Practitioner Exam Questions

® 8
PRINCE2 Practitioner Resource Book

Syllabus Area Question Number Part 2 Marks


Change Theme 9 A 4

The project is now in Stage 3.


Use the project scenario to answer the following 4 questions.
Column 1 contains a number of issues for this project. Select from Column 2 the appropriate
category for each issue. Each option in column 2 may be used once, more than once or not at all.
Column 1 Column 2
1 Although not previously considered, the Park Director A Problem or concern
wants a water feature to be included within the
landscaping work. B Request for change
2 Whilst installing the new electrical services it was C Off-specification
discovered that the incoming supply is faulty causing a
serious delay.
3 The ride seating was signed off now it appears that the
paint colour used does not match that stated in the
product description.
4 The operational staff have asked for a different type of IT
system to that previously agreed.

Question Part

9 A A B C

1
2
3
4