Detail Measurement.
NAME OF ROAD :-Peti to Ghumarra
LENGTH OF ROAD:- 3.210 K.M.
Package No. - CG 15-118
SOR Chainage
S.N. DISCRIPTION OF ITEMS Nos. L(M) B(M) D(M) QTY. UNIT Rate Amount
No. From - To
Page 1 of 86
SOR Chainage
S.N. DISCRIPTION OF ITEMS Nos. L(M) B(M) D(M) QTY. UNIT Rate Amount
No. From - To
0 450 1 450 2.95 1327.500
900 450 900 1 450 2.85 1282.500
1100 1300 1 200 3.05 610.000
1400 1650 1 250 2.95 737.500
3957.500 Sqm 13 51448
Page 2 of 86
SOR Chainage
S.N. DISCRIPTION OF ITEMS Nos. L(M) B(M) D(M) QTY. UNIT Rate Amount
No. From - To
5 9.14 Providing and fixing of typical PMGSY informatory sign
(B) board with Logo as per MORD specifications and
drawing. Three MS Plates of 1.6 mm thick, top and
middle plate duly welded with MS flat iron 25mm x 5m
size on back on edges. The lower plate will be welded
with MS angle iron frame of 25mm x 25mm x 5mm. The
angle iron frame of the lower most plate and flat iron
frame of middle plate will be welded to 2 nos. 75mm x
75 mm of 12 SWG sheet tubes posts duly embedded in
cement concrete M-15 grade blocks of 450mm x
450mm x 600mm, 600mm below ground level. The top
most diamond plate will be welded to middle plate by
47mm x 47mm of 12 SWG steel plate tube. All M.S.
will be stove enameled on both sides. Lettering and
printing arrows, border etc. will be painted with ready
mixed synthetic enamel paint of superior quality in
required shade and colour. All sections of framed posts
and steel tube will be painted with primer and two coats
of epoxy paint as per drawing Clause 1701 and
Annexure 1700.1
Page 3 of 86
SOR Chainage
S.N. DISCRIPTION OF ITEMS Nos. L(M) B(M) D(M) QTY. UNIT Rate Amount
No. From - To
7 3.5(i) Excavation in cutting in soil with lead up to 50m excavation for
roadway in soil for carrying of cut earth to embankment site
with all lift and lead uo to 50m as per technical specification As per Volume sheet.
clause 302.3
1010.875
Total 1010.875 Cum 64 64696
Page 4 of 86
SOR Chainage
S.N. DISCRIPTION OF ITEMS Nos. L(M) B(M) D(M) QTY. UNIT Rate Amount
No. From - To
11 7.1( I Earthwork in excavation for structures as per Drawing
) and Technical Specifications Clause 305.1 including
(i) setting out, construction of shoring and bracing,
removal of stumps and other deleterious material and
disposal up to a lead of 50m dressing of sides and
bottom and backfilling in trenches with excavated
suitable material ordinary soil up to 3m depth.
(1.3+0.4)/2
Wall Bed Level to top Level 2 6.15 0.85 2.65 27.706
(1.3+0.9)/2
Deduct Pipe Portion -2 1.1 0.785 1.513 -2.613
25.093 Cum. 3434 86169
Page 5 of 86
SOR Chainage
S.N. DISCRIPTION OF ITEMS Nos. L(M) B(M) D(M) QTY. UNIT Rate Amount
No. From - To
14 7.3(ii) Bedding for Pipe
Type B (First Class) Bedding
Laying (First Class) bedding on well compacted sand,
moorum or approved
At Chainage granular dia
36m (1x1000mm material
HPC)as per Clause (4.9+4.8)/2
1105 (ii)
Pipe Portion 1 4.85 1.53 0.15 1.113
Deduction -2 0.6 1.53 0.15 -0.275
Total 0.838 Cum 558 467
Page 6 of 86
1st Running Bill
NAME OF ROAD :-Peti to Ghumrra
LENGTH OF ROAD:- 3.210 K.M.
