1

PETROCHEMICAL ENGINEERING Case Name: BHIT NETWORK-JUNE-19(1A II) FINALIZED BY BA.HSC


2 CONSULTANTS
3 C-2, BLK NO 17,GULSHAN E IQBAL, Unit Set: Field_Units
4 NEAR NATIONAL STADIUM,
KARACHI, PAKISTAN. Date/Time: Wed May 22 12:34:04 2019
5
6
7
NeotecPIPESYS v2.5.77.0: JUNE-19(1A II) FINALIZED BY BA.HSC
8
9
10
op-109
11
12
13 Pipeline Units Profile
14
15
Distance at Pipeline Origin: 0.00 m * Elevation at Pipeline Origin: 769.47 m *
16
17 Distance Elevation Run Rise Length Angle
Pipeline unit Label
18 (m) (m) (m) (m) (m) (deg)
19 Pipe * 50.00 * 777.78 * 50.00 8.31 50.69 9.436 Pipe *
20 Pipe * 100.00 * 785.28 * 50.00 7.50 50.56 8.531 Pipe #66 *
21 Pipe * 150.00 * 793.57 * 50.00 8.29 50.68 9.414 Pipe #65 *
22 Pipe * 200.00 * 798.38 * 50.00 4.81 50.23 5.495 Pipe #64 *
23 Pipe * 250.00 * 797.98 * 50.00 -0.40 50.00 -0.458 Pipe #63 *
24 Pipe * 300.00 * 800.31 * 50.00 2.33 50.05 2.668 Pipe #62 *
25 Pipe * 350.00 * 803.81 * 50.00 3.50 50.12 4.004 Pipe #61 *
26 Pipe * 400.00 * 806.78 * 50.00 2.97 50.09 3.399 Pipe #60 *
27 Pipe * 450.00 * 809.52 * 50.00 2.74 50.08 3.137 Pipe #59 *
28 Pipe * 500.00 * 812.18 * 50.00 2.66 50.07 3.045 Pipe #58 *
29 Pipe * 550.00 * 814.98 * 50.00 2.80 50.08 3.205 Pipe #57 *
30 Pipe * 600.00 * 817.42 * 50.00 2.44 50.06 2.794 Pipe #56 *
31 Pipe * 650.00 * 820.00 * 50.00 2.58 50.07 2.954 Pipe #55 *
32 Pipe * 700.00 * 822.36 * 50.00 2.36 50.06 2.702 Pipe #54 *
33 Pipe * 750.00 * 824.96 * 50.00 2.60 50.07 2.977 Pipe #53 *
34 Pipe * 850.00 * 833.38 * 100.00 8.42 100.35 4.813 Pipe #52 *
35 Pipe * 900.00 * 838.81 * 50.00 5.43 50.29 6.198 Pipe #51 *
36 Pipe * 950.00 * 841.05 * 50.00 2.24 50.05 2.565 Pipe #50 *
37 Pipe * 1000.00 * 843.69 * 50.00 2.64 50.07 3.022 Pipe #49 *
38 Pipe * 1050.00 * 844.98 * 50.00 1.29 50.02 1.478 Pipe #48 *
39 Pipe * 1100.00 * 846.63 * 50.00 1.65 50.03 1.890 Pipe #47 *
40 Pipe * 1155.00 * 846.01 * 55.00 -0.62 55.00 -0.646 Pipe #46 *
41 Pipe * 1200.00 * 844.91 * 45.00 -1.10 45.01 -1.400 Pipe #45 *
42 Pipe * 1250.00 * 846.06 * 50.00 1.15 50.01 1.318 Pipe #44 *
43 Pipe * 1300.00 * 846.06 * 50.00 0.00 50.00 0.000 Pipe #43 *
44 Pipe * 1350.00 * 846.04 * 50.00 -0.02 50.00 -0.023 Pipe #42 *
45 Pipe * 1400.00 * 842.58 * 50.00 -3.46 50.12 -3.959 Pipe #41 *
46 Pipe * 1450.00 * 836.66 * 50.00 -5.92 50.35 -6.752 Pipe #40 *
47 Pipe * 1500.00 * 834.37 * 50.00 -2.29 50.05 -2.622 Pipe #39 *
48 Pipe * 1550.00 * 831.78 * 50.00 -2.59 50.07 -2.965 Pipe #38 *
49 Pipe * 1600.00 * 832.94 * 50.00 1.16 50.01 1.329 Pipe #37 *
50 Pipe * 1650.00 * 831.74 * 50.00 -1.20 50.01 -1.375 Pipe #36 *
51 Pipe * 1700.00 * 830.20 * 50.00 -1.54 50.02 -1.764 Pipe #35 *
52 Pipe * 1750.00 * 827.42 * 50.00 -2.78 50.08 -3.182 Pipe #34 *
53 Pipe * 1800.00 * 828.39 * 50.00 0.97 50.01 1.111 Pipe #33 *
54 Pipe * 1850.00 * 828.71 * 50.00 0.32 50.00 0.367 Pipe #32 *
55 Pipe * 1900.00 * 827.34 * 50.00 -1.37 50.02 -1.570 Pipe #1 *
56 Pipe * 1950.00 * 825.37 * 50.00 -1.97 50.04 -2.256 Pipe #2 *
57 Pipe * 2000.00 * 821.78 * 50.00 -3.59 50.13 -4.107 Pipe #3 *
58 Pipe * 2050.00 * 818.81 * 50.00 -2.97 50.09 -3.399 Pipe #4 *
59 Pipe * 2100.00 * 816.20 * 50.00 -2.61 50.07 -2.988 Pipe #5 *
60 Pipe * 2150.00 * 814.03 * 50.00 -2.17 50.05 -2.485 Pipe #6 *
61 *
Erosion Velocity C 2150.00 814.03 0.00 0.00 0.00 0.000 ErosionVelocityCheck #1 *
62
63
64
65
66
67
68
69 Hyprotech Ltd. Aspen HYSYS Version 2006.5 (21.0.0.6924) Page 1 of 1
Licensed to: LEGENDS * Specified by user.