CONCEPT DATOS

Duration of the shift 8 hours

Autonomous maintenance Frequency 2 times per shift


application
Time
15 minutes each

Break for lunch 30 minutes

Damage to the equipment Frequency 3 times on the turn

Time 10 minutes each

One-minute stops to feed the raw material 15 times

Damage to the Equipment 1 of 30 min / shift

Ideal machine capacity 60 pieces / minute

Good manufactured parts 18848 pieces

Rejected pieces 1152 pieces

a) Calculate the indices of availability, performance and quality.


b) Calculate the OEE
c) Calculate the types of losses (specified within 16) in units. Tiempo

8 horas

2 veces por turno

15 minutos c/u

30 minutos

3 veces en el turno

10 minutos c/u

15 veces

1 de 30 min/turno

60 piezas/minute
18848 piezas

1152 piezas