7 Engsel jendela
8 Grendel Jendela
9 Hak Angin Jendela
10 Handel Jendela

b. TYPE P13 ( 4 UNIT )


1 Kuzen Aluminium
2 Pas. Pintu Kaca tebal 5mm + Rangka Aluminium
3 Engsel Pintu
4 Kunci Pintu
5 Handel Pintu Stainless
6 Pas. Jendela Kaca tebal 5mm + Rangka Aluminium
7 Engsel jendela
8 Grendel Jendela
9 Hak Angin Jendela
10 Handel Jendela

c. TYPE P14 ( 1 UNIT )


1 Kuzen Aluminium
2 Pas. Pintu Kaca tebal 5mm + Rangka Aluminium
3 Engsel Pintu
4 Kunci Pintu
5 Handel Pintu Stainless
6 Pas. Jendela Kaca tebal 5mm + Rangka Aluminium
7 Engsel jendela
8 Grendel Jendela
9 Hak Angin Jendela
10 Handel Jendela

d. TYPE P17 ( 3 UNIT )


1 Pas Daun pintu lapis plat besi t 4mm

e. TYPE J6 ( 25 UNIT )
1 Kuzen Aluminium
2 Pas. Jalusi aluminium ventilasi

f. TYPE J10 ( 2 UNIT )


1 Kuzen Aluminium
2 Pas. Jendela Kaca tebal 5mm + Rangka Aluminium
3 Engsel jendela
4 Grendel Jendela
5 Hak Angin Jendela
6 Handel Jendela

f. TYPE J11 ( 1 UNIT )


1 Kuzen Aluminium
2 Pas. Jendela Kaca tebal 5mm + Rangka Aluminium
3 Engsel jendela
4 Grendel Jendela
5 Hak Angin Jendela
6 Handel Jendela

III. PEKERJAAN PLAFOND


a. Plafond GRC
1 Pas. Rangka Plafond Primer Hollow 40.20.2
2 Plafond GRC t + 9 mm
3 Pas. List Plafond GRC t 10 cm
4 Cat Plafond GRC dan List Plafond

b. Plafond Gypsum
1 Pas. Rangka Plafond Primer Hollow 40.20.2
2 Plafond Gypsum t + 9 mm
3 Pas. List Plafond Gypsum t 10 cm
4 Cat Plafond Gypsum dan List Plafond

c. Plafond Expose Afwerking


1 Pas afwerking plafond expose
2 Cat Plafond Expose

IV. PEKERJAAN LANTAI


a. Lantai Granite & Keramik
1 Urugan tanah tebal 10cm
2 Lantai Kerja K-100 tebal 5cm
3 Pas Granite 60 X 60
4 Pas keramik Unpolihed 30 X 30 CM

V. PEKERJAAN FINISHING TANGGA DAN RAM


a. Tangga Detail A
1 Granite 60 X 60 cm (Anak Tangga step 1 dan 2 )
2 Nosing 10 X 60 cm ( anak tangga step 1 dan 2 )
3 Granite 60 X 60 (Bordes)
4 plint keramik 15 X 60 ( anak tangga step 1 dan 2 )
5 Pas. Hand railing pipa galvanis
6 Pengecatan Tangga

b. Tangga Detail B
1 Granite 60 X 60 cm (Anak Tangga step 1 dan 2 )
2 Nosing 10 X 60 cm ( anak tangga step 1 dan 2 )
3 Granite 60 X 60 (Bordes)
4 plint keramik 15 X 60 ( anak tangga step 1 dan 2 )
5 Pas. Hand railing pipa galvanis
6 Pengecatan Tangga
c. Tangga Detail C
1 Granite 60 X 60 cm (Anak Tangga step 1 dan 2 )
2 Nosing 10 X 60 cm ( anak tangga step 1 dan 2 )
3 Granite 60 X 60 (Bordes)
4 plint keramik 15 X 60 ( anak tangga step 1 dan 2 )
5 Pas. Hand railing pipa galvanis
6 Pengecatan Tangga

d. Tangga Detail D
1 Keramik unpolished 30X30 cm
2 Pas. Tangga batu kali 1:4
3 Keramik unpolished 30X30 cm (anak tangga)
4 Nosing 10X30 cm (Anak Tangga)

e. Tangga Detail E ( 2 unit )


1 Keramik unpolished 30X30 cm
2 Keramik unpolished 30X30 cm (anak tangga)
3 Nosing 10X30 cm (Anak Tangga)

f. RAM detail F
1 Timbunan Tanah
2 Coran K 225
3 Tulangan Coran K 225 dengan wiremesh M6 2 lapis
4 Pas. Batu Bata 1:2 Pembatas RAM
5 Plesteran 1:2 Dinding RAM
6 Acian
7 Pengecatan

g. RAM detail G
1 Timbunan Tanah
2 Coran K 225
3 Tulangan Coran K 225 dengan wiremesh M6 2 lapis
4 pas keramik 30X30 motif batu alam
5 Pas batu kali 1:4 pedistrian
6 Tangga Batu kali kecil ( 2 UNIT )
a pas batu kali 1:4
b pas lantai kerja beton k100 t 5cm
c pas keramik 30 X 30 unpolished
d pas nosing keramik 30 X 30 unpolished
7 Tangga batu kali Besar
a pas batu kali 1:4
b pas lantai kerja beton k100 t 5cm
c pas keramik 30 X 30 unpolished
d pas nosing keramik 30 X 30 unpolished
8 Pot bunga Panjang
a pas bata 1:2 (1/2 bata )
b plesteran 1:2
c keramik motif batu alam 30X30
d Pas list profil Beton
e Urugan tanah timbunan + tanah humus
f pas. Bunga the-tehan
9 Pot Bunga Kotak
a pas bata 1:2 (1/2 bata )
b plesteran 1:2
c keramik motif batu alam 30X30
d Pas list profil Beton
e Urugan tanah timbunan + tanah humus
f pas. Bunga the-tehan

h. Tangga Detail H (2 unit )


1 Pasangan Tangga monyet 70X400 cm besi hollow

i. Pagar Reilling detai I lantai 2


1 Pas. Hand railling pipa galvanis 2,5 Tiang

VI. PEKERJAAN DRAINASE


a. DRAINASE LUAR A
1 Pas batu kali 1:4
2 plesteran 1:2
3 pas acian 1:2
4 pas besi siku 50X50X9
5 Pembesian

b. DRAINASE LUAR B
1 Pas batu kali 1:4
2 plesteran 1:2
3 pas acian 1:2
4 pek plat drainase
a beton k225
b pembesian
c bekisting

c. DRAINASE DALAM C
1 galian saluran
2 pas lantai kerja beton K225
3 Pas batu bata 1:2 (1/2 bata)
4 pas plesteran 1:2
5 acian 1:2
6 pas besi siku 50X50X9
7 pembesian

VII. PEKERJAAN POT BUNGA KELILING DINDING BANGUNAN


a. Lantai 1
1 pas batu bata 1:2 (1/2 bata)
2 plesteran 1:2
3 Acian
4 Cat Dinding Batu Bata
5 Urugan tanah timbunan + Tanah Humus
6 pas Tumbuhan rambat

b. Lantai 2
1 pas batu bata 1:2 (1/2 bata)
2 plesteran 1:2
3 Acian
4 Cat Dinding Batu Bata
5 Urugan tanah timbunan + Tanah Humus
6 pas Tumbuhan rambat

c. Lantai 3
1 pas batu bata 1:2 (1/2 bata)
2 plesteran 1:2
3 Acian
4 Cat Dinding Batu Bata
5 Urugan tanah timbunan + Tanah Humus
6 pas Tumbuhan rambat
VOLUME
Kayu Balok 5/7 Paku Biasa 2"- Kayu Papan 3/2Pasir Urug