Package No. - CG 15-118
7
s.N SOR Ref. MB Up to Date Since Previous Since Last
Particurs of item Unit Rate Remark
o. NO. Pg.No.
Qty Amount Qty Amount Qty Amount
1 2 3 4 5 6 7 8 9 10 11 12 13
4 3.2 Loosening, Levelling and Compacting original ground
supporting embankment to facilitate placement of first
layer of embankment,scarified to a depth of 150 mm
mixed with water at OMC and then compacted by rolling
so as to achieve minimum dry density as given in Tables
300.1 and 300.2 for embankment construction as per
Technical Specification Clause 301.4.1.
8
s.N SOR Ref. MB Up to Date Since Previous Since Last
Particurs of item Unit Rate Remark
o. NO. Pg.No.
Qty Amount Qty Amount Qty Amount
1 2 3 4 5 6 7 8 9 10 11 12 13
6 9.14 Providing and fixing of typical PMGSY informatory
(B) sign board with Logo as per MORD specifications
and drawing. Three MS Plates of 1.6 mm thick, top
and middle plate duly welded with MS flat iron
25mm x 5m size on back on edges. The lower
plate will be welded with MS angle iron frame of
25mm x 25mm x 5mm. The angle iron frame of the
lower most plate and flat iron frame of middle plate
will be welded to 2 nos. 75mm x 75 mm of 12 SWG
sheet tubes posts duly embedded in cement
concrete M-15 grade blocks of 450mm x 450mm x
600mm, 600mm below ground level. The top most
diamond plate will be welded to middle plate by
47mm x 47mm of 12 SWG steel plate tube. All
M.S. will be stove enameled on both sides.
Lettering and printing arrows, border etc. will be
painted with ready mixed synthetic enamel paint of
superior quality in required shade and colour. All
sections of framed posts and steel tube will be
painted with primer and two coats of epoxy paint
as per drawing Clause 1701 and Annexure 1700.1
9
s.N SOR Ref. MB Up to Date Since Previous Since Last
Particurs of item Unit Rate Remark
o. NO. Pg.No.
Qty Amount Qty Amount Qty Amount
1 2 3 4 5 6 7 8 9 10 11 12 13
8 3.5(i) Excavation in cutting in soil with lead up to 50m
excavation for roadway in soil for carrying of cut earth to
embankment site with all lift and lead uo to 50m as per
technical specification clause 302.3 Cum 64.00 1010.875 64696 1010.875 64696
9 3.3(i) Construction of embankment with approved material
disposited at site from roadway cutting and excavation
from drain and foundation of other structures graded and
compacted to meet requirement of tables 300.1 and
300.2 as per Technical Specification Clause 301.5.
10
s.N SOR Ref. MB Up to Date Since Previous Since Last
Particurs of item Unit Rate Remark
o. NO. Pg.No.
Qty Amount Qty Amount Qty Amount
1 2 3 4 5 6 7 8 9 10 11 12 13
15 7.6 Providing & laying I. S. marked or D.G.S. & D.
( C ) Inspected RCC pipes of NP 3 standard (IS-458-
1971) for culverts I/c loading, un loading, carting,
all handling, filling the joints in cement mortar 1:2
etc. complete as per Drawing & Specification. Rmt 4559.00 7.500 34193 7.500 34193
16 7.23 Backfilling behind abutment, wing wall and return
(i) wall complete as per drawings and technical
specification Clause 1204.3.8. Granuler materials.
Cum 569 10.490 5969 10.490 5969
Total 938387 0 938387
Add Above SOR 23.13% (+) 217049 0 217049
Grand Total 1155436 0 1155436
11
2nd RA Bill .
Detail Measurement.
NAME OF ROAD :-Peti to Ghumarra
LENGTH OF ROAD:- 3.210 K.M.
