Effective March 2019

Airport Development
Reference Manual
Edition 11

Forecasting and planning sections


produced in collaboration with ACI
Effective March 2019

Airport Development
Reference Manual
Edition 11

International Air Transport Association


Montreal—Geneva
NOTICE
DISCLAIMER. The information contained in this
publication is subject to constant review in the
light of changing government requirements and
regulations. No subscriber or other reader should
act on the basis of any such information without
referring to applicable laws and regulations
and/or without taking appropriate professional
advice. Although every effort has been made to
ensure accuracy, the International Air Transport
Association shall not be held responsible for any
loss or damage caused by errors, omissions,
misprints or misinterpretation of the contents
hereof. Furthermore, the International Air
Transport Association expressly disclaims any
and all liability to any person or entity, whether a
purchaser of this publication or not, in respect of
anything done or omitted, and the consequences
of anything done or omitted, by any such person or
entity in reliance on the contents of this publication.

© International Air Transport Association. All


Rights Reserved. No part of this publication
may be reproduced, recast, reformatted or
transmitted in any form by any means, electronic
or mechanical, including photocopying, recording
or any information storage and retrieval system,
without the prior written permission from:

Senior Vice President


Airport, Passenger, Cargo and Security
International Air Transport Association
800 Place Victoria
P.O. Box 113
Montreal, Quebec
CANADA H4Z 1M1

Airport Development Reference Manual, 11th Edition


Material No.: 9044-11
ISBN 978-92-9229-853-1
© 2019 International Air Transport Association. All rights reserved.
Montreal—Geneva
Table of Contents
Acknowledgements ........................................................................................................................................... ix

Section 1—Introduction ..................................................................................................................................... 1


1.1 IATA–Who We Are; What We Do ...................................................................................................... 1
1.2 IATA's Airport Activities ...................................................................................................................... 1
1.2.1 Airport Consultative Committees (ACCs) ..............................................................................2
1.2.2 IATA Consulting Services for Airports...................................................................................2
1.2.3 International Industry Working Group ...................................................................................3
1.3 Other IATA Airport Activities .............................................................................................................. 4
1.4 Airports Council International (ACI) Collaboration .............................................................................4
1.4.1 Introduction to Airports Council International (ACI)...............................................................4
1.5 Purpose of the Airport Development Reference Manual ...................................................................5
1.6 Emerging Trends................................................................................................................................ 6
1.7 How to Use the ADRM ...................................................................................................................... 6
1.8 Reference Marks ................................................................................................................................ 7

Section 2—Forecasting...................................................................................................................................... 9
2.1 Introduction and Definition ............................................................................................................... 10
2.2 Economic Base for Air Travel........................................................................................................... 12
2.2.1 Airport Catchment Area....................................................................................................... 12
2.2.2 Socioeconomic Base........................................................................................................... 13
2.2.3 Transfer Traffic .................................................................................................................... 14
2.2.4 Airline Yields........................................................................................................................ 15
2.2.5 Tourism ............................................................................................................................... 15
2.2.6 Trade ................................................................................................................................... 17
2.2.7 Intermodal Transportation ................................................................................................... 17
2.2.8 Economic Base Data Analysis ............................................................................................ 18
2.3 Historical Aviation Activity ................................................................................................................ 18
2.3.1 Data Collection .................................................................................................................... 19
2.3.2 Airport Role ......................................................................................................................... 23
2.3.3 Historical Passenger Volumes ............................................................................................ 24
2.3.4 Top Domestic and International Destinations .....................................................................24
2.3.5 Historical Market Share by Airline .......................................................................................24
2.3.6 Historical Air Cargo Tonnage .............................................................................................. 25
2.3.7 Historical Movements by Segment......................................................................................25
2.3.8 Forecast Impact Factors...................................................................................................... 26

11TH EDITION, MARCH 2019 iii


Airport Development Reference Manual

2.4 Competitive Analysis ........................................................................................................................ 26


