Safe Plan of Action Ramsu Enterprise: Project No.: 44AC6615
Safe Plan of Action Ramsu Enterprise: Project No.: 44AC6615
Date:20/06/2019
Page 2
Safe Plan of Action RAMSU ENTERPRISE
be equipped with appropriate PPEs i.e. Helmet with chain strip,
goggles, hand gloves, jacket, safety shoes and fullbody safety
harness with twin lanyard.
Proper anchoring point and safe access shall be provided and
same shall be ensured by site supervisor / engineer before
deploying workforce.
If required, ladder shall be placed for access and same must be
secured.
Scaffold must be inspected, ensure the stability and green tagged.
Be aware of existing steam line, utility lines or any hot object. (if
possible isolate them)
Barricade the area beneath of height work with Caution / Warning
signage.
Work shall be carried out in presence of concern engineer /
supervisor for close monitoring.
Ensure hundred percent tying off of full body safety Harness to a
strong member except existing utility lines
Good housekeeping shall be maintained at work place.
Access shall be free from obstruction.
Only insulated tools shall be use.
Avoid working on live electrical.
Hit to personal Cut resisted hand gloves should use while handling of sharp
Insulated tools
Cable termination Slip & trip objects / tools.
PPEs
Electrocution Use appropriate PPEs.
Taking a Shutdown during Cable Termination working period.
All cable drums shall be stored provided with stoppers and secured
in a safe manner
Ensure the drums are not blocked any movement
All vehicles / equipment shall be parked at identified place.
Storing of Materials PPEs
Unrolled cables shall be secure and keep away from the personnel
housekeeping Blockage of Traffic Site supervisor
/ Vehicle movement area.
Tripping Hazards Trainings & TBT
Page 3
Safe Plan of Action RAMSU ENTERPRISE
Name
Sign
Date
Prepared by
(Supervisor) Checked by (Lead) Lead Engineer
Safety
Reviewed by Safety RCM
Engineer
Execution Team Execution
The signature of the supervisor confirms the completion of the hazard assessment and Safe Plan of Action by the crew.
Supervisor’s Signature: Date
Instructions: 1. Write name of job or task in space provided. 2. Conduct walk-through survey of work area. 3. Write the steps of the task in a safe sequence.
4. List all possible hazards involved in each step and reaction to change. 5. In the Safe Plan column, state actions that will be taken to prevent the hazards or
injury from reaction to change. 6. In Resources column, list equipment, tools, etc. needed to do the job. 8. Ask each team member, who helped develop and will
use this SPA, to sign in spaces provided. 9. Review the SPA at the end of the task for improvements.
Page 4
Safe Plan of Action RAMSU ENTERPRISE
Work shall stop when conditions change, the job changes, or a deficiency in the plan is discovered, and the current SPA will be modified or a new SPA created.