Program/Course: Electrical Installation and Maintenance NC II
Unit of Competency: Perform roughing-in activities, wiring and cabling works for single-phase distribution, power, lighting and auxiliary systems Instruction: Read each of the questions in the left-hand column of the chart. Place a check in the appropriate box opposite each question to indicate your answer.
CAN I…? YES NO
Interpret correct drawing base on job requirements Determine correct quantities of conduit, fittings and accessories as per job requirements Select tools and equipment as per job requirements Perform assembling of conduit ensuring that fittings are fully inserted and tightened as per job requirements Perform conduit bending not exceeding 90° as per job requirements Install conduit couplings and elbows as per job requirement Check conduit is well threaded in line as per job requirements Follow safety procedures with standard operating procedures (SOPs) Interpret correct drawings as of job requirements Select correct materials quantities as of job requirements Select tools and equipment as per job requirements Install wire ways and cable trays as per job requirements. Follow safety procedures with standard operating procedures (SOPs) Interpret correct drawing base on job requirements Select correct materials quantities as of job requirements Select tools and equipment as per job requirements Install Auxiliary terminal cabinet as per job requirements Install Auxiliary main distribution frame as per job CAN I…? YES NO requirements Follow safety procedures with standard operating procedures (SOPs) Prepare necessary tools, equipment, materials and personal protective equipment (PPE) in line with job requirements. Identify cable pulling & installation requirements and constraints from plan and site inspection as per job requirements. Install Cable lay out equipment is set up in accordance with manufacturer's and job requirements Install cable made safe and secure in site Select suitable protective clothing and required safety devices are used Assess support structure as safe for normal working conditions Follow safety procedures based on safety regulations PPE are identified and selected in line with safety requirements Identify tools, equipment, pulling compound and safety requirements are obtained for the lay out and installation Install pulling materials properly and tensioned to required specifications Install Cable secured permanently to support structure in accordance with standard procedures Observe bending radius and loops tolerance for cable materials at all times Follow schedule of wire cutting lists based on estimates, quantity and sizes to avoid wastage Further instructions are sought if unplanned events or conditions occur Check of quality of work is done in accordance with instructions and requirements Conform final check are made to ensure that work with instructions and job requirements Notify Supervisor upon completion of work Check Tools, equipment and any surplus resources and materials are, where appropriate, cleaned and returned to storage in accordance with established procedures Clean up work area and made safe according to OHSA regulations