Questions On "High Temperature Leg of HWT": Doc. No.: DIC/PTDC/GTR/TS Rev 0.0) - Single Output
Questions On "High Temperature Leg of HWT": Doc. No.: DIC/PTDC/GTR/TS Rev 0.0) - Single Output
1. What is the max. time allowed for doing blowdown after performing of convective
heating?
2. If blowdown is not performed after completion of convective heating then is it
required to repeat convective heating before blowdown?
3. Submit the list of measurements and their type, range, locations, electrical
interface in r/o convective heating, cold charging line, Film cooling line?
For example:
Date:12.06.2019
Nozzle cooling system: Outlet: T and FT- Gauges or transmitters?
TT-2 at outlet is absent- Please clarify?
If first pump fails then execute abort sequence and switch on 2 nd pump
immediately.
Date:17.06.2019
TC Specsheet (ref: Doc. No.: DIC/PTDC/GTR/TS Rev 0.0)- Single output
Location of PT in film cooling line?
BPIV-TMR at limit switch level is not followed?
FCIV- Permissible leak rate - Bubble tight as per ANSI B16.104/ FCI 70.2. why
not vacuum tight?
Film cooling stopping condition-? Is it based on seat ring temperature feedback or
closure of HSV-4.