PLAN LEGEND

PROPERTY LINE
1240 PROPOSED CONTOURS MAJOR / MINOR

EXISTING CONTOURS MAJOR / MINOR

DROP INLET

MANHOLE
HDPE PIPE
PROPOSED LIMIT OF DISTURBANCE
g g PROPOSED DITCH
WATERSHED BOUNDARY

PROPOSED ROCK CHECK DAM

59
4
g
590 PROPOSED ROOF DRAIN COLLECTION

57
59 PIPES (TO BE PART OF THE BUILDING

57
2

g
DESIGN)

6
g
590

g
PRE-DEVELOPMENT590DRAINAGE AREA g g g
g g
580 g g

g
g 580
AREA = 61.5 ACRES

g
576

g
58

6
8

57

g
IMPERVIOUS AREA = 1.3 ACRES

g
GRASS AREA = 60.2 ACRES 58

g
560 6

580
578

g
560 1 YR STORM DISCHARGE = 76.15 CFS

59
g

0
g
582 580
g

584
578
g

578

582
580

0
0

58
584
59
570 570
560 582
580
574 580
580
578

57
0

576

6
580 58
6

578
6 57 578
57
560 578

0
58
578 580 57
8
560

580
580 57
0 6
58
570

57
580

8
57

58 g
8

0
57

g g g
6

g g g g g g g g 580
57

g
4

580
g
g g g
g

©
1
PLAN LEGEND
PROPERTY LINE
1240 PROPOSED CONTOURS MAJOR / MINOR

EXISTING CONTOURS MAJOR / MINOR

DROP INLET

MANHOLE
HDPE PIPE
PROPOSED LIMIT OF DISTURBANCE
g g PROPOSED DITCH
WATERSHED BOUNDARY

PROPOSED ROCK CHECK DAM

59
4
g
590 PROPOSED ROOF DRAIN COLLECTION

57
59 PIPES (TO BE PART OF THE BUILDING

57
2

g
DESIGN)

6
g
POST-DEVELOPMENT DRAINAGE AREA A 590

g
590 580
STORMWATER BASIN g g g
g g
g g

g
g 580
AREA = 48.9 ACRES

g
576

g
58

6
8

57

g
IMPERVIOUS AREA = 15.8 ACRES

g
GRASS AREA = 33.1 ACRES 58

g
560 6

580
578

g
560 1 YR STORM DISCHARGE = 0.85 CFS

59
g

0
g
582 580
g

584
578
g

578

582
580

0
0

58
584
59
570 570
560 582
580
574 580
580
578

57
0

576

6
580 58
6

578
6 57 578
57
560 578

0
58
578 580 57
8
560

580
580 57
0 6
58
570

57
580

8
57

58 g
8

0
57

g g g
6

g g g g g g g g 580
57

g
4

POST-DEVELOPMENT DRAINAGE AREA B


g

580
g
SETTLING/REUSE BASIN
g g g
g AREA = 24.7 ACRES
IMPERVIOUS AREA = 13.5 ACRES
GRASS AREA = 11.2 ACRES
1 YR STORM DISCHARGE = 0.00 CFS

©
2
1
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 5 / 2017

Hyd. No. 62
PRE-DEVELOPMENT
Hydrograph type = SCS Runoff Peak discharge = 76.15 cfs
Storm frequency = 1 yrs Time to peak = 720 min
Time interval = 3 min Hyd. volume = 175,267 cuft
Drainage area = 61.500 ac Curve number = 79*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 6.00 min
Total precip. = 2.50 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484

* Composite (Area/CN) = [(60.200 x 79) + (1.300 x 98)] / 61.500

PRE-DEVELOPMENT
Q (cfs) Q (cfs)
Hyd. No. 62 -- 1 Year
80.00 80.00

70.00 70.00

60.00 60.00

50.00 50.00

40.00 40.00

30.00 30.00

20.00 20.00

10.00 10.00

0.00 0.00
0 180 360 540 720 900 1080 1260 1440 1620
Time (min)
Hyd No. 62
2
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 5 / 2017

Hyd. No. 63
POST-DEVELOPMENT
Hydrograph type = Reservoir Peak discharge = 0.850 cfs
Storm frequency = 1 yrs Time to peak = 1185 min
Time interval = 3 min Hyd. volume = 52,049 cuft
Inflow hyd. No. = 44 - TOTAL CLEAN WATER SYSTEM
Max. Elevation = 559.66 ft
Reservoir name = STORMWATER DETENTION Max.
PONDStorage = 132,786 cuft

Storage Indication method used.