227.22

17.42
1,131.52
174.23
174.23
174.23

16.16
1,049.48
161.62
161.62
161.62

0.51
37.01
5.05
5.05
5.05

0.73
51.07
7.33
7.33
7.33

1.89
128.91
18.86
18.86
18.86

8.72
552.93
87.16
87.16
87.16

6.70
864.35
32.42
32.42
32.42

17.05
2,406.49
85.68
85.68
85.68

21.21
2,737.10
102.67
102.67
102.67

2.46
335.30
14.42
14.42
14.42

1.83
436.57
14.84
12.05
12.05

1.07
257.88
10.90
7.87
7.87

13.65
3,405.32
89.70
89.70
89.70

22.36
5,082.19
146.56
146.56
146.56

0.48
246.87
4.02
3.16
3.16

21.21
2,737.10
102.67
102.67
102.67

21.21
2,737.10
102.67
102.67
102.67

21.21
2,737.10
102.67
102.67
102.67

21.21
2,737.10
102.67
102.67
102.67

21.21
2,737.10
102.67
102.67
102.67

21.21
2,737.10
102.67
102.67
102.67

21.21
2,737.10
102.67
102.67
102.67

21.21
2,737.10
102.67
102.67
102.67

21.21
2,737.10
102.67
102.67
102.67

21.21
2,737.10
102.67
102.67
102.67

69.75
12,144.56
435.91

3.07
568.17
19.18

2.37
447.55
14.82

3.73
688.01
23.32

3.99
745.96
24.91

0.74
143.97
4.60

1.29
257.45
8.07

3.09
576.48
19.30
7.05
1,278.37
44.09

9.85
1,740.19
61.56

0.73
145.00
4.58

1.49
295.92
9.29

42.58
7,670.25
266.13

8.87
2,160.45
44.36

0.97
163.83
7.36

0.30
54.25
2.38

15.31
2,903.96
119.49
215.38
215.38

8.32
1,082.44
41.32
41.32
41.32

21.17
3,020.48
109.20
109.20
109.20

26.33
3,720.97
130.85
130.85
130.85

3.06
420.22
18.38
18.38
18.38

13.65
3,405.32
89.70

22.36
5,082.19
146.56

4.75
1,182.01
31.15
34.94
9,636.16
203.92

5.50
1,309.72
36.14

2.77
596.74
18.22

0.53
115.28
3.93

0.98
217.89
7.25

1.40
304.89
10.51

0.33
46.09
2.46

2.25
487.62
16.74

3.33
734.06
24.78
18.11
4,363.38
134.76

0.95
177.23
7.00

84.43
14,701.31
527.68

3.07
568.17
19.18

2.37
447.55
14.82

4.76
833.75
29.76

1.30
246.60
8.14

3.73
688.01
23.32

0.74
143.97
4.60

1.29
257.45
8.07

4.83
863.52
30.17

4.70
852.25
29.39

4.83
861.13
30.17

28.39
5,113.50
177.42

11.96
2,278.58
87.49
157.70
157.70

3.76
659.66
23.53

0.81
151.47
5.08

0.43
81.75
2.71

1.28
232.54
8.00
6.11
735.01
38.45
38.45
38.45

15.55
1,743.74
97.92
97.92
97.92

19.36
2,327.52
121.77
121.77
121.77

3.06
367.50
19.23
19.23
19.23

9.90
2,205.27
87.25

16.68
2,926.14
130.10

3.05
424.95
22.98
26.57
4,809.17
241.27

3.75
547.53
32.53

84.43
14,701.31
527.68

3.07
568.17
19.18

2.37
447.55
14.82

4.76
833.75
29.76

1.30
246.60
8.14

2.60
308.30
15.83
15.83
15.83

4.67
527.14
25.45
25.45
25.45

3.17
332.19
13.57
13.57
13.57

1.30
154.15
7.92
7.92
7.92

14.12
3,401.02
154.45

1.66
260.99
16.57

1.30
287.90
16.85

0.36
73.18
6.07

0.99
178.59
10.09

0.95
164.35
9.71

0.30
99.57
3.65

0.68
169.16
8.15

0.99
181.05
10.09

0.68
207.67
8.15

0.30
80.63
3.65

7.53
742.32
51.06

5.38
534.14
39.06
6.56
674.46
47.54
60.72
60.72

15.16
1,557.72
130.46
153.79
153.79

3.72
381.86
31.98
37.70
37.70

16.82
1,728.64
144.78
170.67
170.67

17.77
1,826.00
152.93
180.28
180.28

8.13
835.11
69.94
82.45
82.45
8.85
727.58
57.33
74.62
74.62

12.75
1,968.23
118.30
118.30
118.30

2.03
424.15
18.20

0.67
101.80
8.25
8.25
8.25

1.47
350.04
11.18
11.18
11.18

1.32
115.04
16.29
16.29
16.29
2.68
546.53
24.01

0.67
101.80
8.25
8.25
8.25

1.53
365.11
11.30
11.30
11.30

1.67
145.72
20.63
20.63
20.63

0.36
96.59
4.19
4.19
4.19

0.54
101.83
5.28
5.28
5.28
0.36
31.76
4.59
4.59
4.59

0.24
77.02
2.64

1.19
219.35
11.11
11.11
11.11

0.81
70.58
9.81

1.07
196.62
10.08
10.08
10.08

0.49
71.64
3.24
3.24
3.24

0.68
59.28
8.32
154.084
308.168
308.168
308.168

1.24
162.98
19.21
14.18

25.782
84.6995
51.564
169.399
51.564
169.399
220.963

0.75
94.37
11.62
11.62

10.3
1.89
3.00
1.00
2.00
1.50
4.00
4.00
4.00
2.00

61.6
7.56
12.00
4.00
8.00
12.00
32.00
32.00
32.00
32.00

12.85
1.89
3.00
1.00
2.00
2.25
6.00
6.00
6.00
6.00

12.75

135.00
15.75

18.00
4.50
6.00
6.00
6.00
6.00

7.09
1.90
4.00
4.00
4.00
4.00

87.39
87.39
69.8
94.37

35.77
35.77
35.77
39.84

990.01
990.01

12.8501 15.42012
6.42505
49.212
79.289

7.74
23.8
4.49
1.869
18.1
12.69

7.74
23.8
4.49
1.869
18.1
12.69
9.88
28
5.46
2.2965
9.8
9.1

5
1.14
2.41
7.2

2.8
8.35
23.1

12.4 14.88
2.52
18.09
11.38
19.26
19.26
19.26

295.76 354.912
23.9
199.31
97.23
31.17

2.067
0.4035
8.07
12

19.87079
1.41701
28.3402
58.77

241.44
109.03
109.03
119.76
23.02 27.624
57.88

50.56
46.08
27.52
34.40
28.56 34.272
6.00

8.00

11.49

104.57364
348.5788
348.5788
2042.97488
2287.27

32.10639
107.0213
107.0213

11.16
1214.15
74.44

13.798593
5.11059
170.353
228.27302
228.27302
2296.35844
1209.86

50.58
67.44
67.44
67.44
13.9095 16.6914
84.3

55.80
74.40
74.40
74.40
15.35 18.414
93.00

148.55
190.99
190.99
190.99
19.10 22.918896
212.21
Sirtu Batu Belah Semen Portland Pasir Pasang Pasir Beton Kerikil

2701.26192 2.78768

2505.787488 2.585952

78.357216 0.080864

113.706336 0.117344

292.40544 0.30176
1351.375152 1.394608

502.63968 0.51872

1328.38272 1.37088

1591.71816 1.64264

223.56768 0.23072

186.776688 0.192752
121.985472 0.125888

1390.7088 1.4352

2272.204224 2.344896

49.023648 0.050592

1591.71816 1.64264

1591.71816 1.64264
1591.71816 1.64264

1591.71816 1.64264

1591.71816 1.64264

1591.71816 1.64264

1591.71816 1.64264

1591.71816 1.64264
1591.71816 1.64264

1591.71816 1.64264
3339.236016 3.446064
640.62528 0.66112

1693.0368 1.7472

2028.667392 2.093568

284.932512 0.294048
2444.918784 2.523136
596.190816 0.615264

1518.15168 1.56672

1887.937584 1.948336

298.095408 0.307632
245.490336 0.253344
394.530288 0.407152

210.420288 0.217152

122.745168 0.126672
941.464896 0.971584

2384.391168 2.460672

584.5008 0.6032

2646.005664 2.730656

2795.030112 2.884448

1278.289296 1.319184
1156.939488 1.193952

1834.138704 1.892816

127.908 0.132

173.303712 0.178848

252.56016 0.26064
127.908 0.132

175.257216 0.180864

319.909536 0.330144

64.88424 0.06696

81.830112 0.084448
71.16336 0.07344

172.24944 0.17776

156.233808 0.161232

50.23296 0.05184
2919.8918 5.855192
5839.7836 6.16336
5839.7836

404.24 942.4 1275.96

219.84672 0.22688

488.5689 0.979716
974.04425 3.6420785
527.190336 1.03128
1057.04976 4.065576
167.583
550.54675

244.5 570 771.75

180.15648 0.18592
15349.11504 15.84016

1477.7615 5737.56965 6598.52635


472.4352 2.21454
792.89 3.568005

74.304 0.3483

43.104 0.20205
17.9424 0.084105

74.304 0.3483

43.104 0.20205
17.9424 0.084105
94.848 0.4446

52.416 0.2457
22.0464 0.1033425

28 0.126
83.5 0.37575

934.92 1758.96 2638.44

215.651 0.43244
196.91424 0.3852
62.595

8866.9 16682.2 25023.3

972.3 4.37535

92.805 360.3255 414.3945


80.7 0.36315

325.9123 1265.38993 1455.26927


283.402 1.275309
4575.288 9.17472
1114.72272 2.1806
1211.44444444 4.90635

958.112 1.92128
471.12192 0.9216
275.2 1.2384

3563.8696512 6.971576
1132.8811

1094.1857712 2.140426
347.819225

4140.36 7789.68 11684.52

1896.02889 3567.19182 5350.78773


2333.86335648 4.5654604
741.887315

689.50656 1.3488
219.18

760.6656 1.488
241.8

1952.6899392 3.819816
620.7201
Air Ready Mix K-250 Ready Mix K-300 Waterstop 270 MM

