WHAT IS MAINTENANCE STRATEGY?
Priyanka Mishra 2
WHY MAITENANCE STRATEGY IS REQUIRED?
For Time-based or performance-based
maintenance plans in any organisation, we can
implement strategy-based maintenance. By
using maintenance strategy we can-
Priyanka Mishra 3
Maintenance Strategy
Unplanned
Planned
(Failure based)
Zero Hour
Predictive Reliability
Maintenance Preventive Corrective Breakdown
Maintenance Centered
(annual Maintenance Maintenance Maintenance
Maintenance
shutdown)
Priyanka Mishra 4
Corrective Maintenance
Corrective Maintenance refers to
action only taken when a system or
component failure has occurred .It
is thus a retro-active strategy. It is of
minor nature.
Priyanka Mishra 5
Breakdown Maintenance
Breakdown maintenance involves the repair
or replacement of equipment and
components after they have failed.
Priyanka Mishra 6
Preventive Maintenance
In Preventive Maintenance, equipment is
repaired and serviced before failure occur. The
frequency of maintenance activities is pre-
determined by schedules. Preventive
maintenance aims to eliminate unnecessary
inspection and maintenance tasks, to implement
additional maintenance tasks when and where
needed and to focus efforts on the most critical
items.
Priyanka Mishra 7
A)Time Based Maintenance(TBM)
For time-based maintenance planning, maintenance is
performed at specific intervals, for example, every two
months or every six months.
B)Conditional Based Maintenance(CBM)
Direction of maintenance actions based on indications of
equipment health as determined from non-invasive
measurement of operation and condition
indicators. CBM allows preventative and corrective
actions to be optimized by avoiding traditional calendar
or run based maintenance.
Priyanka Mishra 8
Predictive Maintenance
Predictive maintenance refers to maintenance
based on the actual condition of a component.
Maintenance is not performed according to fixed
preventive schedules but rather when a certain
change in characteristics are noted.
Corrosion/erosion sensor supplying diagnostic
information on the condition of a system or
component play an important role in this
maintenance strategy.
Priyanka Mishra 9
Zero hour Maintenance(Overhauling)
The set of tasks whose goal is to review the equipment
at scheduled intervals before appearing any failure,
either when the reliability of the equipment has
decreased considerably so it is risky to make forecasts of
production capacity . This review is based on leaving the
equipment to zero hours of operation. These reviews will
replace or repair all items subject to wear. The aim is to
ensure, with high probability, a good working time fixed
in advance.
Priyanka Mishra 10
Reliability Centered Maintenance(RCM)
Priyanka Mishra 12
Identify the
Equipment's on
the basis of
criticality
Critical Equipment
Semi Critical(which
(which affects the Not Critical(which do
partially affects the
production and do not affect the
production but have
not have its stand production directly)
its stand by)
by)
Priyanka Mishra 13
How to determine Maintenance frequency
Equipment Type
Manufacturer’s
recommendation
Priyanka Mishra 14
Preventive Maintenance Activity Flowchart
Trial Out of the equipment
will be done by operation in
Identify the major Return the PTW after PM
the presence of maintenance
equipment's whose PM is to and housekeeping of the
to ensure the work,
be done area
otherwise reissue of the
PTW .
Priyanka Mishra 15
Zero Hour Maintenance( Annual Shutdown)
Activity Flowchart
If the equipment
Planning for annual Return the PTW and trial
performance is satisfactory
shutdown on the basis of run of equipment by
then job is complete
defect reporting and operation in presence of
otherwise reissue the PTW
database. maintenance
and carry our the job
Priyanka Mishra 16
Breakdown Maintenance Activity flow chart
Return PTW and trial
Receipt of defects If equipment
run of equipment by
through defect performance is OK else
operation in presence
reporting or on phone. reissue of PTW.
of maintenance
Priyanka Mishra 17
Results For Measurement and controls of
Maintenance Strategy
Repair and Maintenance cost per unit.
Breakdown % of the equipment.
Number of rework on the equipment.
Availability of the equipment.
MTTR(Mean Time To Repair)
MTBF(Mean Time Between Failure)
Priyanka Mishra 18
Thank You………..