POST-DEVELOPMENT
Q (cfs) Q (cfs)
Hyd. No. 63 -- 1 Year
70.00 70.00

60.00 60.00

50.00 50.00

40.00 40.00

30.00 30.00

20.00 20.00

10.00 10.00

0.00 0.00
0 540 1080 1620 2160 2700 3240 3780 4320 4860 5400 5940
Time (min)
Hyd No. 63 Hyd No. 44 Total storage used = 132,786 cuft
3
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 5 / 2017

Hyd. No. 62
PRE-DEVELOPMENT
Hydrograph type = SCS Runoff Peak discharge = 115.72 cfs
Storm frequency = 2 yrs Time to peak = 717 min
Time interval = 3 min Hyd. volume = 264,147 cuft
Drainage area = 61.500 ac Curve number = 79*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 6.00 min
Total precip. = 3.10 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484

* Composite (Area/CN) = [(60.200 x 79) + (1.300 x 98)] / 61.500

PRE-DEVELOPMENT
Q (cfs) Q (cfs)
Hyd. No. 62 -- 2 Year
120.00 120.00

100.00 100.00

80.00 80.00

60.00 60.00

40.00 40.00

20.00 20.00

0.00 0.00
0 180 360 540 720 900 1080 1260 1440 1620
Time (min)
Hyd No. 62
4
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 5 / 2017

Hyd. No. 63
POST-DEVELOPMENT
Hydrograph type = Reservoir Peak discharge = 1.564 cfs
Storm frequency = 2 yrs Time to peak = 1041 min
Time interval = 3 min Hyd. volume = 106,928 cuft
Inflow hyd. No. = 44 - TOTAL CLEAN WATER SYSTEM
Max. Elevation = 560.13 ft
Reservoir name = STORMWATER DETENTION Max.
PONDStorage = 160,976 cuft

Storage Indication method used.

POST-DEVELOPMENT
Q (cfs) Q (cfs)
Hyd. No. 63 -- 2 Year
90.00 90.00

80.00 80.00

70.00 70.00

60.00 60.00

50.00 50.00

40.00 40.00

30.00 30.00

20.00 20.00

10.00 10.00

0.00 0.00
0 540 1080 1620 2160 2700 3240 3780 4320 4860 5400
Time (min)
Hyd No. 63 Hyd No. 44 Total storage used = 160,976 cuft
5
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 5 / 2017

Hyd. No. 62
PRE-DEVELOPMENT
Hydrograph type = SCS Runoff Peak discharge = 197.13 cfs
Storm frequency = 5 yrs Time to peak = 717 min
Time interval = 3 min Hyd. volume = 445,171 cuft
Drainage area = 61.500 ac Curve number = 79*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 6.00 min
Total precip. = 4.20 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484

* Composite (Area/CN) = [(60.200 x 79) + (1.300 x 98)] / 61.500

PRE-DEVELOPMENT
Q (cfs) Q (cfs)
Hyd. No. 62 -- 5 Year
210.00 210.00

180.00 180.00

150.00 150.00

120.00 120.00

90.00 90.00

60.00 60.00

30.00 30.00

0.00 0.00
0 180 360 540 720 900 1080 1260 1440 1620
Time (min)
Hyd No. 62
6
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 5 / 2017

Hyd. No. 63
POST-DEVELOPMENT
Hydrograph type = Reservoir Peak discharge = 2.544 cfs
Storm frequency = 5 yrs Time to peak = 972 min
Time interval = 3 min Hyd. volume = 211,911 cuft
Inflow hyd. No. = 44 - TOTAL CLEAN WATER SYSTEM
Max. Elevation = 561.26 ft
Reservoir name = STORMWATER DETENTION Max.
PONDStorage = 234,627 cuft

Storage Indication method used.

