1. INTRODUCTION
The main objective of this structural calculation report is the consolidation of Pile reactions for
analysis of design of Pile foundation at Building 22 for Doha Port Re-development Project,
combined Mina District and Sea Water Diving Pool Works.
Included herein are the codes and standards, along with the list of reference documents to be
used in the structural calculation for Pile reactions at Building 22.
BS EN 1992 - Design of Concrete Structures - Part 1 - 1: General Rules and rules for
Buildings
Refer to Appendix A for the reference documents to be used in the structural calculation for
consolidation of Pile reactions. List of reference drawings as follows:
Architectural drawings:
DPP-DPQ-D-MDP-C-AR-00-22-1000
DPP-DPQ-D-MDP-C-AR-01-22-1001
DPP-DPQ-D-MDP-C-AR-02-22-1002
DPP-DPQ-D-MDP-C-AR-03-22-1003
DPP-DPQ-D-MDP-C-AR-AL-22-2001
DPP-DPQ-D-MDP-C-AR-AL-22-2002
DPP-DPQ-D-MDP-C-AR-AL-22-3001
Structural drawings:
DPP-DPQ-D-MDP-C-FN-FN-00-22-1000
DPP-DPQ-D-MDP-C-ST-00-22-1000
DPP-DPQ-D-MDP-C-ST-00-22-1100
DPP-DPQ-D-MDP-C-ST-00-22-1200
DPP-DPQ-D-MDP-C-ST-00-22-1300
DPP-DPQ-D-MDP-C-ST-01-22-1101
DPP-DPQ-D-MDP-C-ST-01-22-1201
DPP-DPQ-D-MDP-C-ST-01-22-1301
DPP-DPQ-D-MDP-C-ST-02-22-1102
DPP-DPQ-D-MDP-C-ST-02-22-1202
DPP-DPQ-D-MDP-C-ST-02-22-1302
DPP-DPQ-D-MDP-C-ST-03-22-1103
DPP-DPQ-D-MDP-C-ST-03-22-1203
DPP-DPQ-D-MDP-C-ST-03-22-1303
DOHA PORT RE-DEV. PROJECT COMBINED MINA DISTRICT & SEA WATER DIVING POOL WORKS
DOHA PORT RE-DEV. PROJECT COMBINED MINA DISTRICT & SEA WATER DIVING POOL WORKS
DOHA PORT RE-DEV. PROJECT COMBINED MINA DISTRICT & SEA WATER DIVING POOL WORKS
Unless specified otherwise, the following materials’ characteristics and design specifications
shall be used in the design calculations and structural models as discussed below along with
the material design parameters to be used in the structural report for Pile reactions calculation
at Doha Port Re-development Project.
3.1 UNITS
Units to be used in the calculation shall be in accordance with SI Units, meter (m), centimeter
(cm), millimeter (mm), Newton (N) and Kilo Newton (kN) shall be used. If the loading values
given by mechanical or by others are in tons or kg, the given values shall be transferred to the
equivalent values in SI unit, such as 5kN (for 0.5tons), 294kN (for 30tons), 1kN/m2 (for 100
kg/m2), 4.9kN/m (for 500kg/m) 1 ton equals 9.8kN in general, alternatively it may be considered
as 10kN for small loads having less than 1 ton
DOHA PORT RE-DEV. PROJECT COMBINED MINA DISTRICT & SEA WATER DIVING POOL WORKS
4. PERFORMANCE REQUIREMENTS
Pile reactions to be used for Doha Port Redevelopment Project shall be calculated for
the load combinations shown below and shall be within the limits of Eurocode for
concrete for Ultimate Limit State (ULS) and Serviceability Limit State (SLS).
The provision for the load combination for the structural design and review of the project
shall be based on the construction stage, ultimate limit state and serviceability
requirements.
With an appropriate degree of safety, the steel structure should sustain all the loads and
deformations of normal construction and use.
In checking the capacity of pile and formulating pile reactions, or of any part of it, the specified
loads shall be multiplied by the relevant partial factors as per Eurocode.
DOHA PORT RE-DEV. PROJECT COMBINED MINA DISTRICT & SEA WATER DIVING POOL WORKS
DOHA PORT RE-DEV. PROJECT COMBINED MINA DISTRICT & SEA WATER DIVING POOL WORKS
Ultimate limit states concern the safety of the whole or part of the structure to achieve an
acceptable probability that it will perform satisfactorily during their intended life.
Load combinations in accordance with Eurocode which are summarized in the table below.
The deformation or vibration of the structure or of any part of it under serviceability loads should
not adversely affect its strength, efficiency, appearance or its use.
DOHA PORT RE-DEV. PROJECT COMBINED MINA DISTRICT & SEA WATER DIVING POOL WORKS
Structural modelling, analysis and design shall be done using Autodesk Robot Structural
Analysis Professional 2020.
6. STRUCTURAL MODEL
Shown below is the screen capture of the 3D model of the Steel Frame using Autodesk Robot
Structural Analysis Professional 2020.
DOHA PORT RE-DEV. PROJECT COMBINED MINA DISTRICT & SEA WATER DIVING POOL WORKS
DOHA PORT RE-DEV. PROJECT COMBINED MINA DISTRICT & SEA WATER DIVING POOL WORKS
DOHA PORT RE-DEV. PROJECT COMBINED MINA DISTRICT & SEA WATER DIVING POOL WORKS
DOHA PORT RE-DEV. PROJECT COMBINED MINA DISTRICT & SEA WATER DIVING POOL WORKS
DOHA PORT RE-DEV. PROJECT COMBINED MINA DISTRICT & SEA WATER DIVING POOL WORKS
APPENDIX A
DOHA PORT RE-DEV. PROJECT COMBINED MINA DISTRICT & SEA WATER DIVING POOL WORKS
DOHA PORT RE-DEV. PROJECT COMBINED MINA DISTRICT & SEA WATER DIVING POOL WORKS