72.7104

17.77146

16.48524

0.5151

0.74766

1.92372

8.89032
6.83298

17.39304

21.63726

2.51124

1.86966

1.08732
13.923

22.80312

0.49164

21.63726

21.63726

21.63726
21.63726

21.63726

21.63726

21.63726

21.63726

21.63726
21.63726

71.1399

3.12936

2.41842

3.80562

4.0647

0.75072

1.31682

3.14874
7.19508

10.047

0.74664

1.5147

43.43262

9.04842

0.9894

0.30498

15.61416

8.48232
21.59136

26.86068

3.11712

13.923

22.80312

4.84704
35.63574

5.60898

2.82744

0.54366

1.00266

1.4229

0.33762

2.295

3.3966
18.47424

0.96696

86.11656

3.12936

2.41842

4.85622

1.32804

3.80562

0.75072

1.31682
4.92354

4.79706

4.92354

28.95474

12.1992

3.83928

0.82824

0.44268

1.3056
6.23424

15.86304

19.74414

3.11712

10.098

17.0136

3.11202
27.1014

3.82806

86.11656

3.12936

2.41842

4.85622

1.32804

2.65506

4.76238
3.23136

1.32702

14.39832

1.68912

1.32192

0.37128

1.00572
0.96798

0.30906

0.69156

1.00572

0.69156

0.30906

7.68264 2.41024

5.48964 1.72224
6.69528

15.4632

3.79032

17.15946

18.12642

8.28954
9.02802

13.00194

2.07468

0.68748

1.49736

1.3464
2.73564

0.68748

1.56264

1.70544

0.37128

0.54774
0.37128

0.2448

1.2138

0.8262

1.08834

0.49572

0.6936
266.6

161.25
1285.01
541.8

5138.5

80.7

283.402
2399.4

1098.78
Additive Waterproofing Waterstop PVCBesi Beton Kawat BetonKayu Kelas III

681.66

11881.002 169.7286
5.2269

11019.54 157.422
4.84866

388.647 5.5521
0.15162

536.235 7.6605
0.22002

1353.555 19.3365
0.5658

5805.723 82.9389
2.61489

9075.6435 129.65205
1.2968

25268.124 360.9732
3.4272

28739.5605 410.56515
4.1066

3520.692 50.2956
0.5768

4584.027 65.4861
0.59364
2707.7505 38.68215
0.43608

35755.902 510.7986
3.588

53363.0055 762.32865
5.86224

2592.1035 37.03005
0.1608

28739.5605 410.56515
4.1066

28739.5605 410.56515
4.1066

28739.5605 410.56515
4.1066

28739.5605 410.56515
4.1066

28739.5605 410.56515
4.1066

28739.5605 410.56515
4.1066

28739.5605 410.56515
4.1066

28739.5605 410.56515
4.1066

28739.5605 410.56515
4.1066
28739.5605 410.56515
4.1066

127517.838 1821.6834
17.43628

5965.743 85.2249
0.767

4699.2645 67.13235
0.59296

7224.147 103.2021
0.9328

7832.5275 111.89325
0.99632

1511.6325 21.59475
0.18416

2703.225 38.6175
0.32292

6052.998 86.4714
0.77188
13422.927 191.7561
1.76364

18272.037 261.0291
2.46248

1522.5 21.75
0.18316

3107.16 44.388
0.37144

80537.583 1150.5369
10.64532

22684.746 324.0678
1.7742

1720.194 24.5742
0.2944

569.646 8.1378
0.09532

30491.5905 435.59415
4.77964
11365.5675 162.36525
1.6528

31715.061 453.0723
4.368

39070.227 558.1461
5.23392

4412.268 63.0324
0.73512

35755.902 510.7986
3.588

53363.0055 762.32865
5.86224

12411.147 177.3021
1.24608
101179.67 1445.42385
8.15672

13752.102 196.4586
1.44568

6265.7385 89.51055
0.72864

1210.3875 17.29125
0.15736

2287.8345 32.68335
0.29016

3201.3555 45.73365
0.42036

483.9345 6.91335
0.09856

5119.968 73.1424
0.6696

7707.609 110.1087
0.991
45815.532 654.5076
5.39028

1860.9255 26.58465
0.27984

154363.703 2205.19575
21.10708

5965.743 85.2249
0.767

4699.2645 67.13235
0.59296

8754.417 125.0631
1.1904

2589.3 36.99
0.32548

7224.147 103.2021
0.9328

1511.6325 21.59475
0.18416

2703.225 38.6175
0.32292

9066.9495 129.52785
1.20676

8948.6145 127.83735
1.17576

9041.8335 129.16905
1.20676

53691.7185 767.02455
7.09688

23925.132 341.7876
3.49956

6926.3775 98.94825
0.94116

1590.477 22.7211
0.203

858.3435 12.26205
0.10848

2441.7015 34.88145
0.32
7717.563 110.2509
1.53816

18309.249 261.5607
3.9168

24438.9495 349.12785
4.87084

3858.7815 55.12545
0.76908

23155.3245 330.79035
3.49008

30724.4175 438.92025
5.20416

4461.954 63.7422
0.91936
50496.285 721.3755
9.6506

5749.065 82.1295
1.30104

154363.703 2205.19575
21.10708

5965.743 85.2249
0.767

4699.2645 67.13235
0.59296

8754.417 125.0631
1.1904

2589.3 36.99
0.32548

3237.1395 46.24485
0.63336
5535.012 79.0716
1.01788

3487.9845 49.82835
0.54288

1618.5645 23.12235
0.31668

35710.71 510.153
6.17816

2740.416 39.1488
0.6626

3022.95 43.185
0.67392

768.3585 10.97655
0.2428
1875.237 26.7891
0.4034

1725.675 24.6525
0.38824

1045.4955 14.93565
0.1458

1776.1905 25.37415
0.3258

1901.025 27.1575
0.4034

2180.535 31.1505
0.3258

846.636 12.0948
0.1458

22.596
7794.3075 111.34725
2.04228

16.146
5608.4175 80.12025
1.56248
7081.83 101.169
1.90148

16356.081 233.6583
5.21856

4009.509 57.2787
1.27924

18150.7095 259.29585
5.79112

19172.9685 273.89955
6.11728

8768.676 125.2668
2.79772
7639.569 109.1367
2.29312

20666.415 295.2345
4.73204

4453.533 63.6219
0.546

1068.858 15.2694
0.2475

3675.462 52.5066
0.33534

1207.92 17.256
0.4887
5738.607 81.9801
0.7203

1068.858 15.2694
0.2475

3833.676 54.7668
0.33912

1530.018 21.8574
0.61902

1014.174 14.4882
0.12555

1069.257 15.2751
0.15834
333.4695 4.76385
0.1377

808.689 11.5527
0.0792

2303.1645 32.90235
0.3333

741.048 10.5864
0.2943

2064.489 29.4927
0.30231

752.241 10.7463
0.0972

622.482 8.8926
0.24948
1711.29 24.447
0.7684

990.885 14.1555
0.4648
21451.2362 306.446232
24016.335 343.0905

12748.575 182.1225
2.9776
24111.7636 344.453766
12703.53 181.479
Paku 5-10 cmMinyak BekistingBalok Kayu Kelas II Plywood 9mm Dolken Kayu 8-10