Package No. - CG 15-118
SOR Chainage
S.N. DISCRIPTION OF ITEMS Nos. L(M) B(M) D(M) QTY. UNIT Rate Amount
No. From - To
Page 12 of 86
SOR Chainage
S.N. DISCRIPTION OF ITEMS Nos. L(M) B(M) D(M) QTY. UNIT Rate Amount
No. From - To
Deduction for Issue the material (Oversize metal) for
scarifiying of Existing WBM (35%) 895 0.1 89.500
-31.325 Cum 200 -6265
Page 13 of 86
SOR Chainage
S.N. DISCRIPTION OF ITEMS Nos. L(M) B(M) D(M) QTY. UNIT Rate Amount
No. From - To
6 7.1( I Earthwork in excavation for structures as per Drawing
) and Technical Specifications Clause 305.1 including
(i) setting out, construction of shoring and bracing,
removal of stumps and other deleterious material and
disposal up to a lead of 50m dressing of sides and
bottom and backfilling in trenches with excavated
suitable material ordinary soil up to 3m depth.
Page 14 of 86
SOR Chainage
S.N. DISCRIPTION OF ITEMS Nos. L(M) B(M) D(M) QTY. UNIT Rate Amount
No. From - To
Face wall PCC 2 3.30 1.4 0.15 1.386
Joint in Pipe Portion 2 1.05 0.6 0.15 0.189
6.300 Cum 3247 20456
Up to GL
At Chainage 580m (1x600mm dia HPC)
Face Wall 2 3 1.1 0.6 3.960
At Chainage 980m (1x600mm dia HPC)
Face Wall 2 3 1.1 0.6 3.960
At Chainage 1225m (1x600mm dia HPC)
Face Wall 2 3 1.1 0.6 3.960
At Chainage 1390m (1x600mm dia HPC)
Face Wall 2 3 1.1 0.6 3.960
Above GL
At Chainage 580m (1x600mm dia HPC)
Face Wall 2 3 0.7 1.78 7.476
Deduct Pipe Portion -2 0.875 0.785 0.563 -0.773
In Coller Portion 2 1.05 0.300 0.900 0.567
Deduct Pipe Portion -2 0.3 0.785 0.563 -0.265
At Chainage 980m (1x600mm dia HPC)
Face Wall 2 3 0.7 1.8 7.560
Deduct Pipe Portion -2 0.875 0.785 0.563 -0.773
In Coller Portion 2 1.05 0.300 0.900 0.567
Deduct Pipe Portion -2 0.3 0.785 0.563 -0.265
At Chainage 1225m (1x600mm dia HPC)
Face Wall 2 3 0.7 1.75 7.350
Deduct Pipe Portion -2 0.875 0.785 0.563 -0.773
In Coller Portion 2 1.05 0.300 0.900 0.567
Deduct Pipe Portion -2 0.3 0.785 0.563 -0.265
At Chainage 1390m (1x600mm dia HPC)
Page 15 of 86
SOR Chainage
S.N. DISCRIPTION OF ITEMS Nos. L(M) B(M) D(M) QTY. UNIT Rate Amount
No. From - To
Face Wall 2 3 0.7 1.75 7.350
Deduct Pipe Portion -2 0.875 0.785 0.563 -0.773
In Coller Portion 2 1.05 0.300 0.900 0.567
Deduct Pipe Portion -2 0.3 0.785 0.563 -0.265
43.693 Cum. 3434 150043
9 7.6 Providing & laying I. S. marked or D.G.S. & D.
( C ) Inspected RCC pipes of NP 3 standard (IS-458-1971)
for culverts I/c loading, un loading, carting, all handling,
filling the joints in cement mortar 1:2 etc. complete as
per Drawing & Specification.
