Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

V.

REGISTRATION REQUIREMENTS y People’s Credit and Finance Corporation (PCFC)


2F, Accelerando Bldg., 395 Sen. Gil Puyat Avenue
Makati City
1. Business Name Certification Tel. Nos.: (632) 897.8549/5822 / 899.6074 / 752.1491
Department of Trade & Industry (DTI) within NCR Fax Nos.: (632) 897.8523/8528
Validity: 5 years Email: info@pcfc.ph
Web: www.pcfc.gov.ph
a. Area 1 Office (Manila, Pasay, Makati)
Mezzanine Floor, Roxas Strip Bldg., Roxas Blvd., corner
Arnaiz Avenue, Pasay City VI. TECHNICAL ASSISTANCE
Tel. No.: (632) 659.4203 / Fax No. 804.0307
Email: emma_asusano@hotmail.com y DTI-Cottage Industry Technology Center (CITC)
20 Russet St., SSS Village, Marikina City
b. Area 2 Office (Las Piñas, Parañaque, Pasig, Muntinlupa) Tel. Nos.: (632) 942.0880 / 942.3974
2/F Atrium of Makati Bldg., Makati Ave., corner Email: citc_dti@yahoo.com
Paseo de Roxas St., Makati City
Tel. No.: (632) 864.0847 / Fax No. 864.0829 y Technology Resource Center (TRC)
Email: dtincr2@gmail.com 2/F, Jacinta II Bldg., EDSA, Guadalupe Nuevo
Makati City
c. Area 3 Office (Mandaluyong, Quezon City, Marikina, San Tel. Nos.: (632) 822-50-87
Juan) Email: tlidsg@yahoo.com
G/F Highway 54 Plaza, EDSA Mandaluyong City http://www.trc.dost.gov.ph
(across SM Megamall)
Telefax. Nos.: (632) 706.1767 / 706.1703 y Technical Education and Skills Development
Email: dtincr3@info.com.ph Authority For Women Center (TESDA-WC)
37 East Service Rd., South Superhighway, Taguig City
d. Area 4 Office (Caloocan, Malabon, Navotas, Valenzuela) Trunkline: (632) 887-7777
5/F Araneta Square Mall, Bonifacio Monumento Circle, Email: tesdacontactcenter@gmail.com
Rizal Avenue, Ext. Cor. Samson Rd., Caloocan City http://twc.tesda.gov.ph
Tel. No.: (632) 332.0829 / Fax No. 322.0854
Email: emd@dtincr.ph / dtincr4@info.com.ph

For businesses located outside Metro Manila, you can


register your business at the DTI Provincial Office where the
business is located or log on to www.bnrs.dti.gov.ph for
online registration

2. Mayor’s Permit/ Residence Certificate & Sanitary Permit


From the local municipality where the business is located
Validity: 1 year

3. Tax Identification Number (TIN)


Bureau of Internal Revenue Na ional
Office, Agham Road, Diliman, Quezon City
Trunkline: (632) 981.70000 / 981.8888
Email: contact_us@cctr.bir.gov.ph
www.bir.gov.ph

VI. FINANCING

y SSS Special Financing Program


Social Security System (SSS)
Loans and Investment Office
SSS Building, East Avenue, Diliman, Quezon City
Tel. Nos.: (632) 920.6401 / 920.6446
Email: member_relations@sss.gov.ph
www.sss.gov.ph

y Small & Medium Enterprise Credit


Phil. Business for Social Progress
BUREAU OF MICRO, SMALL AND MEDIUM
18th Flr., Phil. Social Dev’t. Center,
ENTERPRISE DEVELOPMENT (BMSMED)
Magallanes cor. Real St., Intramuros, Manila

Printed July 2012


5/F, Trade and Industry Building
Tel. Nos.: (632) 527.7741 to 48
Fax No.: (632) 527.3743 361 Sen. Gil J. Puyat Ave. Makati City
Tel. Nos.: (02) 897.1693 / 897.7596 / 890.4968
Fax No.: (02) 896.7916  Email: bmsmed@dti.gov.ph
www.dti.gov.ph
Starting a Business

