F-AJI-EXP-DR03
Tgl Penerbitan : 24-Dec-18
DAILY DRILLING REPORT Tgl Persetujuan : 24-Dec-18
No. Revisi : Rev_03
Divisi : Exploration Halaman : 1 dari 1
Departemen : Geology Study & Project Seksi : Drilling
Moving
3 Rig Set Down Depth Recovered
Run No. Depth To Cored (m) Recovery (%) Coreloss RQD Comments
4 Moving / Shifting From (m)
5 Rig Set Up 135 - 152 200.60 227.60 27.00 27.00 100% ms
6 Setting Waterline
7 Make Manual Access
Activity
8 Pull Down Rods 0.25
9 Pull Up Rods 0.25
10 Condition Hole
11 Flushing Hole 1.00
12 Reaming
13 Install Casing pvc 5"
14 Install Instrument Geotech
- Piezometer (PZ)
- Vibrating Wire (VW) Total Coring
- Inclometer F-AI-GHL-01-002
15 Reaming pvc TIME
DRILLING ACTIVITY METER TIME
16 Freeing Rods From To
17 Repair Drillsite / Drain MudPit 7.00 7.15 P5M 0.25
18 Contamination Handling 7.15 7.30 p2h rig 0.25
7.30 7.45 down rods 0.25
Standby Activity 7.45 8.15 mixing muds 0.50
19 Waiting Information 8.15 8.45 flushing 0.50
20 Prepare Location 8.45 12.00 cont coring Hard Formation (200.60 - 212.60) 3.25
21 Waiting Logging 12.00 13.00 rest time 1.00
22 Blasting Evacuation 13.00 13.30 mixing muds 0.50
23 Geophysical Logging 13.30 13.45 flushing 0.25
24 Standby Moving 13.45 16.30 cont coring (212.60 - 227.60) 2.75
25 Waiting Water 16.30 16.45 flushing 0.25
26 Waiting Equipment 16.45 17.00 up rods 0.25
27 Safety Meeting / Safety Inspection
28 Bad Weather
29 Unsafe Condition
30 Broken Access
31 Rest Time 1.00 F-AI-GHL-01-003
32 mixing mud 1.00 Hivis LC stop Polymer Star Gel Super Trol ADF Swell Core Sec Foam Aus Plug
Consumable
(kg) (kg) (Liter) (sack) (Liter) (Gal) (Kg) (Liter) (Kg)
Use 5 5 3