COAL FIRED POWER PLANT PROJECT PROPOSAL

1. Bidders are invited to submit a complete tender for the installation of new coal
fired power plant project include auxiliaries, other facilities and services as
stipulated in the Bidder scope of work and supply at PT “X” Mill located at
(unknown), Indonesia. The bidders are expected to offer the project to PT “X” in
the scheme of “Turnkey Project” according to the condition, to be set up in the
agreement.
2. The new plant consist of Raw water intake (sea/river/ground water),
Demineralized plant, Boiler Plant, Steam turbine and other facilities)
3. Demineralized Plant specification & performance requirements.

3.1. Conductivity less than : 5 micro Siemens/cm


3.2. SiO2, less than : 0.1 mg/kg
3.3. KmnO4 demand after gravel filter : 3.0 mg/kg
3.4. Free CO2 after degasifier, less than : 10.0 mg/kg
3.5. pH : 6.9 – 7.8
3.6. Capacity of Demin Plant (max) : 220 m3/h

4. Boiler specification & performance requirements.

Type of boiler : Circulating Fluidized Bed (CFB)


Steam output at HP Header inlet : 100 ton/h (Normal operation), 120 ton/h (Max
Continuous Rating operation) for each boiler
Quantity of boiler : 2x100 ton/h (Normal), 2x120 ton/h (MCR)
Steam pressure : 44 bar (at HP Header inlet)
Steam temperature : 440 °C (at HP Header inlet)
Turn down ratio : 4:1
Fuel flexibility : Compatible with min. 5300- Kcal/kg HHV.
Boiler efficiency : 85% minimal
Emission : Meet the newest rule of ministry of
environment & local government.
Steam purity requisites for operation of steam turbines :

Conductivity of condensate at ≤ 0.2 micro Siemens/cm


20°C measured after cation
exchanger
Silicic acid (SiO2) ≤ 0.02 mg/kg
Total iron (Fe) ≤ 0.02 mg/kg
Total copper (Cu) ≤ 0.02 mg/kg
Sodium + potassium ≤ 0.01 mg/kg

5. Steam Turbine specification & performance requirements.


5.1. Vendor
5.2. Type Condensing Turbine
5.3. Works no. -
5.4. Terminal power (norm.) 60,000 kW
5.5. Speed 6325 1/min
5.6. Extraction steam flow -
5.7. Live steam pressure 42.5 bar abs
design -
5.7. Live steam temperature 435 °C
5.8. Extraction pressure -
5.9. Exhaust pressure 0.1 bar abs
5.10. Live steam flow (norm.) 63.36 t/h
5.11. Cooling water temperature (fresh water) 32 °C
5.12. Cooling water flow -

6. The project requirements of this tender should basically covering the following
aspects :

6.1. A new coal fired boiler, which consist of :

 Coal handling & preparation (Note : Coal will be delivered on


truck).
 Coal storage ( 42 m x 132 m roofed storage and bound wall,
capable for 1 months normal operation)
 Road & lighting
 Hopper+vibrator
 Conveyor
 Coal crusher 2 units
 Magnetic separator
 Scale/weights
 Coal feeder
 Sludge & pith handling
 Hopper+vibrator
 Conveyor
 Magnetic separator
 Scale/weights
 Feeder
 Sludge/pith press & preheater/dryer
 Lime stone preparation
 Hopper+vibrator
 Conveyor
 Crusher
 Magnetic separator
 Scale/weighhts
 Feeder
 Coal fired boiler included all accessories for each boiler
 Boiler proper
 Steel frame, casing, platform and ladder
 Drum & drum internals
 Water wall system
 Economizer
 Superheater & desuperheater
 Air preheater
 Cyclone separator
 Insulation & refractory material
 Doors & holes
 Pipelines, air/gas duct & fittings of boiler proper
 Boiler valves & fittings
 Deslagging devices
 Instruments of boiler proper
 Fuel feeder (coal, sludge, pith)
 Flame probe & flame detection cool air system for
ignition system
 Boiler conservation system
 Boiler safety equipment
 Silencer
 Chemical dozing tank & pump
 Control room
 Spares for unit of boiler
 Special tools
 Fan, pump & blower
 Electrostatic precipitator 2 units in paralel operation
 Fuel (gas) ignition system
 Chimney (concrete minimum height 80 meters)
 Flue gas analyzer, Continuous Emmission Monitoring, Flue
gas flow meter
 Electrical
 Instrumentation (based DCS System, complete with : CCTV)
 Piping & valves
 Duct & insulation
 Civil work (building & structure, foundation & support)
 Steam flow meter for outlet superheater & inlet HP Header

 Ash handling (bottom & fly ash)


 Conveyor
 Ash silo (capable for 48 hours of normal operation).
 Ash handling yard (1000 m2)

 Interconnecting Piping system for steam, boiler feed water, fresh


water for cooling, sealing, service and hydrant, air
(instrument/service) and gas ignition. Specifically for sealing
water system, should be completed with water storage tank and
sealing water/booster pump.

 Boiler Feed Water Pump and Deaerator.

 Interconnecting cables 6 kV complete with all electrical aspect &


take off breaker to supply power.

 Emergency feed water pump with diesel-driven cap. ±25 m3/h


complete with storage tank 50 m3, in order to maintain water level
in boiler water wall pipe if unplanned shut down occurred at
existing power generating plant .

 Equipment erection & installation


 Site house & preparation/consumables
 Boiler erection
 Handling equipment
 Piping & insulation works
 Electrical wiring works
 Mobile crane rental
 Project insurance
 Site consumables
 Commissioning
 Plant inland transportation

 Other facilities.
 Hydrant system (min. 12 pcs) & fire prevention system
included with booster pump.
 Lighting & lighting protection
 Sewer and drainage
 Telephone & intercome system
 Laboratory equipment (Coal analyzer)
 Mechanical, electrical & instrument tool kits
 Air conditioning system.
 Wind speed & direction monitoring.
 Lightening protection.

6.2. Since the mill be operated whole year around, back up for spare
parts has to be considered accurately to secure the availability and
operational reliability.
6.3 Term of Payment
- 10% (ten percent) of total contract price as a down payment
will be paid after contract signing
- 85% (eighty five) percent of total contract price will be paid
after bidder receive Final Acceptance Certificate issued by PT
“X”
- 5% (five) percent of total contract price will be paid after end
of warranty period
 PT “X” will cover amount of 90% (ninety percent) of total contract
price with Guarantee Bank or Local L/C at the contract signing