69.692 34.846 3.4846 60.9805 522.69

64.6488 32.3244 3.23244 56.5677 484.866

2.0216 1.0108 0.10108 1.7689 15.162

2.9336 1.4668 0.14668 2.5669 22.002

7.544 3.772 0.3772 6.601 56.58


34.8652 17.4326 1.74326 30.50705 261.489

12.968 6.484 0.4863 11.347 64.84

34.272 17.136 1.2852 29.988 171.36

41.066 20.533 1.539975 35.93275 205.33

5.768 2.884 0.2163 5.047 28.84

5.9364 2.9682 0.267138 5.19435 29.682


4.3608 2.1804 0.196236 3.8157 21.804

35.88 17.94 1.6146 31.395 179.4

58.6224 29.3112 2.638008 51.2946 293.112

1.608 0.804 0.07236 1.407 8.04

41.066 20.533 1.84797 35.93275 205.33

41.066 20.533 1.84797 35.93275 205.33


41.066 20.533 1.84797 35.93275 205.33

41.066 20.533 1.84797 35.93275 205.33

41.066 20.533 1.84797 35.93275 205.33

41.066 20.533 1.84797 35.93275 205.33

41.066 20.533 1.84797 35.93275 205.33

41.066 20.533 1.84797 35.93275 205.33

41.066 20.533 1.84797 35.93275 205.33


41.066 20.533 1.84797 35.93275 205.33

174.3628 87.1814 6.538605 152.56745 2615.442

7.67 3.835 0.287625 6.71125 115.05

5.9296 2.9648 0.22236 5.1884 88.944

9.328 4.664 0.3498 8.162 139.92

9.9632 4.9816 0.37362 8.7178 149.448

1.8416 0.9208 0.06906 1.6114 27.624

3.2292 1.6146 0.121095 2.82555 48.438

7.7188 3.8594 0.289455 6.75395 115.782


17.6364 8.8182 0.661365 15.43185 264.546

24.6248 12.3124 0.92343 21.5467 369.372

1.8316 0.9158 0.068685 1.60265 27.474

3.7144 1.8572 0.13929 3.2501 55.716

106.4532 53.2266 3.991995 93.14655 1596.798

17.742 8.871 0.665325 15.52425 266.13

2.944 1.472 0.1104 2.576 44.16

0.9532 0.4766 0.035745 0.83405 14.298

47.7964 23.8982 1.792365 41.82185 716.946


16.528 8.264 0.6198 14.462 82.64

43.68 21.84 1.638 38.22 218.4

52.3392 26.1696 1.96272 45.7968 261.696

7.3512 3.6756 0.27567 6.4323 36.756

35.88 17.94 1.6146 31.395 179.4

58.6224 29.3112 2.638008 51.2946 293.112

12.4608 6.2304 0.560736 10.9032 62.304


81.5672 40.7836 3.670524 71.3713 407.836

14.4568 7.2284 0.650556 12.6497 72.284

7.2864 3.6432 0.327888 6.3756 36.432

1.5736 0.7868 0.070812 1.3769 7.868

2.9016 1.4508 0.130572 2.5389 14.508

4.2036 2.1018 0.189162 3.67815 21.018

0.9856 0.4928 0.044352 0.8624 4.928

6.696 3.348 0.30132 5.859 33.48

9.91 4.955 0.44595 8.67125 49.55


53.9028 26.9514 2.425626 47.16495 269.514

2.7984 1.3992 0.125928 2.4486 13.992

211.0708 105.5354 7.915155 184.68695 3166.062

7.67 3.835 0.287625 6.71125 115.05

5.9296 2.9648 0.22236 5.1884 88.944

11.904 5.952 0.4464 10.416 178.56

3.2548 1.6274 0.122055 2.84795 48.822

9.328 4.664 0.3498 8.162 139.92

1.8416 0.9208 0.06906 1.6114 27.624


3.2292 1.6146 0.121095 2.82555 48.438

12.0676 6.0338 0.452535 10.55915 181.014

11.7576 5.8788 0.44091 10.2879 176.364

12.0676 6.0338 0.452535 10.55915 181.014

70.9688 35.4844 2.66133 62.0977 1064.532

34.9956 17.4978 1.312335 30.62115 524.934

9.4116 4.7058 0.352935 8.23515 141.174

2.03 1.015 0.076125 1.77625 30.45

1.0848 0.5424 0.04068 0.9492 16.272

3.2 1.6 0.12 2.8 48


15.3816 7.6908 0.57681 13.4589 76.908

39.168 19.584 1.4688 34.272 195.84

48.7084 24.3542 1.826565 42.61985 243.542

7.6908 3.8454 0.288405 6.72945 38.454

34.9008 17.4504 1.570536 30.5382 174.504

52.0416 26.0208 2.341872 45.5364 260.208

9.1936 4.5968 0.413712 8.0444 45.968


96.506 48.253 4.34277 84.44275 482.53

13.0104 6.5052 0.585468 11.3841 65.052

211.0708 105.5354 7.915155 184.68695 3166.062

7.67 3.835 0.287625 6.71125 115.05

5.9296 2.9648 0.22236 5.1884 88.944

11.904 5.952 0.4464 10.416 178.56

3.2548 1.6274 0.122055 2.84795 48.822

6.3336 3.1668 0.23751 5.5419 31.668


10.1788 5.0894 0.381705 8.90645 50.894

5.4288 2.7144 0.20358 4.7502 27.144

3.1668 1.5834 0.118755 2.77095 15.834

61.7816 30.8908 2.780172 54.0589 308.908

6.626 3.313 0.29817 5.79775 33.13

6.7392 3.3696 0.303264 5.8968 33.696

2.428 1.214 0.10926 2.1245 12.14


4.034 2.017 0.18153 3.52975 20.17

3.8824 1.9412 0.174708 3.3971 19.412

1.458 0.729 0.06561 1.27575 7.29

3.258 1.629 0.14661 2.85075 16.29

4.034 2.017 0.18153 3.52975 20.17

3.258 1.629 0.14661 2.85075 16.29

1.458 0.729 0.06561 1.27575 7.29

20.4228 10.2114 0.765855 17.86995 306.342

15.6248 7.8124 0.58593 13.6717 234.372


19.0148 9.5074 0.713055 16.63795 285.222

52.1856 26.0928 1.95696 45.6624 782.784

12.7924 6.3962 0.479715 11.19335 191.886

57.9112 28.9556 2.17167 50.6723 868.668

61.1728 30.5864 2.29398 53.5262 917.592

27.9772 13.9886 1.049145 24.48005 419.658


22.9312 11.4656 0.85992 20.0648 343.968

47.3204 23.6602 1.774515 41.40535 709.806

7.28 2.73 0.273 6.37 36.4

3.3 1.2375 0.12375 2.8875 16.5

4.4712 1.6767 0.16767 3.9123 22.356

6.516 2.4435 0.24435 5.7015 32.58


9.604 3.6015 0.36015 8.4035 48.02

3.3 1.2375 0.12375 2.8875 16.5

4.5216 1.6956 0.16956 3.9564 22.608

8.2536 3.0951 0.30951 7.2219 41.268

1.674 0.62775 0.062775 1.46475 8.37

2.1112 0.7917 0.07917 1.8473 10.556


1.836 0.6885 0.06885 1.6065 9.18

1.056 0.396 0.0396 0.924 5.28

4.444 1.6665 0.16665 3.8885 22.22

3.924 1.4715 0.14715 3.4335 19.62

4.0308 1.51155 0.151155 3.52695 20.154

1.296 0.486 0.0486 1.134 6.48

3.3264 1.2474 0.12474 2.9106 16.632


7.684 3.842 0.28815 6.7235 38.42

4.648 2.324 0.1743 4.067 23.24


29.776 14.888 1.1166 26.054 446.64
Spacer Besi Siku L.30.30.Besi Plat Baja Kawat LasProfil Alumunium

696.92

646.488

20.216

29.336

75.44
348.652
11.33
8.316

6.6

67.76
33.264

52.8

14.135
8.316

9.9

148.5

19.8
19.8

7.799
8.36
Skrup Fixer Sealant Alumunium StripKaca Tebal 5 mm Kaca Tebal 12 mm
20.6 0.618
0.5103 1.89

0.405 1.5

123.2 3.696
2.0412 7.56

3.24 12

25.7 0.771
0.81 1.89

0.6075 2.25

270 8.1

36 1.08
1.215 4.5

14.18 0.4254
0.513 1.9
Rangka Metal Hollow 40.40.2 Assesoris (Perkuatan) BataMerah
10785.88

1804.74
5928.965
349.56 87.39

143.08 35.77
796.6
16900.8

3539.2
Granit Uk 60.60 Semen Warna Granit Uk. 30.30 Keramik 30x30 Keramik Unpolish
152.5572 73.818
118.9335 941.16043

23.994 11.61

13.919 6.735
5.7939 2.8035

23.994 11.61

13.919 6.735
5.7939 2.8035
30.628 14.82

16.926 8.19
7.11915 3.44475

7.5 59.35

3.615 28.6067

4.2 33.236
12.525 99.1145

145.845 1080.3333333

12.105 89.666666667

42.5103 314.89111111
163.545 1211.4444444

41.28 305.77777778
Keramik 20x20Keramik 20 x 40Paving Block Tipe 1Paving Block Tipe Hexagon
Gypsum Board Paku Triplek Profil GypsumKunci Tanam Pegangan Pintu
1
2
4
8

1
2
31.80996 9.6129
0.698 73.29

13.02028 3.9347
0.3577 37.5585
Pegangan Jendela Kunci Tanam BiasaEngsel Pintu Engsel Jendela Engsel Angin
3

4
4

2
12

32
32

32

6
6

6
6

4
4
4
Kait Angin Door Closer Door Stop Plamir Cat Dasar Cat Penutup Kloset Duduk

26.1345 8.7115 45.2998

24.2433 8.0811 42.02172

0.7581 0.2527 1.31404

1.1001 0.3667 1.90684

2.829 0.943 4.9036


13.07445 4.35815 22.66238

4.863 1.621 8.4292

12.852 4.284 22.2768

15.39975 5.13325 26.6929

2.163 0.721 3.7492

1.80705 0.60235 3.13222


1.1802 0.3934 2.04568

13.455 4.485 23.322

21.9834 7.3278 38.10456

0.4743 0.1581 0.82212

15.39975 5.13325 26.6929

15.39975 5.13325 26.6929


19.8 5.13325 26.6929

15.39975 5.13325 26.6929

15.39975 5.13325 26.6929

15.39975 5.13325 26.6929

15.39975 5.13325 26.6929

15.39975 5.13325 26.6929


15.39975 5.13325 26.6929

15.39975 5.13325 26.6929


32.30685 10.76895 55.99854
6.198 2.066 10.7432

16.38 5.46 28.392

19.6272 6.5424 34.02048

2.7567 0.9189 4.77828


23.6544 7.8848 41.00096
5.7681 1.9227 9.99804

14.688 4.896 25.4592

18.26565 6.08855 31.66046

2.88405 0.96135 4.99902


2.3751 0.7917 4.11684
3.81705 1.27235 6.61622

2.0358 0.6786 3.52872

1.18755 0.39585 2.05842


9.1086 3.0362 15.78824

23.0688 7.6896 39.98592

5.655 1.885 9.802

25.5999 8.5333 44.37316

27.0417 9.0139 46.87228

12.36735 4.12245 21.43674


11.1933 3.7311 19.40172

17.74515 5.91505 30.75826

1.2375 0.4125 2.145

1.6767 0.5589 2.90628

2.4435 0.8145 4.2354


1.2375 0.4125 2.145

1.6956 0.5652 2.93904

3.0951 1.0317 5.36484

0.62775 0.20925 1.0881

0.7917 0.2639 1.37228


0.6885 0.2295 1.1934

1.6665 0.5555 2.8886

1.51155 0.50385 2.62002

0.486 0.162 0.8424


46.2252 15.4084 80.12368

33.14445 11.04815 57.45038

4
32

4
14.1555 4.7185 24.5362

5.976 1.992 10.3584

148.5015 49.5005 257.4026

1.9035 0.6345 3.2994

1.9035 0.6345 3.2994


1.365 0.455 2.366

2.889 0.963 5.0076


10.116 3.372 17.5344

11.16 3.72 19.344

28.64862 9.54954 49.657608


Perlengkapan Klose DudukKloset Jongkok Westafel Perlengkapan Westafel
Bak Cuci PiringWaterdrain Floordrain Kran Air Pipa PVC 2"Pipa AW 4" Pipa GIP 50 MM
Valve 50 Valve 150 Chanel 75 TBL 0.75 MMReng Baut/ScrewTalang L-Plate
Dynabolt Genteng Metal BerpasirGenteng MetalAlumunium
REKAPITULASI
RENCANA ANGGARAN BIAYA