POST-DEVELOPMENT
Q (cfs) Q (cfs)
Hyd. No. 63 -- 5 Year
140.00 140.00

120.00 120.00

100.00 100.00

80.00 80.00

60.00 60.00

40.00 40.00

20.00 20.00

0.00 0.00
0 540 1080 1620 2160 2700 3240 3780 4320 4860 5400
Time (min)
Hyd No. 63 Hyd No. 44 Total storage used = 234,627 cuft
7
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 5 / 2017

Hyd. No. 62
PRE-DEVELOPMENT
Hydrograph type = SCS Runoff Peak discharge = 255.37 cfs
Storm frequency = 10 yrs Time to peak = 717 min
Time interval = 3 min Hyd. volume = 577,365 cuft
Drainage area = 61.500 ac Curve number = 79*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 6.00 min
Total precip. = 4.95 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484

* Composite (Area/CN) = [(60.200 x 79) + (1.300 x 98)] / 61.500

PRE-DEVELOPMENT
Q (cfs) Q (cfs)
Hyd. No. 62 -- 10 Year
280.00 280.00

240.00 240.00

200.00 200.00

160.00 160.00

120.00 120.00

80.00 80.00

40.00 40.00

0.00 0.00
0 180 360 540 720 900 1080 1260 1440 1620
Time (min)
Hyd No. 62
8
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 5 / 2017

Hyd. No. 63
POST-DEVELOPMENT
Hydrograph type = Reservoir Peak discharge = 3.646 cfs
Storm frequency = 10 yrs Time to peak = 930 min
Time interval = 3 min Hyd. volume = 285,534 cuft
Inflow hyd. No. = 44 - TOTAL CLEAN WATER SYSTEM
Max. Elevation = 562.05 ft
Reservoir name = STORMWATER DETENTION Max.
PONDStorage = 287,890 cuft

Storage Indication method used.

POST-DEVELOPMENT
Q (cfs) Q (cfs)
Hyd. No. 63 -- 10 Year
180.00 180.00

160.00 160.00

140.00 140.00

120.00 120.00

100.00 100.00

80.00 80.00

60.00 60.00

40.00 40.00

20.00 20.00

0.00 0.00
0 540 1080 1620 2160 2700 3240 3780 4320 4860
Time (min)
Hyd No. 63 Hyd No. 44 Total storage used = 287,890 cuft
9
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 5 / 2017

Hyd. No. 62
PRE-DEVELOPMENT
Hydrograph type = SCS Runoff Peak discharge = 314.79 cfs
Storm frequency = 25 yrs Time to peak = 717 min
Time interval = 3 min Hyd. volume = 714,308 cuft
Drainage area = 61.500 ac Curve number = 79*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 6.00 min
Total precip. = 5.70 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484

* Composite (Area/CN) = [(60.200 x 79) + (1.300 x 98)] / 61.500

PRE-DEVELOPMENT
Q (cfs) Q (cfs)
Hyd. No. 62 -- 25 Year
320.00 320.00

280.00 280.00

240.00 240.00

200.00 200.00

160.00 160.00

120.00 120.00

80.00 80.00

40.00 40.00

0.00 0.00
0 180 360 540 720 900 1080 1260 1440 1620
Time (min)
Hyd No. 62
10
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 5 / 2017

Hyd. No. 63
POST-DEVELOPMENT
Hydrograph type = Reservoir Peak discharge = 10.72 cfs
Storm frequency = 25 yrs Time to peak = 777 min
Time interval = 3 min Hyd. volume = 360,271 cuft
Inflow hyd. No. = 44 - TOTAL CLEAN WATER SYSTEM
Max. Elevation = 562.32 ft
Reservoir name = STORMWATER DETENTION Max.
PONDStorage = 307,140 cuft

Storage Indication method used.