600 mm dia HPC
At Chainage 580m (1x600mm dia HPC) 1 7.5 7.500
At Chainage 980m (1x600mm dia HPC) 1 7.5 7.500
At Chainage 1225m (1x600mm dia HPC) 1 7.5 7.500
At Chainage 1390m (1x600mm dia HPC) 1 7.5 7.500
Total 30.000 Rmt 2206 66180
Page 16 of 86
SOR Chainage
S.N. DISCRIPTION OF ITEMS Nos. L(M) B(M) D(M) QTY. UNIT Rate Amount
No. From - To
Beside Head Wall 2 2.25 0.45 2.055 4.161
At Chainage 1225m (1x600mm dia HPC)
upto G.L.
Inner Portion 2 0.2 1.05 0.6 0.252
Pipe Bottom level to Pipe top level 1 5.75 1.05 0.75 4.528
Deduct Pipe -1 5.75 0.785 0.5625 -2.539
Above GL
Above Pipe top level to road level 1 6.25 1.05 0.705 4.627
Beside Head Wall 2 2.25 0.45 2.055 4.161
At Chainage 1390m (1x600mm dia HPC)
upto G.L.
Inner Portion 2 0.2 1.05 0.6 0.252
Pipe Bottom level to Pipe top level 1 5.75 1.05 0.75 4.528
Deduct Pipe -1 5.75 0.785 0.5625 -2.539
Above GL
Above Pipe top level to road level 1 6.25 1.05 0.705 4.627
Beside Head Wall 2 2.25 0.45 2.055 4.161
Total 44.702 Cum 569 25435
Page 17 of 86
82214
Page 18 of 86
58213
Page 19 of 86
10328
Page 20 of 86
2nd Running Bill
NAME OF ROAD :-Peti to Ghumrra
LENGTH OF ROAD:- 3.210 K.M.
Package No. - CG 15-118
21
s.N SOR Ref. MB Up to Date Since Previous Since Last
Particurs of item Unit Rate Remark
o. NO. Pg.No.
Qty Amount Qty Amount Qty Amount
1 2 3 4 5 6 7 8 9 10 11 12 13
6 7.1( I) Earthwork in excavation for structures as per
(i) Drawing and Technical Specifications Clause 305.1
including setting out, construction of shoring and
bracing, removal of stumps and other deleterious
material and disposal up to a lead of 50m dressing
of sides and bottom and backfilling in trenches with
excavated suitable material ordinary soil up to 3m
depth.
Cum 160.00 131.116 20979 76.873 12300 54.243 8679
7 9.14 Providing and fixing of typical PMGSY informatory
(B) sign board with Logo as per MORD specifications
and drawing. Three MS Plates of 1.6 mm thick, top
and middle plate duly welded with MS flat iron
25mm x 5m size on back on edges. The lower
plate will be welded with MS angle iron frame of
25mm x 25mm x 5mm. The angle iron frame of the
lower most plate and flat iron frame of middle plate
will be welded to 2 nos. 75mm x 75 mm of 12 SWG
sheet tubes posts duly embedded in cement
concrete M-15 grade blocks of 450mm x 450mm x
600mm, 600mm below ground level. The top most
diamond plate will be welded to middle plate by
47mm x 47mm of 12 SWG steel plate tube. All
M.S. will be stove enameled on both sides.
Lettering and printing arrows, border etc. will be
painted with ready mixed synthetic enamel paint of
superior quality in required shade and colour. All
sections of framed posts and steel tube will be
painted with primer and two coats of epoxy paint
as per drawing Clause 1701 and Annexure 1700.1
22
s.N SOR Ref. MB Up to Date Since Previous Since Last
Particurs of item Unit Rate Remark
o. NO. Pg.No.
Qty Amount Qty Amount Qty Amount
1 2 3 4 5 6 7 8 9 10 11 12 13
8 9.15( Providing and fixing of typical PMGSY Citizen
a) Board as per MORD specifications and drawing.
Three MS Plates of 1.6 mm thick, top and middle
plate duly welded with MS flat iron 25mm x 5m size
on back on edges. The top most diamond plate
will be welded to middle plate by 47mm x 47mm of
12 SWG steel plate tube. All M.S. will be stove
enameled on both sides. Lettering and printing
arrows, border etc. will be painted with ready mixed
synthetic enamel paint of superior quality in
required shade and colour. All sections of framed
posts and steel tube will be painted with primer and
two coats of epoxy paint as per drawing Clause
1701 and Annexure 1700.1
23
s.N SOR Ref. MB Up to Date Since Previous Since Last
Particurs of item Unit Rate Remark
o. NO. Pg.No.
