JICA’s Contribution to Renewable Energy

Development in Indonesia

Tetsuya Harada
JICA Indonesia Office
Overview of JICA’s cooperation
- Development Financing -

Expected Contribution through on-going projects


Peusangan HPP Total Generation Capacity Increase:more than 1,500 MW
Asahan No.3 HPP Total Transmission Line Extension: more than 1,500 km

Tonsea Lama HPP


Tulehu GPP (E/S)
North West Sumatra TL
Tulehu GPP

Hululais GPP Lumut Balai GPP

Hululais GPP(E/S) Indramayu CFP


Indramayu CFP (E/S)
Jawa Sumatra HVDC (E/S)(I)(II)
HPP: Hydro Power Plant
Jawa Sumatra HVDC (III)(IV) GPP: Geothermal Power Plant
CFP: Coal Fired Power Plant
TL: Transmission Line
HVDC: High Voltage Direct Current

On-going Project Planned Project

1
Historical trend
Indonesia Power Generating Capacity from 1965
60.000
IPP Capacity
PLN Capacity without Japanese ODA
50.000
PLN Capacity with Japanese ODA
Installed Capacity (MW)

40.000

30.000

20.000

10.000

0
1965 1970 1975 1980 1985 1990 1995 2000 2005 2010 2015
Source: PLN

Japanese ODA portion of PLN owned power plant


35%
30%
25%
20%
15%
10%
5%
0%
1965 1970 1975 1980 1985 1990 1995 2000 2005 2010 2015
2
Overview of JICA’s cooperation
- Technical Cooperation and Advisory Works -

 Electric Power and Energy Policy Advisor in ESDM

 T/A for Geothermal Sector Policy and Institutional


Development (on-going)
 Geothermal policy planning (MEMR)
 Geothermal Fund operation (MOF, MEMR, PT.SMI)
 Detail survey and exploratory drilling (MEMR)

 Small Hydro IPP Development (potential identification


study was completed in August,2015)

3
Renewable Energy and Infrastructure Acceleration Facilities (Indonesia)

【Project Overview】
The Project aims to promote the mobilization of private funds for infrastructure development including