2.5 Review of Existing Forecasts ........................................................................................................... 27
2.6 Common Forecasting Techniques ................................................................................................... 27
2.6.1 Trend/Time Series............................................................................................................... 28
2.6.2 Consensus Forecasts.......................................................................................................... 28
2.6.3 Market Share Forecasts ...................................................................................................... 29
2.6.4 Econometric/Regression Model ..........................................................................................29
2.7 Passenger Activity Forecast............................................................................................................. 34
2.7.1 Passenger Activity Segments.............................................................................................. 34
2.7.2 Passenger Activity Benchmarking.......................................................................................35
2.7.3 Passenger Activity Alternative Scenarios............................................................................35
2.8 Baggage Forecast ............................................................................................................................ 36
2.9 Air Cargo Activity Forecast............................................................................................................... 37
2.9.1 Air Cargo Supply and Demand ........................................................................................... 37
2.9.2 Cargo Data Analysis............................................................................................................ 39
2.9.3 Cargo Market Forecast Benchmarking ...............................................................................40
2.9.4 Cargo Activity Forecast ....................................................................................................... 41
2.10 Air Transport Movement Forecast.................................................................................................... 42
2.10.1 ATM Segments.................................................................................................................... 42
2.10.2 Passenger ATMs................................................................................................................. 42
2.10.3 Freighter ATM Forecast ...................................................................................................... 46
2.10.4 General Aviation ATM Forecast ..........................................................................................47
2.10.5 Military/Government ATM Forecast.....................................................................................49
2.10.6 Total ATM Forecast............................................................................................................. 49
2.11 Peak Period Forecast....................................................................................................................... 49
2.11.1 Peak Period Traffic Measure............................................................................................... 49
2.11.2 Incorporating Directionality into Peak Hour Analysis ..........................................................51
2.11.3 Peak Period Forecasts ........................................................................................................ 51
2.11.4 Conclusions Regarding Peak Period Analysis ....................................................................53

Section 3—Planning ......................................................................................................................................... 55


3.1 Introduction....................................................................................................................................... 55
3.2 Master Planning ............................................................................................................................... 55
3.2.1 Introduction.......................................................................................................................... 56
3.2.2 Consultation ........................................................................................................................ 60
3.2.3 The Master Planning Process ............................................................................................. 65
3.2.4 Preplanning ......................................................................................................................... 68
3.2.5 Traffic Forecasts.................................................................................................................. 72
3.2.6 Data Collection, Site Evaluation and Facility Potential .......................................................73
3.2.7 Requirements Analysis........................................................................................................ 79

iv 11TH EDITION, MARCH 2019


Table of Contents

3.2.8 Development of Options...................................................................................................... 96


3.2.9 Environmental Responsibility ............................................................................................111
3.2.10 Land Use Planning ............................................................................................................ 121
3.2.11 Outline Development Plan................................................................................................. 128
3.2.12 Financial Assessment ....................................................................................................... 132
3.2.13 Reporting/Deliverables ...................................................................................................... 142
3.2.14 Master Planning on a Greenfield Site ...............................................................................147
3.2.15 Checklist for the Successful Opening of a New Airport ....................................................160
3.2.16 References ........................................................................................................................ 161
3.3 Airside Infrastructure ...................................................................................................................... 162
3.3.1 Runways............................................................................................................................ 162
3.3.2 Taxiways and Taxi-lanes................................................................................................... 171
3.3.3 Aprons .............................................................................................................................. 176
3.3.4 Aircraft Ground Servicing .................................................................................................. 211
3.3.5 Air and Ground Navigation Aids........................................................................................ 241
3.4 Passenger Terminal ....................................................................................................................... 255
3.4.1 Introduction........................................................................................................................ 255
3.4.2 Terminal Design Considerations ....................................................................................... 256
3.4.3 Terminal Planning Concepts ............................................................................................. 273
3.4.4 Terminal Capacity and Level of Service ...........................................................................302
3.4.5 Level of Service Concept and Planning Guidelines ..........................................................310
3.4.6 Demand–Capacity Assessment ........................................................................................316
3.4.7 The “Optimum” Solution and Balanced Capacity ..............................................................327
3.4.8 Passenger Process ........................................................................................................... 328
3.4.9 Segregation and Security Requirements in Airport Terminals ..........................................332
3.4.10 Vertical and Horizontal Circulation ....................................................................................336
3.4.11 Departures......................................................................................................................... 338
3.4.12 Transfers ........................................................................................................................... 406
3.4.13 Arrivals .............................................................................................................................. 411
3.4.14 Commercial Development ................................................................................................. 436
3.4.15 Access to Air Travel for Persons with Reduced Mobility ..................................................475
3.4.16 Toilet Provisions ................................................................................................................ 483
3.4.17 Passenger Wayfinding and Signage .................................................................................486
3.4.18 Landside Access Systems and Forecourts .......................................................................499
3.4.19 Baggage Handling............................................................................................................. 508

11TH EDITION, MARCH 2019 v


Airport Development Reference Manual

3.5 Cargo Terminal............................................................................................................................... 574


