Perbandingan Harga Kontrak Kerja Pt. Laman Mining & Pt. PBPN

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PERBANDINGAN HARGA KONTRAK KERJA PT. LAMAN MINING & PT.

PBPN

KONTRAK KERJA PERUSAHAAN NO ITEM PEKERJAAN HARGA SATUAN JARAK (KM) JUMLAH REMARK
OB Removal (Clearing,Stripping,Back Fill &
1 15500 Per BCM Rp 15.500
Regreading/Spreading)
24000 Per BCM Rp 24.000
2 Ore Getting 4
15000 Per Ton Rp 15.000
Pit To WP
2250 Per BCM Rp 22.500
3 Hauling Pendek 10
1406,25 KM/Ton Rp 14.063
Sub Total Rp 44.563
4 Washing Plant 17500 Per Ton Rp 17.500
PT LAMAN MINING Sub Total Rp 17.500
5 Hauling Panjang 1400 KM/Ton 14 Rp 19.600
6 Perkerasan Areal WP 500 Per Ton Rp 500 WP To Jetty
7 Loading Excavator WP 3000 Per Ton Rp 3.000
8 Management Stock Pile 4000 Per Ton Rp 4.000
Sub Total Rp 27.100
8 Loading Excavator Stock Pile 3000 Per Ton Rp 3.000
Stock Pile Jetty To Barging
10 Angkutan DT 1400 Per Ton 1 Rp 1.400
Sub Total Rp 4.400
Total Rp 93.563
1 OB Removal ,Ore Getting & Hauling Pendek 35615 Per Ton 0-5 Rp 35.615 Pit To WP
PT PRIMA BANGUN PERSADA 2 Washing Plant 28492 Per Ton Rp 28.492
NUSANTARA 3 Hauling Panjang & Loading Excavator 71230 Per Ton 30 Rp 71.230 WP To Jetty
4 Loading Excavator & Angkutan DT 7123 Per Ton Rp 7.123 Stock Pile Jetty To Barging
Total 10 Dollar Rp 142.461 Kurs Dollar Rp. 14246,05