KEGIATAN : PENINGKATAN SARANA DA


PEKERJAAN : PENYUSUNAN DED GEDUNG
LOKASI : KOTA PARIAMAN-SUMATER
TAHUN ANGGARAN : 2018

NO URAIAN PEKERJAAN

I PEKERJAAN PONDASI DAN STRUKTUR BERTULANG


1 PEKERJAAN PENDAHULUAN
2 PEKERJAAN PONDASI
1 PEKERJAAN TANAH
2 PEKERJAAN PONDASI KSLL
3 PEKERJAAN BETON BERTULANG
1 PEKERJAAN PLAT PENAHAN TANAH
2 KOLOM P + -2,90 - 0,00
3 PEKERJAAN BALOK P - 036
4 PEKERJAAN BALOK P + 0,00
5 PEKERJAAN PLAT P + 0,00
6 KOLOM P + 0,00 - 3,60
7 PEKERJAAN BALOK P + 3,60
8 PEKERJAAN PLAT P + 3,60
9 KOLOM P + 3,60 - 7,20
10 PEKERJAAN BALOK P + 7,20
11 PEKERJAAN PLAT P + 7,20
12 KOLOM P +( 7,20 - 9,50) & (7,20 - 8,30)
13 PEKERJAAN BALOK P + 8,30
14 PEKERJAAN PLAT TALANG AIR BETON + 8,30
15 PEKERJAAN BALOK P + 8,40
16 PEKERJAAN PLAT P + 8,40
17 PEKERJAAN BALOK P + 9,50
18 PEKERJAAN PLAT P + 9,50
4 PEKERJAAN TANGGA
1 PEKERJAAN TANGGA 1 LANTAI DASAR ( 2 Unit)
2 PEKERJAAN TANGGA 1 LANTAI 1 ( 2 Unit)
3 PEKERJAAN TANGGA 2 ( 1 Unit)
4 PEKERJAAN TANGGA 3 ( 1 Unit)
5 PEKERJAAN TANGGA 3 ( 1 Unit)

II PEKERJAAN AKSITEKTUR LANTAI DASAR


1. PEK. DINDING
2. PEK. PINTU DAN JENDELA
3. PEKERJAAN PLAFOND
4. PEK. LANTAI
5. PEK. FINISHING TANGGA DAN RAM
6. PEK. DRAINASE
7. PEK. KELILING POT BUNGA KELL. BANGUNAN
NO URAIAN PEKERJAAN

III PEKERJAAN AKSITEKTUR LANTAI I


1 PEK. DINDING
2 PEK. PINTU DAN JENDELA
3 PEKERJAAN PLAFOND
4 PEK. LANTAI
5 PEK. FINISHING TANGGA
6 PEK. TOILET DAN ACCESORIS
7 PEK. CUTTING PLAT DAN UKIRAN 3

IV PEKERJAAN AKSITEKTUR LANTAI II


1 PEK. DINDING
2 PEK. PINTU DAN JENDELA
3 PEKERJAAN PLAFOND
4 PEK. LANTAI
5 PEK. FINISHING TANGGA
6 PEK. TOILET DAN ACCESORIS
7 PEK. CUTTING PLAT DAN UKIRAN 3

V PEKERJAAN LANTAI DAG +8.30, LANTAI DAG +9.50 DAN ATAP


1. PEK. DINDING
2. PEK. PINTU DAN JENDELA
3. PEKERJAAN PLAFOND
4. PEK. ATAP

VI PEKERJAAN MEKANIKAL ELEKTRIKAL


1. PEKERJAAN ELEKTRIKAL
A Pekerjaan Instalasi Listrik Gedung
B Pek. CCTV
C Pek. Telephone & PABX
D Pek. Intalasi Network
E Pek. MATV
F Pek. FIRE ALARM
G Pek. Sound System
H Pek Sambungan Listrik + Kabel Feeder
I Pek. Panel
J Pek. Penangkal Petir
K Pek. Kabel Tray
2. PEKERJAAN MEKANIKAL
A Pek. Instalasi Kebakaran
B Pek. Instalasi Air Bersih
C Pek. Instalasi Air Bekas, Kotor dan Hujan
D Pek. Rooftank FRP
E Water Treatment Plant (WTP)
F Pek. Air Conditioner ( AC )
G Pek. Genset

VII PEKERJAAN LANDSCAPE

JUMLAH FISIK
PPN 10%
JUMLAH FISIK + PPN 10 %
DIBULATKAN
TERBILANG : 0

Diperiksa
DINAS PEKERJAAN UMUM PT. IND
KOTA PADANG
Ir. FATRIARMAN NOER, M. Eng.Sc
Nip : 19680721 199703 1 004

Disetujui,
PEJABAT PELAKSANA TEKNIS KEGIATAN KEPALA BA
(PPTK) TERPADU

M. FAJRI ZALMI, SSTP, MSi


Nip : 19820724 200112 1 002
REKAPITULASI
A ANGGARAN BIAYA

PENINGKATAN SARANA DAN PRASARANA APARATUR


PENYUSUNAN DED GEDUNG KANTOR BPMPTSP KOTA PADANG
KOTA PARIAMAN-SUMATERA BARAT

JUMLAH HARGA BOBOT

Rp 1,417,126,877.40

Rp 262,054,804.68
Rp 4,200,972,778.02

Rp 384,110,402.51
Rp 270,833,522.98
Rp 27,803,377.34
Rp 947,818,934.99
Rp 1,337,736,636.97
Rp 366,983,016.86
Rp 956,925,887.06
Rp 1,226,712,638.04
Rp 289,123,459.94
Rp 509,941,628.14
Rp 533,426,690.20
Rp 69,894,452.42
Rp 182,443,543.06
Rp 650,602,904.08
Rp 29,165,172.13
Rp 60,748,834.93
Rp 20,820,172.59
Rp 120,047,463.05

Rp 51,342,354.20
Rp 60,606,830.91
Rp 13,139,366.38
Rp 20,709,311.85
Rp 19,464,179.56

Rp 157,905,557.31
Rp 80,579,748.38
Rp 129,486,280.41
Rp 56,622,750.49
Rp 319,789,162.73
Rp 353,523,717.63
Rp 99,099,795.68
JUMLAH HARGA BOBOT

Rp 681,461,196.31
Rp 281,325,950.48
Rp 236,501,382.23
Rp 472,107,293.72
Rp 74,142,321.47
Rp 267,651,186.93
Rp 393,420,000.00

Rp 691,317,851.02
Rp 253,442,561.14
Rp 235,135,072.72
Rp 528,754,971.90
Rp 7,276,000.00
Rp 229,039,298.09
Rp 514,612,500.00

Rp 13,396,724.69
Rp 41,442,020.26
Rp 56,365,811.93
Rp 957,275,013.61

Rp 326,024,420.00
Rp 200,657,600.00
Rp 92,576,400.00
Rp 74,780,500.00
Rp 107,268,200.00
Rp 144,690,500.00
Rp 80,514,000.00
Rp 307,794,344.50
Rp 319,858,500.00
Rp 44,887,300.00
Rp 158,399,400.00

Rp 711,947,050.00
Rp 170,888,500.00
Rp 194,525,700.00
Rp 78,127,000.00
Rp 254,000,000.00
Rp 1,139,064,400.00
Rp 439,500,000.00

Rp 870,560,359.28

Rp 26,878,293,583.22
Rp 2,687,829,358.32
Rp 29,566,122,941.55
Rp 29,566,122,000.00

Padang, ........, ………………... 2018


Penanggung Jawab
PT. INDOSARANA pratama nusantara
FIELDA ROZA. ST, MT
Direktur Teknik