Qty Amount Qty Amount Qty Amount
1 2 3 4 5 6 7 8 9 10 11 12 13
14 7.18 Plain/reinforced cement concrete in substructure
(i) complete as per Drawings and Technical
Specification Clauses 802,804, 805, 806, 807,
1202 and 1204
P.C.C. grade M 15 nominal mix 1:2.5:5. Cum 3434.00 68.786 236212 25.093 86169 43.693 150043
15 7.3(ii) Bedding for Pipe
Type B (First Class) Bedding
Laying (First Class) bedding on well compacted
sand, moorum or approved granular material as
per Clause 1105 (ii) Cum 558.00 0.838 467 0.838 467 0.000 0
16 7.6 Providing & laying I. S. marked or D.G.S. & D.
Inspected RCC pipes of NP 3 standard (IS-458-
1971) for culverts I/c loading, un loading, carting,
all handling, filling the joints in cement mortar 1:2
etc. complete as per Drawing & Specification.
600mm Dia Rmt 2206.00 30.000 66180 30.000 66180
17 7.6 Providing & laying I. S. marked or D.G.S. & D.
Inspected RCC pipes of NP 3 standard (IS-458-
1971) for culverts I/c loading, un loading, carting,
all handling, filling the joints in cement mortar 1:2
etc. complete as per Drawing & Specification.
1000mm Dia Rmt 4559.00 7.500 34193 7.500 34193 0.000 0
18 7.23 Backfilling behind abutment, wing wall and return
(i) wall complete as per drawings and technical
specification Clause 1204.3.8. Granuler materials.
Cum 569 55.192 31404 10.490 5969 44.702 25435
Total 1566391 938387 628005
Add Above SOR 23.13% (+) 362306 217049 145257
Grand Total 1928698 1155436 773262
24
3rd RA Bill .
Detail Measurement.
NAME OF ROAD :-Peti to Ghumarra
LENGTH OF ROAD:- 3.210 K.M.
Package No. - CG 15-118
SOR Chainage
S.N. DISCRIPTION OF ITEMS Nos. L(M) B(M) D(M) QTY. UNIT Rate Amount
No. From - To
At Chainage 2200 2350 1 150.000 3.75 0.20 112.500 Cum 4470 502875
Wiheld 50% for Results of 28 days test. -251438
Gross Amount 297000
Above SOR 23.13% (+) 68696
Net Amount 365696
Page 25 of 86
3rd Running Bill
NAME OF ROAD :-Peti to Ghumrra
LENGTH OF ROAD:- 3.210 K.M.
Package No. - CG 15-118
26
s.N SOR Ref. MB Up to Date Since Previous Since Last
Particurs of item Unit Rate
o. NO. Pg.No.
Qty Amount Qty Amount Qty Amount
1 2 3 4 5 6 7 8 9 10 11 12
5 3.2 Loosening, Levelling and Compacting original ground
supporting embankment to facilitate placement of first
layer of embankment,scarified to a depth of 150 mm
mixed with water at OMC and then compacted by rolling
so as to achieve minimum dry density as given in Tables
300.1 and 300.2 for embankment construction as per
Technical Specification Clause 301.4.1.
27
s.N SOR Ref. MB Up to Date Since Previous Since Last
Particurs of item Unit Rate
o. NO. Pg.No.
