Professional Documents
Culture Documents
Fmea Table 2019
Fmea Table 2019
FMEA Table
Steps in the Failure Mode Likelihood of Likelihood of Severity Risk Priority Number
Improvement Occurrence Detection (1–10) (RPN)
Plan Process * (1–10) (1–10)
PAGE 1
SAT1: Task 2 – RCA and FMEA FMEA Table
*do not include more than four steps in the improvement plan process
PAGE 2