Mengetahui,
KEPALA BADAN PENANAMAN MODAL DAN PELAYANAN
TERPADU SATU PINTU SELAKU PENGGUNA ANGGARAN

Drs. DIDI ARYADI, M.Si


Nip : 19681005 198611 1 001
REKAPITULASI
RENCANA ANGGARAN BI

KEGIATAN : PENINGKATAN SARANA


PEKERJAAN : PENYUSUNAN DED GEDU
LOKASI : KOTA PARIAMAN-SUMAT
TAHUN ANGGARAN : 2018

NO URAIAN PEKERJAAN

I PEKERJAAN PONDASI DAN STRUKTUR BERTULANG


1 PEKERJAAN PENDAHULUAN
2 PEKERJAAN PONDASI
1 PEKERJAAN TANAH
2 PEKERJAAN PONDASI KSLL
3 PEKERJAAN BETON BERTULANG
1 PEKERJAAN PLAT PENAHAN TANAH
2 KOLOM P + -2,90 - 0,00
3 PEKERJAAN BALOK P - 036
4 PEKERJAAN BALOK P + 0,00
5 PEKERJAAN PLAT P + 0,00
6 KOLOM P + 0,00 - 3,60
7 PEKERJAAN BALOK P + 3,60
8 PEKERJAAN PLAT P + 3,60
9 KOLOM P + 3,60 - 7,20
10 PEKERJAAN BALOK P + 7,20
11 PEKERJAAN PLAT P + 7,20
12 KOLOM P +( 7,20 - 9,50) & (7,20 - 8,30)
13 PEKERJAAN BALOK P + 8,30
14 PEKERJAAN PLAT TALANG AIR BETON + 8,30
15 PEKERJAAN BALOK P + 8,40
16 PEKERJAAN PLAT P + 8,40
17 PEKERJAAN BALOK P + 9,50
18 PEKERJAAN PLAT P + 9,50
4 PEKERJAAN TANGGA
1 PEKERJAAN TANGGA 1 LANTAI DASAR ( 2 Unit)
2 PEKERJAAN TANGGA 1 LANTAI 1 ( 2 Unit)
3 PEKERJAAN TANGGA 2 ( 1 Unit)
4 PEKERJAAN TANGGA 3 ( 1 Unit)
5 PEKERJAAN TANGGA 3 ( 1 Unit)

II PEKERJAAN AKSITEKTUR LANTAI DASAR


1. PEK. DINDING
2. PEK. PINTU DAN JENDELA
3. PEKERJAAN PLAFOND
4. PEK. LANTAI
5. PEK. FINISHING TANGGA DAN RAM
6. PEK. DRAINASE
7. PEK. KELILING POT BUNGA KELL. BANGUNAN

III PEKERJAAN AKSITEKTUR LANTAI I


1 PEK. DINDING
2 PEK. PINTU DAN JENDELA
3 PEKERJAAN PLAFOND
4 PEK. LANTAI
5 PEK. FINISHING TANGGA
6 PEK. TOILET DAN ACCESORIS
7 PEK. CUTTING PLAT DAN UKIRAN 3

IV PEKERJAAN AKSITEKTUR LANTAI II


1 PEK. DINDING
2 PEK. PINTU DAN JENDELA
3 PEKERJAAN PLAFOND
4 PEK. LANTAI
5 PEK. FINISHING TANGGA
6 PEK. TOILET DAN ACCESORIS
7 PEK. CUTTING PLAT DAN UKIRAN 3

V PEKERJAAN LANTAI DAG +8.30, LANTAI DAG +9.50 DAN ATAP


1. PEK. DINDING
2. PEK. PINTU DAN JENDELA
3. PEKERJAAN PLAFOND
4. PEK. ATAP

VI PEKERJAAN MEKANIKAL ELEKTRIKAL


1. PEKERJAAN ELEKTRIKAL
A Pekerjaan Instalasi Listrik Gedung
B Pek. CCTV
C Pek. Telephone & PABX
D Pek. Intalasi Network
E Pek. MATV
F Pek. FIRE ALARM
G Pek. Sound System
H Pek Sambungan Listrik + Kabel Feeder
I Pek. Panel
J Pek. Penangkal Petir
K Pek. Kabel Tray
2. PEKERJAAN MEKANIKAL
A Pek. Instalasi Kebakaran
B Pek. Instalasi Air Bersih
C Pek. Instalasi Air Bekas, Kotor dan Hujan
D Pek. Rooftank FRP
E Water Treatment Plant (WTP)
F Pek. Air Conditioner ( AC )
G Pek. Genset

VII PEKERJAAN LANDSCAPE

JUMLAH FISIK + PPN 10 %

TERBILANG : 0
REKAPITULASI
RENCANA ANGGARAN BIAYA

PENINGKATAN SARANA DAN PRASARANA APARATUR


PENYUSUNAN DED GEDUNG KANTOR BPMPTSP KOTA PADANG
KOTA PARIAMAN-SUMATERA BARAT

AAN JUMLAH HARGA BOBOT

ERTULANG
Rp 1,417,126,877.40 5.27

Rp 262,054,804.68 0.97
Rp 4,200,972,778.02 15.63

N TANAH Rp 384,110,402.51 1.43


Rp 270,833,522.98 1.01
Rp 27,803,377.34 0.10
Rp 947,818,934.99 3.53
Rp 1,337,736,636.97 4.98
Rp 366,983,016.86 1.37
Rp 956,925,887.06 3.56
Rp 1,226,712,638.04 4.56
Rp 289,123,459.94 1.08
Rp 509,941,628.14 1.90
Rp 533,426,690.20 1.98
7,20 - 8,30) Rp 69,894,452.42 0.26
Rp 182,443,543.06 0.68
AIR BETON + 8,30 Rp 650,602,904.08 2.42
Rp 29,165,172.13 0.11
Rp 60,748,834.93 0.23
Rp 20,820,172.59 0.08
Rp 120,047,463.05 0.45

NTAI DASAR ( 2 Unit) Rp 51,342,354.20 0.19


NTAI 1 ( 2 Unit) Rp 60,606,830.91 0.23
Rp 13,139,366.38 0.05
Rp 20,709,311.85 0.08
Rp 19,464,179.56 0.07

Rp 157,905,557.31 0.59
Rp 80,579,748.38 0.30
Rp 129,486,280.41 0.48
Rp 56,622,750.49 0.21
DAN RAM Rp 319,789,162.73 1.19
Rp 353,523,717.63 1.32
A KELL. BANGUNAN Rp 99,099,795.68 0.37

Rp 681,461,196.31 2.54
Rp 281,325,950.48 1.05
Rp 236,501,382.23 0.88
Rp 472,107,293.72 1.76
Rp 74,142,321.47 0.28
Rp 267,651,186.93 1.00
UKIRAN 3 Rp 393,420,000.00 1.46

Rp 691,317,851.02 2.57
Rp 253,442,561.14 0.94
Rp 235,135,072.72 0.87
Rp 528,754,971.90 1.97
Rp 7,276,000.00 0.03
Rp 229,039,298.09 0.85
UKIRAN 3 Rp 514,612,500.00 1.91

DAG +9.50 DAN ATAP


Rp 13,396,724.69 0.05
Rp 41,442,020.26 0.15
Rp 56,365,811.93 0.21
Rp 957,275,013.61 3.56

Rp 326,024,420.00 1.21
Rp 200,657,600.00 0.75
Rp 92,576,400.00 0.34
Rp 74,780,500.00 0.28
Rp 107,268,200.00 0.40
Rp 144,690,500.00 0.54
Rp 80,514,000.00 0.30
bel Feeder Rp 307,794,344.50 1.15
Rp 319,858,500.00 1.19
Rp 44,887,300.00 0.17
Rp 158,399,400.00 0.59

Rp 711,947,050.00 2.65
Rp 170,888,500.00 0.64
tor dan Hujan Rp 194,525,700.00 0.72
Rp 78,127,000.00 0.29
Rp 254,000,000.00 0.95
Rp 1,139,064,400.00 4.24
Rp 439,500,000.00 1.64

Rp 870,560,359.28 3.24
JUMLAH FISIK Rp 26,878,293,583.22 100.00
1 2
PPN 10% Rp 2,687,829,358.32 BOBOT PER MINGGU
JUMLAH FISIK + PPN 10 % Rp 29,566,122,941.55 BOBOT KUMULATIF
DIBULATKAN Rp 29,566,122,000.00

PONDASI 21.88
STR 30.32
ARS 26.53
ME 18.03
LAND 3.24
BULAN 1 BULAN 2

1 2 3 4 5 6

1.32 1.32 1.32 1.32

0.49 0.49
1.95 1.95
1 2 3 4 5 6 7
1.32 1.32 1.81 1.81 1.95 1.95
1.32 2.64 4.44 6.25 8.20 10.15

6.25
BULAN 2 BULAN 3

7 8 9 10 11 12

1.95 1.95 1.95 1.95 1.95 1.95

0.71 0.71
`
6 7 8 9 10 11 12
1.95 1.95 1.95 1.95 2.67 2.67
12.11 14.06 16.02 17.97 20.64 23.31

7.81 9.24
BULAN 4 BULAN 5

13 14 15 16 17 18

0.50 0.50
0.10
1.18 1.18 1.18
1.00 1.00 1.00 1.00 1.00
0.68 0.68
0.89 0.89 0.89
0.91 0.91 0.91
0.54 0.54
0.95 0.95
0.99 0.99
0.26
0.68
1.21
0.11
0.11
0.08
0.22

0.19
0.23
0.05
0.08
0.07
11 12 13 14 15 16 17
2.67 2.78 2.85 3.48 6.22 6.63
25.98 28.76 31.61 35.09 41.31 47.94