Qty Amount Qty Amount Qty Amount
1 2 3 4 5 6 7 8 9 10 11 12
7 9.14 Providing and fixing of typical PMGSY informatory
(B) sign board with Logo as per MORD specifications
and drawing. Three MS Plates of 1.6 mm thick, top
and middle plate duly welded with MS flat iron
25mm x 5m size on back on edges. The lower
plate will be welded with MS angle iron frame of
25mm x 25mm x 5mm. The angle iron frame of the
lower most plate and flat iron frame of middle plate
will be welded to 2 nos. 75mm x 75 mm of 12 SWG
sheet tubes posts duly embedded in cement
concrete M-15 grade blocks of 450mm x 450mm x
600mm, 600mm below ground level. The top most
diamond plate will be welded to middle plate by
47mm x 47mm of 12 SWG steel plate tube. All
M.S. will be stove enameled on both sides.
Lettering and printing arrows, border etc. will be
painted with ready mixed synthetic enamel paint of
superior quality in required shade and colour. All
sections of framed posts and steel tube will be
painted with primer and two coats of epoxy paint
as per drawing Clause 1701 and Annexure 1700.1
28
s.N SOR Ref. MB Up to Date Since Previous Since Last
Particurs of item Unit Rate
o. NO. Pg.No.
Qty Amount Qty Amount Qty Amount
1 2 3 4 5 6 7 8 9 10 11 12
9 3.5(i) Excavation in cutting in soil with lead up to 50m
excavation for roadway in soil for carrying of cut earth to
embankment site with all lift and lead uo to 50m as per
technical specification clause 302.3 Cum 64.00 1010.875 64696 1010.875 64696 0.000 0
10 3.3(i) Construction of embankment with approved material
disposited at site from roadway cutting and excavation
from drain and foundation of other structures graded and
compacted to meet requirement of tables 300.1 and
300.2 as per Technical Specification Clause 301.5.
29
s.N SOR Ref. MB Up to Date Since Previous Since Last
Particurs of item Unit Rate
o. NO. Pg.No.
Qty Amount Qty Amount Qty Amount
1 2 3 4 5 6 7 8 9 10 11 12
16 7.6 Providing & laying I. S. marked or D.G.S. & D.
Inspected RCC pipes of NP 3 standard (IS-458-
1971) for culverts I/c loading, un loading, carting,
all handling, filling the joints in cement mortar 1:2
etc. complete as per Drawing & Specification.
600mm Dia Rmt 2206.00 30.000 66180 30.000 66180 0.000 0
17 7.6 Providing & laying I. S. marked or D.G.S. & D.
Inspected RCC pipes of NP 3 standard (IS-458-
1971) for culverts I/c loading, un loading, carting,
all handling, filling the joints in cement mortar 1:2
etc. complete as per Drawing & Specification.
1000mm Dia Rmt 4559.00 7.500 34193 7.500 34193 0.000 0
18 7.23 Backfilling behind abutment, wing wall and return
(i) wall complete as per drawings and technical
specification Clause 1204.3.8. Granuler materials.
Cum 569 55.192 31404 55.192 31404 0.000 0
19 6.4 Construction of un-reinforced, dowel jointed at
expansion and construction joint only, plain cement
concrete pavement, thickness as per design, over a
prepared sub base, with 43 grade cement or any other
type as per Clause 1501.2.2 M30 (Grade), coarse and
fine aggregates conforming to IS:383, maximum size of
coarse aggregate not exceeding 25 mm, mixed in a
concrete mixer of not less than 0.2 cum capacity and
appropriate weigh batcher using approved mix design,
laid in approved fixed side formwork (steel channel,
laying and fixing of 125 micron thick polythene film,
wedges, steel plates including levelling the formwork as
per drawing), spreading the concrete with shovels, rakes,
compacted using needle, screed and plate vibrators and
finished in continuous operation including provision of
contraction and expansion, construction joints, applying
debonding strips, primer, sealant, dowel bars, near
approaches to bridge/culvert and construction joints,
admixtures as approved, curing of concrete slabs for 14-
days,using curing compound (where specified) and water
finishing to lines and grade as per drawing and
Technical Specification Clause 1501
30
s.N SOR Ref. MB Up to Date Since Previous Since Last
Particurs of item Unit Rate
o. NO. Pg.No.
