SKY RESIDENCE PROJECT

CERTIFICATE OF PROJECT COMPLETION/REQUEST FOR ACCEPTANCE AND


TURNOVER

We certify that we have completed the (Name of Contract Package) of the Sky Residence
Project inclusive of all change orders and made good all the punch lists in accordance with
the Plans and Specifications prepared BY ASYA PARTNERS & (Design Engineer) and the
Construction Agreement. We therefore request the Acceptance and Turnover of the Project.
We have submitted the following:

1. Signed and Sealed As-built Drawings


2. Test Results – if required/applicable
3. Warranty Certificates – if required/applicable
4. Operation and Maintenance Manual (1 paper copy & electronic file) – if
required/applicable
5. Treasure’s Affidavit that all labor, materials, other purchases, rentals, taxes, and other
obligations of the Contractor relative to the construction of the project have been fully paid
(Original Copy)
6. All Keys (with duplicates and tags) – if applicable
7.

(Contractor)

(Name and Signature/Date)

President/Owner

--------------------------------------------------------------------------------------------------------------------------

RECOMMEND PROJECT ACCEPTANCE AND TURNOVER

BELARMINO Y. VIRAY/Date BERNARD H. VIRAY/Date


Managing Partner BYVPC Project Manager BYVPC

(Name & Signature/Date) LEO SIMBAJON/Date


ASYA DESIGN PARTNER Building Administrator
---------------------------------------------------------------------------------------------------------------------------
PROJECT ACCEPT AND TURNOVER ACKNOWLEDGED
MCY DEVELOPMENT CORPORATION

RODERICK Y. YU/Date