Project 11

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

Project :

Location :

Subject :

To :

I. Third Floor

- Wiring Installation of Home Run for Lighting @ Building A & B


- Wiring & Splicing for Lighting
- Wiring Installation for Power Outlet Home run @Building A & B
- Installation Wiring of Home run ACU

II. Fourth Floor

- Installation Piping & Wiring for Lighting


- Installation Piping & Wiring for power Outlet
- Installation piping for smoke detector
- Installation piping for speaker
- Installation piping for fire alarm
- Installation of cable tray 15 pcs
- Installation of auxiliary pull box 4 pcs
- Installation Wiring Home run for Lighting Building A& B
- Installation Wiring home run for Power Outlet Building A&B
- Wiring only Power Outlet @ Building B Lighting & C.O
- Wire splicing Lighting & Power Outlet

III. Fifth Floor

- Installation Piping & Junction Box for Lighting


- Piping Installation for Lighting & Utility box Switches for Lighting
- Piping Installation & Utility box for Power Outlet