Safe Plan of Action RAMSU ENTERPRISE

SPA NO: RB/CL/SPA- 4| Rev. # 1 21/6/19

Project No. : 44AC6615


Location:WFI,stability,warehouse

Activity/Task :Fixing of light fixure on slab or wall

Date:20/06/2019

Steps of Hazard / Reaction


Safe Plan Resources
Activity/Task to Change
 Area clearance must be must be obtaining before commencement
of task when performed in existing structures or cable trays.
 Only safety inducted and medically fit workforce shall be deployed
for work and the medical certificates shall be produced to Jacobs.
 Task specific trained workforce shall be appointed and training
 Unauthorized area shall be conducting periodically. (At least once in a week)  Training session
 Untrained workforce  All of tools and equipment shall be inspected and same should be  Work permits
Arrangement of tools
free from defects. Ensure the provision of monthly Jacobs Color  Clear clearance
and equipment and  Defective tools and
 Tools and equipment
deploying workforce equipment coded stickers.
 PPEs
 All are must be equipped with mandatory PPEs i.e. helmet,
goggles, jacket, hand gloves and safety shoes.
 Ensure the permit is raised only with appropriate LOTO
procedures being followed.

 Proper manual handling techniques shall be followed.


 Use cut resisted hand gloves during handling of material.  PPEs
Shifting of light by
 Slip, trip & fall.  Only trained workforce shall be deployed for work.  Training session
manual
 Cables or other work related materials should stack at adequate
location so that it doesn’t hinder any emergency equipment.
 Area of work shall be barricade with Caution / Warning Signage.
Fixing of light at slab(9  Proper and safe working platform with access shall be providing.
meter,4 meter )  Power tool must be inspected and tagged before use.
 Fall hazard  Power tools
 Power cable must be free from joints or damage and same shall be
 Electrocutions  ELCB
connected through 30 mA rated ELCB.
 Cut injury  PPEs
 Cut resisted hand gloves shall be use during handling of cable
tray.
Page 1
Safe Plan of Action RAMSU ENTERPRISE
 Night Work allow by providing a Adequate lighting
 Cable laying activities or cable tray installation activities shall not
be carried out in height during rainy seasons/wet climatic condition.
 Life line, scaffoldings, mobile elevated working platforms shall be
used wherever required under the concurrence of Jacobs.
 Fixing of light in highbay warehouse area. work should be
performed with fully supervision.
 Work permit with approved SPA should obtain before starting of
scaffolding work.
 Hazards, risk and their control measure associated with scaffolding
erection work, should be explain to concern workforce in TBT before
starting of work.
 Scaffold erection shall be done under supervision of site supervisor /
engineer.
 Fall of person and  Work permit &
 Scaffold material shall be handle safely
material approved SPA
 Full body safety harness with double lanyard shock absorber should
 Scaffold pipe may hit  Trainings
wear during working at height.
Scaffold erecting & to adjacent person  FBSH
 Fully decked platform with toe guard to be provided, mid rail, top rail
dismantling (If required) while erecting or  PPEs
for all working platforms, Ladder to be provided for all working
dismantling.  Trained workforce
platforms.
 Collapse of scaffold  Site engineer /
 Base plate, mud sills should provide & adequate support of scaffold
during erecting supervisor
to be ensured by concern site supervisor to avoid scaffold collapse.
 Should be provide base plate and sole plate and scaffold should
erect at well compacted area same shall be ensure by site supervisor
/ engineer.
 No other work will be carryout on scaffold until the completion.
 After completion of erection, inspection shall be carrying out and
green tag will be provided.
 Manual unrolling of cable shall be performed in a slow and study
manner
 Any return back movement due to slipping of cable or tension shall
be immediately stopped and such provisions shall be made.
 Trip & Fall  PPEs
Working on scaffold or  Personnel shall be suitably instructed in cable pulling techniques
 Entrapment  Scaffold & ladder
fixing a light including appropriate manual handling techniques.
 Collapse of scaffold  Training session
 Assign sufficient personnel for manual unrolling of cable
 Proper hand protection and excess caution during the cable pulling
/ laying
 Height work trained workforce shall be engaged and all are must

Page 2
Safe Plan of Action RAMSU ENTERPRISE
be equipped with appropriate PPEs i.e. Helmet with chain strip,
goggles, hand gloves, jacket, safety shoes and fullbody safety
harness with twin lanyard.
 Proper anchoring point and safe access shall be provided and
same shall be ensured by site supervisor / engineer before
deploying workforce.
 If required, ladder shall be placed for access and same must be
secured.
 Scaffold must be inspected, ensure the stability and green tagged.
 Be aware of existing steam line, utility lines or any hot object. (if
possible isolate them)
 Barricade the area beneath of height work with Caution / Warning
signage.
 Work shall be carried out in presence of concern engineer /
supervisor for close monitoring.
 Ensure hundred percent tying off of full body safety Harness to a
strong member except existing utility lines
 Good housekeeping shall be maintained at work place.
 Access shall be free from obstruction.
 Only insulated tools shall be use.
 Avoid working on live electrical.
 Hit to personal  Cut resisted hand gloves should use while handling of sharp
 Insulated tools
Cable termination  Slip & trip objects / tools.
 PPEs
 Electrocution  Use appropriate PPEs.
 Taking a Shutdown during Cable Termination working period.

 All cable drums shall be stored provided with stoppers and secured
in a safe manner
 Ensure the drums are not blocked any movement
 All vehicles / equipment shall be parked at identified place.
 Storing of Materials  PPEs
 Unrolled cables shall be secure and keep away from the personnel
housekeeping  Blockage of Traffic  Site supervisor
/ Vehicle movement area.
 Tripping Hazards  Trainings & TBT

Page 3
Safe Plan of Action RAMSU ENTERPRISE

Signatures of Persons Involved in Development of SPA

Name

Sign

Date

Prepared by
(Supervisor) Checked by (Lead) Lead Engineer
Safety
Reviewed by Safety RCM
Engineer
Execution Team Execution

Contractor: - RAMSU ENTERPRISES Consultant (Jacobs)

The signature of the supervisor confirms the completion of the hazard assessment and Safe Plan of Action by the crew.
Supervisor’s Signature: Date

Instructions: 1. Write name of job or task in space provided. 2. Conduct walk-through survey of work area. 3. Write the steps of the task in a safe sequence.
4. List all possible hazards involved in each step and reaction to change. 5. In the Safe Plan column, state actions that will be taken to prevent the hazards or
injury from reaction to change. 6. In Resources column, list equipment, tools, etc. needed to do the job. 8. Ask each team member, who helped develop and will
use this SPA, to sign in spaces provided. 9. Review the SPA at the end of the task for improvements.
Page 4
Safe Plan of Action RAMSU ENTERPRISE
Work shall stop when conditions change, the job changes, or a deficiency in the plan is discovered, and the current SPA will be modified or a new SPA created.