MONTHLY PERFORMANCE REPORT

NAME: SHASHANK UNIYAL, SO/C FOR MONTH OF APRIL 2019

DATE : 01/04/2019 TO 30/04/2019

A. KAPP-3&4/RAPP-7&8:

1. FOR THE COMPLETION OF THE REPORT KAPP-3&4_DC_014000_0002Rev.0; FATIGUE


ANALYSIS OF FOLLOWING MODELS HAVING CLASS-1 PIPELINES WAS PERFORMED:

a) 3331-6,7,9
b) 3332-1,2,3,4,5; 3372-1,2,3
c) 3332-6
d) 3332-7,8,9,10; 3336-6; 3321-1
e) 3332-11,12,13,15; 3333-42,43
f) 3341-21,41
g) 3341-22,42
h) 3341-23,43
i) 3341-24,44
j) UNIT-3_3311-21
k) UNIT-3_3311-22
l) UNIT-3_3311-23
m) UNIT-3_3311-24
n) UNIT-4_3311-21
o) UNIT-4_3311-22
p) UNIT-4_3311-23
q) UNIT-4_3311-24

B. OPERATING STATION ENGG SUPPORT: (NONE)

C. FLEET MODE: (NONE)

D. GHAVP-1&2:

1. GHAVP-1

A. TO DETERMINE BELLOW DISPLACEMENTS/ LOADS; WE HAVE DISCUSSED TO TAKE


SAM OF WHOLE MODEL W.R.T. BELLOW LOCATION ITSELF. SO FOR EACH MODEL
TWO ANALYSIS RUN WAS TAKEN: ONE W.R.T OCW BELLOW AND OTHER W.R.T. ICW
BELLOW. FINAL BELLOW DISPLACEMENTS/LOADS IN FOLLOWING LINES WERE
SENT TO MADAM FOR FURTHER DISCUSSION.
 3321-1,21,38 BL-1&2
 3433-3-BL-1 & BL-2
 3671-9-BL-1
 3335-101,115-BL-1
 3335-201,215-BL-1
 3335-112-BL-1 & BL-2
 3335-212-BL-1 & BL-2
 3671-6,10-BL-1
 3335-119-BL-1 & BL-2
 3335-219-BL-1 & BL-2
 3671-5-BL-1

(AMONG ABOVE LINES, THOSE WHICH ARE BELOW 109 MEL & ARE ANALYZED FOR
GHAVP; BELLOW DISPLACEMENTS ARE SENT DIRECTLY,
FOR OTHERS, KAPP MODELS ARE ANALYZED WITH GHAVP SPECTRA AND THEN
SENT THE BELLOW DISPLACEMENTS.)

2. GHAVP-2:

A. ECCS PLATE TYPE HX NOZZLE LOADS WERE REQUIRED BY PROCESS GROUP.


SO LOADS ON HX-1 & HX-2 DUE TO 108,109,110,111 AND ON HX-3 & HX-4 DUE TO
208,209,210,211 OF UNIT-1 WERE COMPARED WITH UNIT-2 PLATE HX LOADS AND
ENVELOPED LOADS WERE SENT TO PROCESS GROUP.

NOZZLE LOADS IN GHAVP-2 WERE FOUND MORE THAN GHAVP-1 (FOR MODEL 3335-
210,211,212,213,215) SO A LIMIT STOP IS SUGGESTED OF ±2 MM IN SUPPORT AT NODE
130 WHICH HAS SIGNIFICANTLY DECREASES THE NOZZLE LOADS.