3.5.1 Introduction........................................................................................................................ 574
3.5.2 Cargo Operations .............................................................................................................. 574
3.5.3 Digital Cargo...................................................................................................................... 583
3.5.4 Air/Rail Cargo .................................................................................................................... 583
3.5.5 The Cargo Apron............................................................................................................... 584
3.5.6 The Cargo Facility ............................................................................................................. 590
3.5.7 Forecasting and Sizing...................................................................................................... 591
3.5.8 Sizing Parameters ............................................................................................................. 595
3.5.9 Cargo Design Considerations: Scope of Evaluation .........................................................599
3.5.10 Typical Cargo Flows.......................................................................................................... 610
3.5.11 Cargo Communication Controls ........................................................................................612
3.5.12 Cargo Control Regulations ................................................................................................ 613
3.5.13 Cargo Security Controls .................................................................................................... 614
3.5.14 Cargo Safety Controls ....................................................................................................... 615
3.5.15 Cargo Government Controls ............................................................................................. 615
3.5.16 Cargo Facilitation .............................................................................................................. 615
3.5.17 Express Cargo Processing................................................................................................617
3.5.18 Perishable Cargo............................................................................................................... 626
3.5.19 Mail Facilities..................................................................................................................... 634
3.6 Airport Support Elements ............................................................................................................... 638
3.6.1 Aircraft Maintenance ......................................................................................................... 638
3.6.2 Airline Administration Buildings .........................................................................................641
3.6.3 Airport Authority Administration.........................................................................................642
3.6.4 Airport Maintenance and Logistics ....................................................................................642
3.6.5 Aircraft Deicing/Anti-Icing Facilities ...................................................................................647
3.6.6 General Aviation................................................................................................................ 652
3.6.7 Ground Service Equipment Maintenance .........................................................................653
3.6.8 Aircraft In-Flight Catering Facilities ...................................................................................654
3.6.9 Airport Security/Controlled Access.................................................................................... 656
3.6.10 Vehicle Refueling and Recharging Stations......................................................................665
3.6.11 Airport Fire Services.......................................................................................................... 669
3.6.12 Utilities............................................................................................................................... 673
3.6.13 Airport Collaborative Decision-Making ..............................................................................681

vi 11TH EDITION, MARCH 2019


Table of Contents

3.7 Surface Access Systems ............................................................................................................... 689


3.7.1 Introduction........................................................................................................................ 689
3.7.2 Preplanning ....................................................................................................................... 695
3.7.3 Data Collection and Site Evaluation..................................................................................698
3.7.4 Forecasts........................................................................................................................... 701
3.7.5 Development of Options.................................................................................................... 706
3.8 Airport Simulation ........................................................................................................................... 732
3.8.1 Introduction........................................................................................................................ 732
3.8.2 History and Evolution ........................................................................................................ 733
3.8.3 Definitions and Basic Considerations................................................................................737
3.8.4 Areas of Application .......................................................................................................... 743
3.8.5 Project Methodology.......................................................................................................... 756
3.8.6 Best Practice Project Life Cycle Examples .......................................................................768
3.8.7 General Considerations and Lessons Learned.................................................................790
3.9 Airport Technology ......................................................................................................................... 800
3.9.1 Introduction........................................................................................................................ 800
3.9.2 Airport Digital Transformation............................................................................................803
3.9.3 Airport IT Trends ............................................................................................................... 810
3.10 Jet Fuel Infrastructure .................................................................................................................... 831
3.10.1 Introduction........................................................................................................................ 831
3.10.2 Components of Airport Fuel Infrastructure ........................................................................832
3.10.3 Jet Fuel Supply Design Requirements and Planning Considerations...............................839
3.10.4 Cost Estimates of Fuel Infrastructure at Airports ..............................................................847
3.10.5 Best Practice in Developing Requests for Tenders, Including Specific Models................849
3.10.6 Economic and Financial Best Practices ............................................................................850
3.10.7 Relevant Publications........................................................................................................ 852
3.11 Operational Readiness and Airport Transfer..................................................................................855
3.11.1 Overview ........................................................................................................................... 855
3.11.2 Program Structure ............................................................................................................. 857
3.11.3 ORAT Stages .................................................................................................................... 871
3.11.4 ORAT Workstreams .......................................................................................................... 879

Glossary .......................................................................................................................................................... 891

Acronyms ........................................................................................................................................................ 899

11TH EDITION, MARCH 2019 vii