Hindustan Infratech

Project : Special Repairs to Tarang Building at Colaba

Contractor : Piyarul Sheikh


Civil Work Certified date :- 28/05/2017
RA2 Month Ending :May 2017
Amount ( Rs. )

S. No. DESCRIPTION Upto date Previous

Certified Certified

TOTAL VALUE OF WORK


Bill of Quantities
a)
1 Total Amount of This Bill
#REF! -
2 Materials Recovery
-
3 Gross Value due to Contractor
#REF! -
4 Deduction

a Retention Money @ 5%
#REF! -
b
Income tax ( TDS ) @ 1% #REF!
5 Total Deduction (a+b )
#REF! -
6 Net value due to contractor
#REF! -
7a Less: paid till date
### -
7b
With held

8 Net Payable Value due to Contractor


#REF!

Contractor Passed by
Hindustan Infratech
ecial Repairs to Tarang Building at Colaba

Contractor : Piyarul Sheikh


Certified date :- 28/05/2017
Month Ending :May 2017
Amount ( Rs. )

This bill

Certified

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

120,000.00

Approved by
Hindustan Infratech
Project:Special Repairs to Tarang Building at Colaba
Summary RA2 Piyarul Sheikh

Sr No Description Unit This bill Qty Rate Amount

1 Wall dado Sqf 2232.82 18 40190.78


2 Tile flooring Sqf 0.00 16 0.00
3 Window Cill Marble Rm #REF! 40 #REF!
4 Wall Tiles dismantling Sqf 0.00 6 0.00
5 Floor Tiles Dismantling Sqf 0.00 4 0.00
6 Wall Tiles area Plaster Sqf 215.20 6 1291.20
7 External Plaster LS 0.90 40000 36000.00
8 Kota Flooring sqf 0.00 16 0.00
9 Kota dismantling sqf 476.45 4 1905.81
Total Rs #REF!
Hindustan Infratech
Project: Special Repairs to tarang building at Colaba
Name of Contractor : PIYARUL Sheikh
Running Bill No.02
PIYARUL SHEIKH Advance Payments

SR NO DATE VOUCHER NO/ PAYMENT DONE PAYMENT DONE


CHEQUE NO THRU CHEQUE NEFT THRU CASH/ VOUCHERS
1 5/13/2017 445.00 10000.00
2 5/20/2017 449.00 15000.00
3 5/20/2017 450.00 15000.00
4 5/20/2017 451.00 15000.00
5 5/20/2017 452.00 15000.00
6 27/5/2017 20000
7 30/5/2017 30000
Total 50000.00 70000.00
Total 120000.00
Hindustan Infratech
Project: Special repairing of Trang building at Colaba.
Name of Contractor : Piyarul Sheikh
Running Bill No.02
Measurement tiles flooring at ground floor and first floor
Sr No Description Unit Nos L B H Qty