POST-DEVELOPMENT
Q (cfs) Q (cfs)
Hyd. No. 63 -- 25 Year
210.00 210.00

180.00 180.00

150.00 150.00

120.00 120.00

90.00 90.00

60.00 60.00

30.00 30.00

0.00 0.00
0 360 720 1080 1440 1800 2160 2520 2880 3240 3600
Time (min)
Hyd No. 63 Hyd No. 44 Total storage used = 307,140 cuft
11
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 5 / 2017

Hyd. No. 62
PRE-DEVELOPMENT
Hydrograph type = SCS Runoff Peak discharge = 386.96 cfs
Storm frequency = 50 yrs Time to peak = 717 min
Time interval = 3 min Hyd. volume = 883,183 cuft
Drainage area = 61.500 ac Curve number = 79*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 6.00 min
Total precip. = 6.60 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484

* Composite (Area/CN) = [(60.200 x 79) + (1.300 x 98)] / 61.500

PRE-DEVELOPMENT
Q (cfs) Q (cfs)
Hyd. No. 62 -- 50 Year
420.00 420.00

360.00 360.00

300.00 300.00

240.00 240.00

180.00 180.00

120.00 120.00

60.00 60.00

0.00 0.00
0 180 360 540 720 900 1080 1260 1440
Time (min)
Hyd No. 62
12
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 5 / 2017

Hyd. No. 63
POST-DEVELOPMENT
Hydrograph type = Reservoir Peak discharge = 28.11 cfs
Storm frequency = 50 yrs Time to peak = 738 min
Time interval = 3 min Hyd. volume = 450,967 cuft
Inflow hyd. No. = 44 - TOTAL CLEAN WATER SYSTEM
Max. Elevation = 562.70 ft
Reservoir name = STORMWATER DETENTION Max.
PONDStorage = 334,479 cuft

Storage Indication method used.

POST-DEVELOPMENT
Q (cfs) Q (cfs)
Hyd. No. 63 -- 50 Year
240.00 240.00

210.00 210.00

180.00 180.00

150.00 150.00

120.00 120.00

90.00 90.00

60.00 60.00

30.00 30.00

0.00 0.00
0 360 720 1080 1440 1800 2160 2520 2880 3240
Time (min)
Hyd No. 63 Hyd No. 44 Total storage used = 334,479 cuft
13
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 5 / 2017

Hyd. No. 62
PRE-DEVELOPMENT
Hydrograph type = SCS Runoff Peak discharge = 419.20 cfs
Storm frequency = 100 yrs Time to peak = 717 min
Time interval = 3 min Hyd. volume = 959,472 cuft
Drainage area = 61.500 ac Curve number = 79*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 6.00 min
Total precip. = 7.00 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484

* Composite (Area/CN) = [(60.200 x 79) + (1.300 x 98)] / 61.500

PRE-DEVELOPMENT
Q (cfs) Q (cfs)
Hyd. No. 62 -- 100 Year
420.00 420.00

360.00 360.00

300.00 300.00

240.00 240.00

180.00 180.00

120.00 120.00

60.00 60.00

0.00 0.00
0 180 360 540 720 900 1080 1260 1440
Time (min)
Hyd No. 62
14
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 5 / 2017

Hyd. No. 63
POST-DEVELOPMENT
Hydrograph type = Reservoir Peak discharge = 41.07 cfs
Storm frequency = 100 yrs Time to peak = 729 min
Time interval = 3 min Hyd. volume = 491,549 cuft
Inflow hyd. No. = 44 - TOTAL CLEAN WATER SYSTEM
Max. Elevation = 562.94 ft
Reservoir name = STORMWATER DETENTION Max.
PONDStorage = 350,781 cuft

Storage Indication method used.

POST-DEVELOPMENT
Q (cfs) Q (cfs)
Hyd. No. 63 -- 100 Year
280.00 280.00

240.00 240.00

200.00 200.00

160.00 160.00

120.00 120.00

80.00 80.00

40.00 40.00

0.00 0.00
0 360 720 1080 1440 1800 2160 2520 2880 3240
Time (min)
Hyd No. 63 Hyd No. 44 Total storage used = 350,781 cuft