Walk Through Inspection Records

Reference # : HKGM-CNWCG-WTI-0000-19
Date of Inspection : 16-Jul-19 Time : 10:00 AM

LOCATION
DESCRIPTION RECOMMENDATION
Tower Grid Line Level
Coordinate to all trades and secure enclosure
Basement- Formworks installation/enclosure at Ret. wall permit prior to installation of formworks.
3 1-2
Ground and columns. Make sure to install concrete spacer blocks
prior to enclosure of any structure.

Joint/Confinement Rebars at SW/Col Ensure correct/complete installation of joint


3 1-11/ AE-AR Ground
intersection with Beams. reinforcements prior to enclosure of section.
Provide formworks cleanout window as
3 1-11/ AE-AR Ground Formworks cleanout window indicated on structural specifications part 3.1
of section 03300
Provide dedicated rebar fabrication equipment
for each tower to ensure sufficient supply for
1,2,3 ALL ALL Lacking equipment for rebar fabrication
rebar installers.(we recommend at least 1
cutter and 2 benders per tower)

2,3 1-11/N-AR Basement Completed Pile Caps and Ground Beams Submit request for inspection for completed items.

Attendees
Name Company/Position Signature
Engr. Marco Antonio Andino
Engr. Ryan Echevaria
Engr. Pepito Santos
Engr. Teddy Racaza

Prepared by: Noted by:

Engr. Marco Antonio Andino-HKGM Civil Engineer Mr. Loy Tan - HKGM Project Director
Walk Through Inspection Records

Reference # : HKGM-CNWCG-WTI-0000-19
Date of Inspection : 16-Jul-19 Time : 10:00 AM

LOCATION
DESCRIPTION RECOMMENDATION
Tower Grid Line Level
Coordinate to all trades and secure enclosure
Basement- Formworks installation/enclosure at Ret. wall permit prior to installation of formworks.
3 1-2
Ground and columns. Make sure to install concrete spacer blocks
prior to enclosure of any structure.

Joint/Confinement Rebars at SW/Col Ensure correct/complete installation of joint


3 1-11/ AE-AR Ground
intersection with Beams. reinforcements prior to enclosure of section.
Provide formworks cleanout window as
3 1-11/ AE-AR Ground Formworks cleanout window indicated on structural specifications part 3.1
of section 03300
Provide dedicated rebar fabrication equipment
for each tower to ensure sufficient supply for
1,2,3 ALL ALL Lacking equipment for rebar fabrication
rebar installers.(we recommend at least 1
cutter and 2 benders per tower)

2,3 1-11/N-AR Basement Completed Pile Caps and Ground Beams Submit request for inspection for completed items.

Attendees
Name Company/Position Signature
Engr. Marco Antonio Andino
Engr. Ryan Echevaria
Engr. Pepito Santos
Engr. Teddy Racaza

Prepared by: Noted by:

Engr. Marco Antonio Andino-HKGM Civil Engineer Mr. Loy Tan - HKGM Project Director