0.00
Grand Total Sqrm 0.00
Previously Paid Sqrm 0
This Bill Total Sqrm 0.00
Hindustan Infratech
Project: Special repairing of Trang building at Colaba.
Name of Contractor : Piyarul Sheikh
Running Bill No.02
Measurement of Wall dado ground floor
Sr No Description Unit Nos L B H
5 Kitchen passage short wall side wall dado Sqrm 1 3.6 2.97
Less Sqrm -1 0.6 0.6
Oposite side wall dado Sqrm 1 3.62 3.3
Partition wall of wash room Sqrm 1 2.5 0.9
Offset Sqrm 3 0.1 0.9
Jamb Sqrm 1 0.34 0.9
Partition wall otherface Sqrm 1 2.6 0.9
Plateform side tiles Sqrm 1 7.84 1.12
Partition of platform Sqrm 12 0.62 0.63
Wash room side Sqrm 1 1.7 1.44
Other side long wall Sqrm 1 3.8 2.6
Less Sqrm -1 1.5 0.15
Column offset Sqrm 1 0.525 2.63
Wall Sqrm 1 7.06 2.45
Less door Sqrm -1 0.97 2.1
Less window Sqrm -1 1.2 1.5
Less door Sqrm -1 0.87 2.45
Less window Sqrm -1 0.86 1.6
Column offset Sqrm 3 0.6 2.45
Doorjamb Sqrm 2 0.275 2.45
Window jamb Sqrm 2 0.275 1.6
6 Kitchen counter room wall tiles Sqrm 4 3.31 2.4
Less main door Sqrm -1 0.95 2.1
Door jamb Sqrm 2 0.1 2.1
Lintel Sqrm 1 0.1 0.95
Less side door Sqrm 1 0.92 2.1
Door jamb Sqrm 2 0.1 2.1
Lintel Sqrm 1 0.1 0.92
Less window Sqrm -1 0.98 0.99
Window jamb Sqrm 2 0.1 0.99
Less counter window Sqrm -1 1.94 0.98
Window jamb Sqrm 2 0.12 0.98
Window lintel Sqrm 1 0.12 1.94
Platform partition Sqrm 4 0.7 0.66
Sqrm 4 0.395 0.3
Sqrm 2 0.365 0.75
Less door Sqrm -1 0.93 2.1
Door jamb Sqrm 2 0.1 2.1
Lintel Sqrm 1 0.1 0.93
Counter lock Sqrm 2 0.69 0.67
Less door Sqrm -2 0.47 0.67
Sqrm 2 0.71 0.3
Less door Sqrm -2 0.44 0.3
7 Along with kitchen counter room Sqrm 2 3.65 2.45
Sqrm 2 3.34 2.45
Less door Sqrm -1 0.83 2.45
Less window Sqrm -1 0.87 1.6
Less other door Sqrm -1 0.97 2.1
Shelf partition wall Sqrm 4 0.57 1.6
Plateform partition Sqrm 2 0.57 0.81
Almirah wall Sqrm 2 0.4 1.9
Other plateform partition wall Sqrm 2 0.62 0.78
8 Other room Beside of counter room Sqrm 2 3.48 2.37
Sqrm 2 2.27 2.47
Less door Sqrm -1 1.03 2.1
Platform partition Sqrm 10 0.57 0.64
9 Along with room Sqrm 2 4.9 2.47
Sqrm 1 3.57 2.4
Sqrm 1 3.57 2.37
Less door Sqrm -1 1.03 2.1
Less door Sqrm -1 0.93 2.1
Door jamb Sqrm 1 0.1 2.1
Lintel Sqrm 1 0.93 0.1
Less door Sqrm -1 0.96 2.1
Less window Sqrm -1 1.2 1.5
Window jamb Sqrm 2 0.1 1.2
Sill and lintel Sqrm 2 0.1 0.96
Plateform partition Sqrm 8 0.54 0.67
Other plateform partition wall Sqrm 4 0.74 0.72
Sqrm
Grand Total Sqrm
Previously Paid Sqrm
This Bill Total Sqrm
Qty
10.69
-0.36
11.95
2.25
0.27
0.31
2.34
8.78
4.69
2.45
9.88
-0.23
1.38
17.30
-2.04
-1.80
-2.13
-1.38
4.41
1.35
0.88
31.78
-2.00
0.42
0.10
1.93
0.42
0.09
-0.97
0.20
-1.90
0.24
0.23
1.85
0.47
0.55
-1.95
0.42
0.09
0.92
-0.63
0.43
-0.26
17.89
16.37
-2.03
-1.39
-2.04
3.65
0.92
1.52
0.97
16.50
11.21
-2.16
3.65
24.21
8.57
8.46
-2.16
-1.95
0.21
0.09
-2.02
-1.80
0.24
0.19
2.89
2.13
207.51
207.51
0
207.51
Hindustan Infratech
Project: Special repairing of Trang building at Colaba.
Name of Contractor : Piyarul Sheikh
Running Bill No.02
Measurement of Kota Flooring
Sr No Description Unit Nos L B H

Sqrm
Grand Total Sqrm
Previously Paid Sqrm
This Bill Total Sqrm
Qty

0.00
0.00
0
0.00