11.79 3
BULAN 5 BULAN 6

19 20 21 22 23 24

0.89
0.91 0.91

1.21
0.11

0.22

0.59
0.30
0.48
0.21
1.19
1.32
0.37

2.54
1.05
0.88
1.76
0.28
1.00
1.46

2.57
0.94
0.87
1.97
0.03
0.85
1.91

0.05
0.15
0.21
3.56

1.21
0.75
0.34
0.28
0.40
0.54
0.30
1.15
1.19
0.17
0.59

2.65
0.64
0.72
0.29
0.95
1.41

16 17 18 19 20 21
11.38 11.77 8.03 5.77 4.04 3.37
59.32 71.09 79.12 84.89 88.93 92.30

36.00 21.21
BULAN 7 BULAN 8

25 26 27 28 29 30
1.41 1.41
0.55 0.55 0.55

0.54 0.54 0.54 0.54

21 22 23 24 25 26
1.96 1.96 1.08 0.54 0.54 0.54
94.26 96.22 97.30 97.84 98.38 98.92

5.54
BULAN 8
KONTROL
31 32

5.27 1

0.97 1
15.63 1
- 1
1.43 1
1.01 1
0.10 1
3.53 1
4.98 1
1.37 1
3.56 1
4.56 1
1.08 1
1.90 1
1.98 1
0.26 1
0.68 1
2.42 1
0.11 1
0.23 1
0.08 1
0.45 1
- 1
0.19 1
0.23 1
0.05 1
0.08 1
0.07 1
- 1
- 1
0.59 1
0.30 1
0.48 1
0.21 1
1.19 1
1.32 1
0.37 1
- 1
- 1
- 1
2.54 1
1.05 1
0.88 1
1.76 1
0.28 1
1.00 1
1.46 1
- 1
- 1
- 1
- 1
- 1
2.57 1
0.94 1
0.87 1
1.97 1
0.03 1
0.85 1
1.91 1
- 1
- 1
- 1
0.05 1
0.15 1
0.21 1
3.56 1
- 1
- 1
- 1
- 1
1.21 1
0.75 1
0.34 1
0.28 1
0.40 1
0.54 1
0.30 1
1.15 1
1.19 1
0.17 1
0.59 1
- 1
2.65 1
0.64 1
0.72 1
0.29 1
0.95 1
4.24 1
1.64 1
- 1
0.54 0.54 2.70 0

5 26 27 28
0.54 0.54
99.46 100.00

2.16
CASH FLOW
PENYUSUNAN DED GEDUNG KANTOR BPMPTSP KOTA PADANG

NILAI PROYEK
UANG MUKA 25%
RETENSI 5%

NO URAIAN PEKERJAAN

1 NILAI PROYEK
2 BOBOT PER MINGGU
3 BOBOT KUMULATIF

A CASH IN
I UANG MUKA 25%
II PINJAMAN KANTOR
JUMLAH CASH IN

B CASH OUT
I PEKERJAAN PONDASI DAN STRUKTUR BERTULANG
1 PEKERJAAN PENDAHULUAN
2 PEKERJAAN PONDASI
1 PEKERJAAN TANAH
2 PEKERJAAN PONDASI KSLL
3 PEKERJAAN BETON BERTULANG
1 PEKERJAAN PLAT PENAHAN TANAH
2 KOLOM P + -2,90 - 0,00
3 PEKERJAAN BALOK P - 036
4 PEKERJAAN BALOK P + 0,00
5 PEKERJAAN PLAT P + 0,00
6 KOLOM P + 0,00 - 3,60
7 PEKERJAAN BALOK P + 3,60
8 PEKERJAAN PLAT P + 3,60
9 KOLOM P + 3,60 - 7,20
10 PEKERJAAN BALOK P + 7,20
11 PEKERJAAN PLAT P + 7,20
12 KOLOM P +( 7,20 - 9,50) & (7,20 - 8,30)
13 PEKERJAAN BALOK P + 8,30
14 PEKERJAAN PLAT TALANG AIR BETON + 8,30
15 PEKERJAAN BALOK P + 8,40
16 PEKERJAAN PLAT P + 8,40
17 PEKERJAAN BALOK P + 9,50
18 PEKERJAAN PLAT P + 9,50
4 PEKERJAAN TANGGA
1 PEKERJAAN TANGGA 1 LANTAI DASAR ( 2 Unit)
2 PEKERJAAN TANGGA 1 LANTAI 1 ( 2 Unit)
3 PEKERJAAN TANGGA 2 ( 1 Unit)
4 PEKERJAAN TANGGA 3 ( 1 Unit)
5 PEKERJAAN TANGGA 3 ( 1 Unit)

II PEKERJAAN AKSITEKTUR LANTAI DASAR


1. PEK. DINDING
2. PEK. PINTU DAN JENDELA
3. PEKERJAAN PLAFOND
4. PEK. LANTAI
5. PEK. FINISHING TANGGA DAN RAM
6. PEK. DRAINASE
7. PEK. KELILING POT BUNGA KELL. BANGUNAN
III PEKERJAAN AKSITEKTUR LANTAI I
1 PEK. DINDING
2 PEK. PINTU DAN JENDELA
3 PEKERJAAN PLAFOND
4 PEK. LANTAI
5 PEK. FINISHING TANGGA
6 PEK. TOILET DAN ACCESORIS
7 PEK. CUTTING PLAT DAN UKIRAN 3

IV PEKERJAAN AKSITEKTUR LANTAI II


1 PEK. DINDING
2 PEK. PINTU DAN JENDELA
3 PEKERJAAN PLAFOND
4 PEK. LANTAI
5 PEK. FINISHING TANGGA
6 PEK. TOILET DAN ACCESORIS
7 PEK. CUTTING PLAT DAN UKIRAN 3

V PEKERJAAN LANTAI DAG +8.30, LANTAI DAG +9.50 DAN ATAP


1. PEK. DINDING
2. PEK. PINTU DAN JENDELA
3. PEKERJAAN PLAFOND
4. PEK. ATAP

VI PEKERJAAN MEKANIKAL ELEKTRIKAL


1. PEKERJAAN ELEKTRIKAL
A Pekerjaan Instalasi Listrik Gedung
B Pek. CCTV
C Pek. Telephone & PABX
D Pek. Intalasi Network
E Pek. MATV
F Pek. FIRE ALARM
G Pek. Sound System
H Pek Sambungan Listrik + Kabel Feeder
I Pek. Panel
J Pek. Penangkal Petir
K Pek. Kabel Tray
2. PEKERJAAN MEKANIKAL
A Pek. Instalasi Kebakaran
B Pek. Instalasi Air Bersih
C Pek. Instalasi Air Bekas, Kotor dan Hujan
D Pek. Rooftank FRP
E Water Treatment Plant (WTP)
F Pek. Air Conditioner ( AC )
G Pek. Genset

VII PEKERJAAN LANDSCAPE

JUMLAH FISIK + PPN 10 %

VIII PENGEMBALIAN UANG MUKA

IX RETENSI

X PENGEMBALIAN RETENSI

XI PENGEMBALIAN PINJAMAN KANTOR

JUMLAH CASH OUT

C CASH IN - CASH OUT


D SISA KAS
P KOTA PADANG

26,878,293,583.22
6,719,573,395.81
1,343,914,679.16

AAN JUMLAH HARGA BOBOT

26,878,293,583.22

ERTULANG
Rp 1,417,126,877.40 5.27

Rp 262,054,804.68 0.97
Rp 4,200,972,778.02 15.63
N TANAH Rp 384,110,402.51 1.43
Rp 270,833,522.98 1.01
Rp 27,803,377.34 0.10
Rp 947,818,934.99 3.53
Rp 1,337,736,636.97 4.98
Rp 366,983,016.86 1.37
Rp 956,925,887.06 3.56
Rp 1,226,712,638.04 4.56
Rp 289,123,459.94 1.08
Rp 509,941,628.14 1.90
Rp 533,426,690.20 1.98
7,20 - 8,30) Rp 69,894,452.42 0.26
Rp 182,443,543.06 0.68
AIR BETON + 8,30 Rp 650,602,904.08 2.42
Rp 29,165,172.13 0.11
Rp 60,748,834.93 0.23
Rp 20,820,172.59 0.08
Rp 120,047,463.05 0.45
Rp - -
NTAI DASAR ( 2 Unit) Rp 51,342,354.20 0.19
NTAI 1 ( 2 Unit) Rp 60,606,830.91 0.23
Rp 13,139,366.38 0.05
Rp 20,709,311.85 0.08
Rp 19,464,179.56 0.07

Rp 157,905,557.31 0.59
Rp 80,579,748.38 0.30
Rp 129,486,280.41 0.48
Rp 56,622,750.49 0.21
DAN RAM Rp 319,789,162.73 1.19
Rp 353,523,717.63 1.32
A KELL. BANGUNAN Rp 99,099,795.68 0.37
Rp 681,461,196.31 2.54
Rp 281,325,950.48 1.05
Rp 236,501,382.23 0.88
Rp 472,107,293.72 1.76
Rp 74,142,321.47 0.28
Rp 267,651,186.93 1.00
UKIRAN 3 Rp 393,420,000.00 1.46

Rp 691,317,851.02 2.57
Rp 253,442,561.14 0.94
Rp 235,135,072.72 0.87
Rp 528,754,971.90 1.97
Rp 7,276,000.00 0.03
Rp 229,039,298.09 0.85
UKIRAN 3 Rp 514,612,500.00 1.91

