Professional Documents
Culture Documents
Literaturestudy 191005052922
Literaturestudy 191005052922
LITERATURE STUDY
2. COACH MAINTENANCE :
• Washing Line Operation
• Sick Line Operation
• Watering of coaches
• Pre-cooling and battery charging of coaches in platform lines and washing and
stabling lines.
• Toilet discharge collection facilities
LITERATURE STUDY
3.LOCOMOTIVE OPERATION:
• Fuelling of locomotives
• Locomotive out pit operation and maintenance
• Attaching/detaching locomotive
LITERATURE STUDY
1.TRAIN OPERATION:
• Train reception/Dispatch
• Traction changing
• Placement/removal of coaching rake in/from washing lines
and stabling lines including releasing of rake by TXR
• Shunting operation including loco movement
LITERATURE STUDY
2. Train Services
• Provision for fire extinguishers, stretcher, first aid box to the guard
• Battery store
• Posting of charts and delivery of chart to train conductor
• Feeding of Platform nomination in Coach Guidance system
• Handling of driver /guard boxes
• Electrician’s room
• Switch room
LITERATURE STUDY
4. SUPPORTING SPACES:
• Porting area
• Trolley storage
• Break even equipment
• Main store & sub store
• Waiting areas & halls
• Refreshment rooms
• Public toilets
LITERATURE STUDY
1. INFORMATION SYSTEM:
• Coaching operation Information system
• Coach cabinet office working
• Announcements on Passenger Address (PA) system
• Train Enquiry
LITERATURE STUDY
2. TICKETING/BOOKING:
• Parcel booking
• Unreserved/reserved ticketing
• Luggage booking
• Ticket Checking
• Sorting room
• Room for chief booking surveyor
• Cash
• Stocks
• Office of head ticket collector
LITERATURE STUDY
4. PARCEL ACTIVITES:
• Parcel handling
• Activities of SLR (Seat cum Luggage Rack) lease holders.
• Office& storage for mail service
1. SECURITY SYSTEM:
CCTV Monitoring rooms (Concourse)
Bomb squad ( at platform 1 near admin spaces)
Luggage parcel scanners (Entry check point)
Cloak room ( waiting areas)
Police booth ( Entry check point , waiting areas , platform, parking)
LIVE CASE STUDY
CHENNAI CENTRAL
2. RAILWAY SERVICES:
Porting area (concourse level)
Ladies A/C dormitories (first floor)
Waiting halls :
1) Concourse level -243 seats
2) Pre paid waiting halls-84 seats attached with toilets
3) First floor- A/c retiring rooms& waiting halls attached with toilets
3. OTHER SERVICES:
Fire extinguishers hoes in platforms and at base kitchen
Train running room
Electrician’s room
Switch room
LIVE CASE STUDY
CHENNAI CENTRAL
3. CATERING&TOURISM:
Base kitchen (located in platform 1 with other admin spaces)
Bed roll section (platform 1 & concourse level)
Linen section (concourse level)
Restaurants(concourse level)
ATM (concourse level)
Book stalls & exhibition centre (concourse)
Drinking water taps (platforms , waiting areas)
Tourist management centre (concourse)
Public utility cell ( waiting areas)
Medical shops and Emergency Medical centre (concourse)
LIVE CASE STUDY
CHENNAI CENTRAL
LIVE CASE STUDY
LIVE CASE STUDY
Station control room (concourse level)-accessible from the non paid area
Ticketing room (concourse level)
Ticket store room (concourse level)
Audit & cash room (concourse level)
Public toilets (concourse level , platforms)
Janitor’s room ( attached to toilets)
Lunch room ( with other admin spaces)
Staff toilets ( concourse level)
Tele communication (concourse level near station control room)
LIVE CASE STUDY