Qty Amount Qty Amount Qty Amount
1 2 3 4 5 6 7 8 9 10 11 12
Wiheld 50% for Results of 28 days test. -251438 -251438
20 4.1(a) Construction of Granular sub-base by providing
(iii) well graded material, spreading in uniform layers
with motor grader on prepared surface, mixing by
mix in place method with rotavator at OMC, and
compacting with smooth wheel roller to achieve the
desired density, complete as per Technical
Specification Clause 401. disintegrated rock i.e.
moorum. Cum 500.00 91.125 45563 91.125 45563
Total 1863391 1566391 297000
Add Above SOR 23.13% (+) 431002 362306 68696
Grand Total 2294393 1928698 365695
31
Remark
13
4682.662 0.000
32
Remark
13
33
Remark
13
34
Remark
13
35
Remark
13
36
Remark
13
37
4th RA Bill .
Detail Measurement.
NAME OF ROAD :-Peti to Ghumarra
LENGTH OF ROAD:- 3.210 K.M.
Package No. - CG 15-118
SOR Chainage
S.N. DISCRIPTION OF ITEMS Nos. L(M) B(M) D(M) QTY. UNIT Rate Amount
No. From - To
Page 38 of 86
SOR Chainage
S.N. DISCRIPTION OF ITEMS Nos. L(M) B(M) D(M) QTY. UNIT Rate Amount
No. From - To
3 7.1( I Earthwork in excavation for structures as per Drawing
) and Technical Specifications Clause 305.1 including
(i) setting out, construction of shoring and bracing,
removal of stumps and other deleterious material and
disposal up to a lead of 50m dressing of sides and
bottom and backfilling in trenches with excavated
suitable material ordinary soil up to 3m depth.
Page 39 of 86
5th RA Bill .
Detail Measurement.
NAME OF ROAD :-Peti to Ghumrra
Package No. - CG 15-118
SOR Chainage
S.N. DISCRIPTION OF ITEMS Nos. L(M) B(M) D(M) QTY. UNIT Rate Amount
No. From - To
Total
Gross Amount 251438
Above SOR 23.13% (+) 58157
Net Amount 309595
Page 40 of 86
Bill Abstract
5th Running Bill
NAME OF ROAD :-Peti to Ghumrra
Package No. - CG 15-118
Ref. Up to Date Since Previous Since Last
S.N SOR
Particurs of item MB Unit Rate Remark
o. NO. Qty Amount Qty Amount Qty Amount
Pg.No.
1 2 3 4 5 6 7 8 9 10 11 12 13
1 2.1 Setting Out
Setting Out work complete with construction of bench mark (Min 1 per km)
working benchmark (Min 4 per km) and near all bridges and cross-drainage
works made of bricks/stone masonary or concrete and reference pillars
made of precast concrete poles/concrete filled 100 mm dia A.C.pipe @ 100
m interval of as required on both sides of the formation width, marking on
central line, setting out curves and recording of central line levels and other
required levels and distances etc. including setting out of cross-drainage
structures & bridges with required reference pillars and marking etc. as
directed by Engineer-in-Charge.
The measurments,on which the entries in column 1 to 10 are based, were made by Shri...................................................
...................................................................On ..........................................................................(Date)...........................are
recorded at page ..............................of Measurment Book No...............................................................
Gross Amount
Above SOR 23.13% (+)
Net Amount
Amount
21550
Amount
1807503
26485
48035
11110
59145
1553669
1612815
15th RA Bill .
Detail Measurement.
NAME OF ROAD :-Peti to Ghumrra
Package No. - CG 15-118
SOR Chainage
S.N. DISCRIPTION OF ITEMS Nos. L(M) B(M) D(M) QTY. UNIT Rate Amount
No. From - To
1 2.3(A) Clearing and grubbing road land including uprooting
wild vegetation, grass,bushes, shrubs,saplings and
trees of girth up to 300mm, removal of stumps of such
trees cut earlier and disposal of unserviceable
materials and stacking of serviceable material to be
used or auctioned up to a lead of 1000 m including
removal and disposal of top organic soil not exceeding
150mm in thickness as per Technical Specification
Clause 201. By Mechanical mans in area of non
thormy jungle.