Flower arrangement is the combination of several elements to II. PROCEDURES III. PRICING AND COSTING
produce a visually pleasing display of fresh, silk, or dried flowers.
Flowers are arranged in several basic designs, including vertical, Bouquet
Particulars Cost
horizontal, triangular, crescent, and oval arrangements. Floristry is
the general term used to describe the professional floral trade. It 1. Attach the stick to the foam and secure it by using a Direct cost for 2 bouquets P 470.00
encompasses flower care and handling, floral design or flower plastic string. Add: Indirect Cost 117.14
arranging, merchandising, display, and flower delivery. Floral Design 2. Soak the floral foam in water with sugar or chlorine until it
Total 587.14
or floral arts is the art of creating flower arrangements in vases, stops to bubble.
bowls, baskets or other containers, or making bouquets and 3. Cover the stick with floral tape, hiding the string. Add: 25% mark-up 146.78
compositions from cut flowers, foliages, herbs, ornamental grasses, 4. Arrange small amount of Formosa leaves on the floral Selling Price for 2 Bouquets
and other botanical materials. foam. P 733.92
(P366.96 /bouquet x 2)
5. Arrange the fresh flowers in an arc shape or dome l ke.
I. INVESTMENT REQUIREMENTS 6. Insert some fresh leaves and Angel’s Breath fresh flowers
Current market rate per bouquet P400.00 - 600.00
to highlight your arrangement.
depending on the location and season
Equipment 7. Attach the doily using a glue gun.
Qty. Descriptions Amount 8. Make two ribbons using the wires and attach it to the stick
below the doily.
1 Scissor P 60.00 9. Cover the stick with a floral tape, covering the wires. III. ESTIMATED SALES PER DAY
1 Cutter 60.00
1 Glue gun 170.00 Particulars Amount

Total P 290.00 Topiary Sales of bouquets (15 /day x 366.96) P5,504.40

1. Insert the 2 wired pieces of mums stem in a dome shaped Less: Operating expenses
Supplies foam and secure it with string (topiary form). Soak foam
Electricity (70.00 /day) P70.00
Qty. Materials Amount in water until it stops to bubble.
2. Put the soaked floral foam in the bottom of the clay pot Raw materials (7.5 doz of 3,525.00
1 doz. Assorted fresh flowers @ P130 130.00
then place topiary form in. flowers and leaves x P470.00)
1 doz. Assorted fresh leaves @ P70 70.00
3. Cover the topiary with Formosa and the foam between the
1 roll Floral tape @ P50 50.00 Transportation 70.00
topiary and the pot.
2 bricks Floral foam @ P20 40.00 4. Arrange the mums in a ball-like shape.
2 pcs. Flower vase / clay pot @ P30 60.00 Water 60.00
5. Arrange flowers at the bottom.
1 doz. Bamboo sticks @ P40 40.00
Labor (426.00 /day x 2 work- 852.00 4,577.00
1 roll Strings / wires @ P40 40.00
ers)
1 roll R bbons / lace @ P40 40.00 Corsage Making
Sub – Total P 470.00 Net Income Per Day P927.40
1. Cut the head of the flower, leaving ¾” stem. Insert the
* Can make 2 bouquets per dozen of assorted fresh flowers end of a stem wire vertically into the base. Note: Other income can be generated from sale of topiary, corsage
2. Loosely wrap the wire around the full length of the stem in flowers, and other fresh flower products.
Indirect Cost* a spiral. Cover the stem and wire with floral tape.
Particulars Cost 3. After wiring the flower head, add the fillers and greens to
Labor cost (Php 426 day x 2 workers / 15 56.80 the flower by wrapping them together using florist’s wire.
bouquets per day) Always add the filler first to surround the flower and the
Electricity (Php 70.00 per day / 15) 4.67 foliage last to frame it in.
Transportation (Php 70.00 per day) 4.67 4. Cut excess wire off after wrapping around twice. This
Water (Php 60.00 per day) 4.00 keeps the cluster from getting too heavy.
Contingency (10% of direct costs) 47.00 5. Attach the florist bow by wiring. Cover the stem with floral
tape. Attach the safety pin.
Total Indirect Costs ** P 117.14

* based on 15 bouquets average produced per day of 2 skilled


workers

You might also like