DAG +9.50 DAN ATAP


Rp 13,396,724.69 0.05
Rp 41,442,020.26 0.15
Rp 56,365,811.93 0.21
Rp 957,275,013.61 3.56

Rp 326,024,420.00 1.21
Rp 200,657,600.00 0.75
Rp 92,576,400.00 0.34
Rp 74,780,500.00 0.28
Rp 107,268,200.00 0.40
Rp 144,690,500.00 0.54
Rp 80,514,000.00 0.30
bel Feeder Rp 307,794,344.50 1.15
Rp 319,858,500.00 1.19
Rp 44,887,300.00 0.17
Rp 158,399,400.00 0.59

Rp 711,947,050.00 2.65
Rp 170,888,500.00 0.64
tor dan Hujan Rp 194,525,700.00 0.72
Rp 78,127,000.00 0.29
Rp 254,000,000.00 0.95
Rp 1,139,064,400.00 4.24
Rp 439,500,000.00 1.64

Rp 870,560,359.28 3.24
JUMLAH FISIK Rp 26,878,293,583.22 100.00
PPN 10% Rp 2,687,829,358.32
JUMLAH FISIK + PPN 10 % Rp 29,566,122,941.55
DIBULATKAN Rp 29,566,122,000.00
BULAN 1

1 2 3

354,281,719.35 354,281,719.35 485,309,121.69


354,281,719.35 708,563,438.70 1,193,872,560.39

6,719,573,395.81
5,000,000,000.00
11,719,573,395.81

354,281,719.35 354,281,719.35 354,281,719.35

131,027,402.34
1,343,914,679.16

354,281,719.35 354,281,719.35 485,309,121.69

10,021,376,997.29 9,667,095,277.94 9,181,786,156.25


1 2 3
BULAN 2

4 5 6

485,309,121.69 525,121,597.25 525,121,597.25


1,679,181,682.08 2,204,303,279.33 2,729,424,876.59

2,204,303,279.33

354,281,719.35

131,027,402.34
525,121,597.25 525,121,597.25
1,679,893,348.95

485,309,121.69 525,121,597.25 525,121,597.25

8,696,477,034.56 8,695,765,367.69 8,170,643,770.44


3 4 5 6
BULAN 2

7 8 9

525,121,597.25 525,121,597.25 525,121,597.25


3,254,546,473.84 3,779,668,071.09 4,304,789,668.34

2,100,486,389.01

525,121,597.25 525,121,597.25 525,121,597.25


`
1,679,893,348.95

525,121,597.25 525,121,597.25 525,121,597.25

7,645,522,173.19 7,120,400,575.94 7,015,872,018.74


6 7 8
BULAN 3

10 11 12

525,121,597.25 717,176,798.51 717,176,798.51


4,829,911,265.60 5,547,088,064.10 6,264,264,862.61

525,121,597.25 525,121,597.25 525,121,597.25


192,055,201.26 192,055,201.26
525,121,597.25 717,176,798.51 717,176,798.51

6,490,750,421.49 5,773,573,622.98 5,056,396,824.47


8 9 10 11
BULAN 4

13 14 15

718,903,733.88 746,707,111.23 766,978,480.82


6,983,168,596.50 7,729,875,707.72 8,496,854,188.54

2,678,378,928.15
135,416,761.49 135,416,761.49
27,803,377.34
315,939,645.00 315,939,645.00 315,939,645.00
267,547,327.39 267,547,327.39 267,547,327.39
183,491,508.43
1,679,893,348.95

718,903,733.88 746,707,111.23 766,978,480.82

5,335,978,669.79 4,589,271,558.56 3,822,293,077.74


11 12 13
BULAN 5

16 17

935,612,835.20 1,670,705,211.39
9,432,467,023.74 11,103,172,235.14

4,120,003,638.64
267,547,327.39 267,547,327.39
183,491,508.43
239,231,471.77 239,231,471.77
245,342,527.61 245,342,527.61
144,561,729.97
254,970,814.07
266,713,345.10
69,894,452.42
182,443,543.06
1,679,893,348.95

935,612,835.20 1,670,705,211.39

2,886,680,242.54 3,656,085,320.84
13 14 15
BULAN 5

18 19

1,781,766,877.17 3,060,067,759.83
12,884,939,112.31 15,945,006,872.14
239,231,471.77 239,231,471.77
245,342,527.61 245,342,527.61
144,561,729.97
254,970,814.07
266,713,345.10

325,301,452.04 325,301,452.04
29,165,172.13
30,374,417.47 30,374,417.47
20,820,172.59
60,023,731.52 60,023,731.52

51,342,354.20
60,606,830.91
13,139,366.38
20,709,311.85
19,464,179.56

157,905,557.31
80,579,748.38
129,486,280.41
56,622,750.49
319,789,162.73
353,523,717.63
99,099,795.68
681,461,196.31
281,325,950.48
1,781,766,877.17 3,060,067,759.83

1,874,318,443.67 - 1,185,749,316.16
15 16 17
BULAN 6

20 21

3,162,680,096.02 1,956,734,609.11
19,107,686,968.16 21,064,421,577.26

9,961,249,342.13
245,342,527.61
236,501,382.23
472,107,293.72
74,142,321.47
267,651,186.93
393,420,000.00

691,317,851.02
253,442,561.14
235,135,072.72
528,754,971.90
7,276,000.00
229,039,298.09
514,612,500.00

13,396,724.69

957,275,013.61
3,162,680,096.02 1,956,734,609.11

- 4,348,429,412.18 3,656,085,320.84
17 18 19
BULAN 6

22 23

1,751,972,296.68 1,086,122,250.00
22,816,393,873.95 23,902,516,123.95
41,442,020.26
56,365,811.93

326,024,420.00
200,657,600.00
92,576,400.00
74,780,500.00
107,268,200.00
144,690,500.00
80,514,000.00
307,794,344.50
319,858,500.00
44,887,300.00
158,399,400.00

711,947,050.00
170,888,500.00

1,751,972,296.68 1,086,122,250.00

1,904,113,024.15 817,990,774.15
19 20 21
BULAN 7

24 25 26

906,340,833.33 526,188,133.33 526,188,133.33


24,808,856,957.28 25,335,045,090.62 25,861,233,223.95

4,270,623,513.35
194,525,700.00
78,127,000.00
254,000,000.00
379,688,133.33 379,688,133.33 379,688,133.33
146,500,000.00 146,500,000.00

906,340,833.33 526,188,133.33 526,188,133.33

- 88,350,059.18 3,656,085,320.84 3,129,897,187.51


21 22 23
BULAN 7

27 28 29

291,593,393.21 145,093,393.21 145,093,393.21


26,152,826,617.16 26,297,920,010.37 26,443,013,403.59

1,107,968,312.97
146,500,000.00

145,093,393.21 145,093,393.21 145,093,393.21

291,593,393.21 145,093,393.21 145,093,393.21

2,838,303,794.29 2,693,210,401.08 3,656,085,320.84


23 24 25
BULAN 8

30 31 32

145,093,393.21 145,093,393.21 145,093,393.21


26,588,106,796.80 26,733,200,190.01 26,878,293,583.22

435,280,179.64
145,093,393.21 145,093,393.21 145,093,393.21

1,343,914,679.16

5,000,000,000.00

145,093,393.21 145,093,393.21 145,093,393.21

3,510,991,927.63 3,365,898,534.41 3,656,085,320.84


- 0.00

26 27 28
KONTROL

1,417,126,877.40 0

262,054,804.68 0
4,200,972,778.02 0
-
384,110,402.51 0
270,833,522.98 0
27,803,377.34 0
947,818,934.99 0
1,337,736,636.97 0
366,983,016.86 0
956,925,887.06 0
1,226,712,638.04 0
289,123,459.94 0
509,941,628.14 0
533,426,690.20 0
69,894,452.42 0
182,443,543.06 0
650,602,904.08 0
29,165,172.13 0
60,748,834.93 0
20,820,172.59 0
120,047,463.05 0
-
51,342,354.20 0
60,606,830.91 0
13,139,366.38 0
20,709,311.85 0
19,464,179.56 0
-
-
157,905,557.31 0
80,579,748.38 0
129,486,280.41 0
56,622,750.49 0
319,789,162.73 0
353,523,717.63 0
99,099,795.68 0
-
-
681,461,196.31 0
281,325,950.48 0
236,501,382.23 0
472,107,293.72 0
74,142,321.47 0
267,651,186.93 0
393,420,000.00 0
-
-
691,317,851.02 0
253,442,561.14 0
235,135,072.72 0
528,754,971.90 0
7,276,000.00 0
229,039,298.09 0
514,612,500.00 0
-
-
13,396,724.69 0
41,442,020.26 0
56,365,811.93 0
957,275,013.61 0
-
-
-
326,024,420.00 0
200,657,600.00 0
92,576,400.00 0
74,780,500.00 0
107,268,200.00 0
144,690,500.00 0
80,514,000.00 0
307,794,344.50 0
319,858,500.00 0
44,887,300.00 0
158,399,400.00 0
-
711,947,050.00 0
170,888,500.00 0
194,525,700.00 0
78,127,000.00 0
254,000,000.00 0
1,139,064,400.00 0
439,500,000.00 0

870,560,359.28 0
28