2500 2600 2 100 2.25 450.00
450.00 Sqm 2.6 1170
2 3.2 Loosening, Levelling and Compacting original ground
supporting embankment to facilitate placement of first
layer of embankment,scarified to a depth of 150 mm
mixed with water at OMC and then compacted by
rolling so as to achieve minimum dry density as given
in Tables 300.1 and 300.2 for embankment construction
as per Technical Specification Clause 301.4.1.
Avg. Avg.
2500 2600 2 100 2.5 0.15 75.00
Total 75.000 Cum 15 1125
CC Drain from
2460 2507 1 47.00 1 0.45 21.150
21.150 Cum 160 3384
SOR Chainage
S.N. DISCRIPTION OF ITEMS Nos. L(M) B(M) D(M) QTY. UNIT Rate Amount
No. From - To
8 7.18 Plain/reinforced cement concrete in substructure
(ii) complete as per Drawings and Technical Specification
Clauses 802,804, 805, 806, 807, 1202 and 1204
P.C.C. grade M 15 nominal mix 1:2.5:5.
92.593
0.0926 Mt 58242 5393
0 2550 2550
0 0
0 300 2 300
340 2000 2 1660
2000 2500 2 500
0 300 1 300
340 1000 1 660
1000 2000 1 1000
2000 2250 1 250
2400 2500 1 100
Total
Earthwork in excavation for structures as per Drawing
and Technical Specifications Clause 305.1 including
setting out, construction of shoring and bracing,
7.1( I removal of stumps and other deleterious material and
1 ) disposal up to a lead of 50m dressing of sides and
(i) bottom and backfilling in trenches with excavated
suitable material ordinary soil up to 3m depth.
2550.000
0.000
2.550 Km 12300 31365
2.25 1350.00
2.25 5220.00
2.25 3375.00
2.25 450.00
10395.00 Sqm 2.6 27027
2.95 885.000
2.89 1907.400
3.05 1525.000
2.95 1475.000
2.9 1450.000
1
1 Each 12000 12000
3071.738
-1010.875
Net 2060.863 Cum 94 193721
(1.125+1.465)/2
1.295 0.170 132.090
1.295 0.170 554.778
1.295 0.170 137.374
1.295 0.200 147.630
1.295 0.170 44.030
Total 1015.902 Cum 159 161528
4.050 0.125 151.875
4.050 0.125 642.938
4.050 0.125 164.025
4.050 0.125 144.281
4.050 0.150 91.125
4.050 0.125 50.625
Total 1244.869 Cum 500 622434
(1.425+1.725)/2
1.440 0.125 108.000
1.440 0.125 457.200
1.440 0.125 116.640
1.440 0.125 102.600
1.440 0.125 54.000
1.440 0.125 36.000
7140.000 1927.8
7140.000 Sqm 13 92820
7140.000 15279.6
7140.000 Sqm 95 678300
7140.000
7140.000 Sqm 37 264180
3.75 0.20 136.500
3.75 0.20 71.250
(3.4+1.5)/2
2 2.45 63.210
1.53 2.2 12.791
1.53 0.15 0.872
1 1.4 42.000
1 1.65 16.995
1 1.55 22.165
1 1.4 28.000
1 1.4 14.000
1 1.45 21.750
2 0.15 3.870
1.53 0.15 0.275
(1.7+1.3)/2
1.5 1.2 22.140
1 0.2 2.000
1 0.2 2.000
1 0.2 3.000
1 0.2 60.000
116.379 Cum 3247 377884
(1.3+0.4)/2
0.85 2.65 27.706
7.500
Total 7.500 Rmt 4559 34193
7.500
7.500
7.500
7.500