Professional Documents
Culture Documents
CBT SHOP LAYOUT (Draw or Design Your Institution's Facilities)
CBT SHOP LAYOUT (Draw or Design Your Institution's Facilities)
Prepare a floor plan of your institution focusing on the 9 CBT facilities (using TESDA terminology). Pls. incorporate the safety
measures
9 CBT facilities:
Safety measures:
1) Fire exit
2) Fire extinguisher
3) Emergency light
4) First aid kit
5) Signages
Provision:
Areas are designed to facilitate the smooth work flow of trainees and trainers
The support materials and other aids for learning are readily available and accessible
The accessibility of the trainee to the facilities is preferred
Security, safety and well-being of the trainee were prioritized, Safety zones are clearly identified.
Ventilation and illumination of each area should also be considered
Caution signs are placed in prominent and required areas
General area for training is identified and areas for specific training activities are clearly demarcated.