EMK

TU
CLIENT : PT.MARUWAI COAL
CONTRACT NO :
PROJECT : TUHUP EXPANTION PROJECT

WELDING SUMMARY AND


Material Description
No. Line No. SHT REV Spool First Item Second Item
Type Heat no Cert. No. DIA ( mm ) SCH Type Heat no Cert. No.

10

11

12

13
EMK
TU
CLIENT : PT.MARUWAI COAL
CONTRACT NO :
PROJECT : TUHUP EXPANTION PROJECT

WELDING SUMMARY AND


Material Description
No. Line No. SHT REV Spool First Item Second Item
Type Heat no Cert. No. DIA ( mm ) SCH Type Heat no Cert. No.

14

15

16

LEGEND : BW = butt weld FW = fillet weld THD : TREADED


TUHUP EXPANTION PROJECT
REPORT NO :
DATE :
SHEET :

SUMMARY AND MATERIAL TRACEABILITY RECORD - PIPING HDPE LINE NO :


Welder Stamp Consumable Inspection NDE Re
Welding
Item Joint No Joint TYP WPS no. Visual
proses Root Fill/cap Root Fill/cap Bathc No Fit Up Date. Welding Date RT
DIA ( mm ) SCH Result.
TUHUP EXPANTION PROJECT
REPORT NO :
DATE :
SHEET :

SUMMARY AND MATERIAL TRACEABILITY RECORD - PIPING HDPE LINE NO :


Welder Stamp Consumable Inspection NDE Re
Welding
Item Joint No Joint TYP WPS no. Visual
proses Root Fill/cap Root Fill/cap Bathc No Fit Up Date. Welding Date RT
DIA ( mm ) SCH Result.

Prepared By : Witnessed / Examination By : Re


PT.EMK PT.EMK

Name : Name : Name :


Date : Date : Date :
NDE Requirment
Remarks
UT MT/PT
NDE Requirment
Remarks
UT MT/PT

Reviewed By :