Precom List For Oil Gathering Station (Henry Toga Pahala Sianturi)
Precom List For Oil Gathering Station (Henry Toga Pahala Sianturi)
2
Function test and Setting for instrumentation in hook up area (Check valve, Chock
valve, turbine flow meter and etc) Report
3
Final Installation Check List for each of instrumentation (statement ready to
energize by vendor) Report
4 Liquid introduce by contractor Report
Lighting indoor and out door
1 Continuity for cable Report
2 Megger for cable Report
3 Function test Report
4 Illumination test Report
5 Final inspection check list (statement by contractor) Report
Concern Remarks
control fuction
Insulation
cable disconnect
proper equipment
vendor statement
cable disconnect
Insulation
control fuction
control fuction
vendor statement
Leveling
Bolt tight
Motor condition
Leveling
control fuction
vendor statement
Bolt tight
cable disconnect
Insulation
control fuction
vendor statement
Insulation
cable disconnect
control fuction
vendor statement
safety concern
equipmet funtion
vendor statement
leakage
cable disconnect
Insulation
Fuction
Ilumination
contractor statement
Concern Remarks
safety concern
Final setting